IR 05000400/2023010

From kanterella
Jump to navigation Jump to search
Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010
ML23073A029
Person / Time
Site: Harris 
Issue date: 03/15/2023
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Haaf T
Duke Energy Progress
References
IR 2023010
Download: ML23073A029 (18)


Text

March 15, 2023

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) INSPECTION REPORT 05000400/2023010

Dear Thomas Haaf:

On February 17, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant. On March 1, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2023010

Enterprise Identifier:

I-2023-010-0026

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Power Plant

Location:

New Hill, NC

Inspection Dates:

January 30, 2023 to February 17, 2023

Inspectors:

B. Bowker, Reactor Inspector

P. Braxton, Reactor Inspector

P. Carman, Senior Reactor Inspector

J. Copeland, Reactor Inspector

S. Downey, Senior Reactor Inspector

T. Fanelli, Senior Reactor Inspector

R. Fanner, Reactor Inspector

C. Franklin, Reactor Inspector

M. Hagen, Reactor Inspector

G. Ottenberg, Senior Reactor Inspector

A. Rosebrook, Senior Reactor Analyst

Approved By:

James B. Baptist, Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a comprehensive engineering team inspection (CETI) at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Comprehensive Engineering Team Inspection The inspectors evaluated the following components and listed applicable attributes, permanent modifications, 10 CFR 50.59 evaluations/screenings, and operating experience:

Structures, Systems, and Components (SSCs) (IP section 03.01)===

For each component sample, the inspectors reviewed the licensing and design bases. The inspectors reviewed a sample of operator actions, corrective action program documents, internal and external operating experience, test records, preventive maintenance records, work orders, aging management programs, and performed a walkdown of the component or procedure. Additional component specific design attributes reviewed by the inspectors are:

(1)1AF-51, auxiliary feedwater to steam generator 1B regulating valve

Compliance with Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), and TS Bases

Visual inspection during walkdown of various components in system

Setup calculation assumption agreement with installed configuration

Calibration of demand signal

Surveillance testing & maintenance records

Conformance with manufacturer instructions for installation, maintenance, testing and operation (2)1SW-270 & 1SW-271, emergency service water return to auxiliary reservoir valves

Compliance with UFSAR, TS, and TS Bases

Visual inspection during walkdown of various components in system

Setup calculation assumption agreement with installed configuration

Periodic verification testing and post-test analyses

Surveillance testing & maintenance records

Conformance with manufacturer instructions for installation, maintenance, testing and operation (3)

'B' 125V DC bus (to include distribution panel, inverters, and battery

Compliance with UFSAR, TS, and TS Bases

Visual inspection during walkdown of various components in system

Environmental conditions

Time critical operator actions

Surveillance testing & maintenance records Protection and coordination

Design requirements

Conformance with manufacturer instructions for installation, maintenance, testing and operation

(4) Component cooling water (CCW) surge tank

Compliance with UFSAR, TS, and TS Bases

Visual inspection of tank, valves, and instruments during walkdown

Review of vendor and design requirements

Evaluation of applicable operating experience relevant to sample

(5) Motor driven auxiliary feedwater (AFW) pumps 1A-SA & 1B-SB

Compliance with UFSAR, TS, and TS Bases

Visual inspection during walkdown of various components in system

Setup calculation assumptions and agreement with installed configuration

Periodic verification testing and post-test analyses

Surveillance testing & maintenance records

Conformance with manufacturer instructions for installation, maintenance, testing and operation

(6) Refueling water storage tank (RWST)

Setpoint and total loop uncertainty calculations

Calibration procedures and acceptance criteria calculations for level instrumentation

Seismic calculations for RWST

Component modifications and associated evaluations

Design calculations (minimum usable safety related inventory, vortex formation, tank level setpoints)

Equipment protection from freezing

(7) Ultimate heat sink (UHS)

Operation of the emergency service water (ESW) system and UHS (71111.21M, appendix E, UHS item b)

Performance testing of the ESW and UHS (71111.21M, appendix E, UHS item c)

Normal and emergency service water system piping integrity review (71111.21M, appendix E, UHS item d)

Service water system intake structure walkdown and documentation review (71111.21M, appendix E, UHS item e)

Main and auxiliary reservoir (71111.21M, appendix E, UHS containment device item a)

Modifications (IP section 03.02) (3 Samples)

(1) EC 54900, Temporary Installation of a Backup Fire Pump and a Backup Jockey Fire Pump, Revision 3
(2) EC 275459, Turbine Driven Auxiliary Feedwater Controls Replacement, Revision 21
(3) EC 418409, 1CV-E004:004 (Containment Fan Cooler AH-3-1A) Motor Replacement, Revision 0 10 CFR 50.59 Evaluations/Screening (IP section 03.03) (9 Samples)

(1)10 CFR 50.59 Screening: EC 276441, Spare EDG Lube Oil Heater, ASME Section VIII, Revision 2 (2)10 CFR 50.59 Screening: EC 413875, SSPS Train A and B Auto-Safety Injection Block. Revision 3 (3)10 CFR 50.59 Screening: EC 415034, Downgrade and Replace the Auxiliary Reservoir Level Instrumentation, Revision 7 (4)10 CFR 50.59 Screening: EC 416783, Replace 1CC-252, Revision 6 (5)10 CFR 50.59 Screening: EC 417044, Reactor Vessel Material Surveillance Capsule

'Z' Analysis, Revision 0 (6)10 CFR 50.59 Screening: EC 417734, E5-0001 Transient Voltage Clarification, Revision 0 (7)10 CFR 50.59 Screening: EC 418583, Accepting New Diesel Fuel Oil Based on High Heating Value, Revision 0 (8)10 CFR 50.59 Screening: EC 419055, Restore Incore Thimbles H3 and B10 For R23 Repairs, Revision 0 (9)10 CFR 50.59 Screening: EC 420374, PRZR Level LT-491: Replace Barton with Rosemount, Revision 2

Operating Experience Samples (IP section 03.04) (1 Sample)

(1) NRC Information Notice (IN) 20-02: Flex Diesel Generator Operational Challenges

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 1, 2023, the inspectors presented the comprehensive engineering team inspection results to Thomas Haaf and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0054-JRG

PSB-1 Loss of Offsite Power Relay Settings

Rev 5

AF-0012

AF Pump (Motor & Turbine Driven) Discharge Pressure at

Minimum Recirculation Flow

Rev 6

AF-0013

Auxilliary Feedwater Verification & Setpoints

Rev 7

AF-0042

AFW Minimum Flow Rate Study

Rev 6

AF-0042

AFW Minimum Flow Rate Study

Rev 6

AF-0048

Actuator Set-up Calculation for 1AF-49, 50, and 51

CAR-C-0090

Dynamic and Hydrodynamic Analysis of Tanks

Rev. 3

CC-0016

Mechanical Analysis & Calculation for Gate Valve 1CC-252

RCP Thermal Barriers FCV

Rev. 10

CC-0016

Mechanical Analysis & Calculation for Gate Valve 1CC-252

RCP Thermal Barriers FCV

Rev. 11

CT-0030

Containment Spray Switchover Calculation

Rev. 6

CT-0032

Minimum Starting Time for Recirculation Modes

Rev. 4

DP-139

DESIGN BASIS DIFF PRESS REPORT FOR THE MOV IN

EMERG SW SYSTEM

E-6000

AC Distribution System Voltage / Load Flow / Fault Current

Study

Rev 17

E2-0001.04

Analysis for Overcurrent Protection for 6.6 KV Motors

Auxiliary Feedwater Pumps 1A-SA and 1B-SB

Rev 3

E4-0006

Safety Batteries 1A-Sa and 1B-SB Load Profile

Determination ( LOCA/SBO/FLEX)

Rev.10

E4-0008

25VDC 1E Battery Sizing and Battery/Panel Voltages for

Station Blackout/Flex Loading

Rev.12

E4-0012

25VDC 1E Battery Sizing and Battery/Panel Voltages for

LOCA

Rev. 9

E5-0001

ANALYSIS OF MOTOR OUTPUT TORQUE FOR AC

MOTOR OPERATED VALVES

EQS-0002

Refueling Water Storage Tank Level Setpoint

Rev. 9

HNP-C/EQ-1188

Weak Link Analysis of Westinghouse Valves 1CS-214,1CS-

235, 1CS-238, 1RC-113, 1RC-115, 1RC-117, 1CC-252

Rev. 4

71111.21M

Calculations

HNP-C/EQ-1213

Weak Link Analysis of Velan Valves 1CC-251 and 1CC-252

Rev. 3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

HNP-I/INST-1010

Evaluation Of RTS/ESFAS Tech Spec Related Setpoints,

Allowable Values and Uncertainties

Rev. 10

HNP-I/INST-1030

Refueling Water Storage Tank Level Instrument Loops (L-

990, L-991, L-992, L-993)

Rev. 4

HNP-M/MECH-

21

Determination of MOV Valve Factors

Rev. 5

HNP-M/MECH-

22

Determination of MOV Stem Factors

Rev. 7

HNP-M/MECH-

23

Determination of MOV Rate of Loading Factors

Rev. 5

HNP-M/MECH-

1039

Evaluation of Unwedging Thrust & Torque for Safety Related

Motor Operated Gate Valves Susceptible to Pressure

Locking

(Including Assessment of Short-Term Capabilities)

Rev. 3

HNP-M/MECH-

263

MOV SAFETY ANALYSIS MARGIN EVALUATION

RAL-21010

DESIGN, SEISMIC & WEAK ANALYSIS REPORT FOR

SIZE 30 CLASS 150 WAFER SS BUTTERFLY VALVE

WITH LIMITORQUE H3BC/SMB-00 ACTUATOR

SC-N-155

Refueling Water Storage Tank Level L-0993

Rev. 5

SC-N-156

Refueling Water Storage Tank Level L-0991

Rev. 5

SC-N-157

Refueling Water Storage Tank Level L-0990

Rev. 5

SC-N-158

Refueling Water Storage Tank Level L-0992

Rev. 4

SW-0060

MECHANICAL ANALYSIS AND CALCULATION FOR

BUTTERFLY VALVE 1SW-39 NSW SUPPLY TO ESW

HEADER A

SW-0065

MECHANICAL ANALYSIS FOR BUTTERFLY VALVE 1SW-

270 ESW HEADER RETURN TO AUXILIARY RESERVOIR

SW-0066

MECHANICAL ANALYSIS AND CALCULATION FOR

BUTTERFLY VALVE 1SW-271 ESW HEADER RETURN

TO AUXILIARY RESERVOIR

TANK-0016

Head Requirement to Prevent Vortex in RWST

Rev. 3

Corrective Action

Documents

2450043,

2319990,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2443959,

2446240,

23532,

2444635,

2446720,

2447356,

2447635,

2448544,

2182902,

285034,

2447635,

2458791,

2459685,

2409759,

2444020,

2443892,

2387019,

2388314,

2401856,

20975,

23332,

2443892,

2444020,

2444443,

2401856,

2443892, 265563,

335954, 378082,

2443861

AR 2356293

CFR 50.59 Screen, 1EC 418409 - 1CV-E004:004 Motor

Replacement

03/02/2021

AR02429910

AR2387500

EC 417044 - Reactor Vessel Material Surveillance

07/08/2021

AR2395974

EC 415034 - Downgrade and Replace the Auxiliary

Reservoir level Instrumenation

09/16/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NCR02447356

NCR 02458603

Replace Plexiglass Cover on Hydramotor Operator

01/31/2023

NCR 02458791

1AF-50 Manual Override Drive Plate Orientation Incorrect

2/01/2023

NCR 02458950

PIC-I058 PAS Conversion Change

2/02/2023

NCR 02459685

Calculation AF-0048 does not reflect currently installed

packing for 1AF-51

2/07/2023

NCR 02459890

NRC CETI - portion of completed PM-M0014 not filed as QA

document

2/08/2023

NCR 02460346

1SW-271, Leaks by When Shut

2/13/2023

NCR 02460580

AOP-020 RCP Trip Criteria Time Critical Action Validations

2/14/2023

NCR 02461030

23 NRC CETI EC 275459 Documentation Issues

2/16/2023

NCR 02461088

UFSAR 15.6.2.2 Change Made with AD Instead of Screen

2/16/2023

Corrective Action

Documents

Resulting from

Inspection

NCR 02461094

23 NRC CETI - CCW Surge Tank Baffle Plate

2/16/2023

1364-003023

4" CS 1500LB Mo Gate Valve ASME CL2

Rev. 3

1364-042206

3" 900 LB. BW CS VLV WITH HYDROMOTOR ACTUATOR

1364-044473

25V DC Switchboards 1B-SB, 2B-SB

Rev. 8

1364-051079

3" MO Gate Valve 3-GM 78FN(HDP)

Rev. 3

1364-096530 S01

30" - 150 STAINLESS STEEL WAFER BUTTERFLY VALVE

FOR H3BC / SMB-00 LIMITORQUE ACTUATOR

1364-096530 S02

30"-150 STAINLESS STEEL WAFER BUTTERFLY VALVE

FOR H3BC/SMB-00 LIMITORQUE ACTUATOR

1364-098370

MASONEILAN AFW FLOW CONTROL VALVE ASSEMBLY

1364-47014

20V PP IDP-1B-SII & IDP-1B-SIV RAB EL. 305

Rev. 4

1364-52839

ITT Actuator AH/NH-92

2165-G-0117

Containment Spray Piping Reactor Auxiliary Building Plan

EL 236.00' Unit 1

Rev. 13

2165-G-140

Chemical & Volume Control Piping Reactor Auxiliary

Building Plan

Rev. 24

2166-G-0435

Reactor Aux BLDG Tank Area Instrument Location

Arrangement Unit 1

Rev. 17

5-G-0044

FLOW DIAGRAM FEEDWATER & AUXILIARY

FEEDWATER SYSTEMS UNIT 1

Drawings

5-G-0044

Flow Diagram Feedwater & Auxiliary Feedwater Systems

Rev 55

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Unit 1

5-G-0047

FLOW DIAGRAM CIRCULATING & SERVICE WATER

SYSTEMS SHEET 1 - UNIT 1

5-G-0050

Flow Diagram Containment Spray System Unit 1

Rev. 28

5-G-0544

Simplified Flow Diagram Feedwater System Unit 1

Rev 46

5-G-0805

Flow Diagram Chemical & Volumen Control System Unit 1

Rev. 40

5-S-0545

Simplified Flow Diagram Condensate & Air Evacuation

Systems Unit 1

Rev 68

5-S-0547

SIMPLIFIED FLOW DIAGRAM CIRCULATING & SERVICE

WATER SYSTEMS SHEET 1 - UNIT 1

5-S-0684

Simplified Flow Diagram Reactor Auxiliary Building Drainage

Systems-Unit 1

Rev. 28

6-B-401, sht.

286

SERV WTR RTN HDR-A SHUTOFF VLV TO AUX

RESERVOIR 3SW-B15SA-1

6-B-401, Sht.

287

SERV WTR RTN HDR-B SHUTOFF VLV TO AUX

RESERVOIR 3SW-B16SB

6-G--0042-S01

250V DC, 125V DC & 120 V Uninterruptible AC One Line

Wiring Diagram

Rev. 34

CAR 2166 B-401,

Sht. 1945

Control Wiring Diagram Auxiliary Feedwater to Steam Gen

1B Reg Valve (FCV-2051B-SA13F-F3SA-1)

CPL-2165-S-0544

Simplified Flow Diagram Feedwater System Unit 1

291690

Flex Program Document and Procedures Input

Rev. 4

404144

Min Acceptable Wall Thickness for RFO-21 ISI Scope

Rev. 0

416783

Replace 1CC-252

Rev. 6

419700

Update MOV Hot Short Calcs

Rev. 0

54900

Design, installation details, and procedural instructions for

temporary use of a Backup Fire Pump and a Backup Jockey

Fire Pump

Rev. 3

EC 417734

E5-0001 Transient Voltage Clarification Required

EC 421828

EVALUATION OF MODEL B-1 HYDRAMOTOR FOR 1AF-

51:003 (CAT ID 72684483)

EC 52546

TRIM REPLACEMENT FOR AFW FLOW CONTROL

VALVE 1AF-50

Engineering

Changes

ESR 9500907

Hydramotor B1 Upgrade

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ESR 9700475

AFW Flow Control Valve Auto Open Override

ESR 9700502

Auxiliary Feedwater FCVs - Eval. preload on actuator spring

ESR 98-00310

Hydramotor Actuator Upgrade

AR 2336912

5AD- 0000417734 - 000 E5-0001 TRANSIENT VOLTAGE

CLARIFICATION

06/25/2020

AR 2336918

0000417734 - 000 E5-0001 TRANSIENT VOLTAGE

CLARIFICATION

09/08/2020

CAR-SH-M-066M

MISCELLANEOUS CONTROL VALVES &ACCESSORIES

DBD-106

Containment Spray System

Rev. 18

DBD-114

AUXILIARY FEEDWATER SYSTEM

DBD-114

Design Basis Document Auxiliary Feedwater System

Rev 17

DBD-128

SERVICE WATER SYSTEM TRAVELING SCREENS AND

SCREEN WASH SYSTEM WASTE PROCESSING

BUILDING COOLING WATER SYSTEM

DBD-128

Service Water System, Traveling Screens and Screen Wash

System, Waste Processing Building Cooling Water System

Revision 32

DBD-131

Component Cooling Water System

4/12/2022

DBD-202

Plant Electrical Distribution System

Rev.43

ESR 9501025

ESW butterfly valve upgrades

ESR 9900103

Hydramotor Design Inputs

FSAR

Amendment No. 8

Shearon Harris Nuclear Power Plant Unit Nos. 1 & 2

7/22/1983

HNP-M/MECH-

256

Design Basis Differential Pressure Report for MOV'S in the

Component Cooling Water System

Rev. 0

MB0199 and

MB0782

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -

ISSUANCE OF

AMENDMENT RE: STEAM GENERATOR REPLACEMENT

AND POWER

UPRATE

10/12/2001

Miscellaneous

NUREG-0660

NRC Action Plan Developed as a Result of the TMI-2

5/xx/1980

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Vol. 1

Accident

NUREG-1038

Safety Evaluation Report related to the operation of Shearon

Harris Nuclear Power Plant, Units 1 and 2

11/xx/1983

PM Template

AFW Motors

Rev 2

PM Template

AFW Pumps

Rev 2

PO 626338

Areva Inc.

03/06/2013

PO 721249

Areva Inc

2/05/2014

TCA-VAL-18.10

SBLOCA: Secure RCPs

11/12/2020

UFSAR Change

Number: 3378

AR 02119984 for Applicability Determination

5/1/2017

VM-BFM

Rosemount Transmitters & Accessories

Rev. 49

VM-BJH-V01

Vendor Manual, Motor Driven Aux Feedwater Pumps

Rev 23

VM-BJW

Valves

VM-BKB

VALVES

VM-FBG

ITT General Controls-Actuator, Hydramotor

VM-HKM

OPERATORS, MISC & SCREW JACKS

VM-MWV

Westinghouse Indicators & Instruments

Rev. 6

VM-ORD

GPE Controls Level Indicators

Rev. 2

VM-OZC

Weed Inst RTD's and Thermocouples

Rev. 12

VM-POW

ERNST Gage Gauge Glasses

Rev. 7

AR 02226090

A MDAFW PUMP - OIL LEVEL

8/21/2018

Operability

Evaluations

AR 02227962

Part 21 Potential Degraded Chips on AFW Press Controllers

8/30/2018

AD-EG-ALL-1137

ENGINEERING CHANGE PRODUCT SELECTION

AD-EG-ALL-1415

MOTOR OPERATED VALVE PERFORMANCE

PREDICTION, ACTUATOR SETTINGS, AND DIAGNOSTIC

TEST DATA RECONCILIATION

AD-EG-ALL-1453

VALVE PACKING COMPONENT PROGRAM

AD-OP-HNP-

205

HNP TIME CRITICAL ACTIONS/TIME SENSITIVE

ACTIONS

Revision 002

CM-I0031

Hydramotor Type NH-92 and NH-94 Push Type

Disassembly and Maintenance

Procedures

CM-M0054

Limitorque Valve Actuators HBC-0 through HBC-10

Disassembly and Maintenance

& 12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CM-M0226

Anchor/Darling Butterfly Valves

2, 13, & 15

CM-M0235

Westinghouse 3-Inch Gate Valves Corrective Maintenance

Rev. 9

CRC-155

Chemistry Control of Circulating Water, Service Water and

Cooling Tower Basin

Revision 39

EPT-163

Generic Letter 89-13 Inspections (Raw Water Systems and

Local Area Air Handler Inspection and Documentation)

Revision 19

MST-I0040

Refueling Water Storage Tank Level (L-0990) Calibration

Rev. 18

MST-I0041

Refueling Water Storage Tank Level (L-0991) Calibration

Rev. 18

MST-I0042

Refueling Water Storage Tank Level (L-0992) Calibration

Rev. 16

MST-I0043

Refueling Water Storage Tank Level (L-0993) Calibration

Rev. 17

MST-I0622

Bench Transmitter Response Time Test

Rev. 17

OP-103

Reactor Protection

Rev. 22

OST-1011

Auxiliary Feedwater System Operability Test Monthly

Interval Mode 1-4

Rev 19,

Completed

1/7/2023

OST-1076

Auxiliary Feedwater Pump 1B-SB Operability Test Quarterly

Interval Modes 1-4

Rev 032

OST-1076

AUXILIARY FEEDWATER PUMP 1B-SB OPERABILITY

TEST QUARTERLY INTERVAL MODES 1-4

2,

completed

04/28/2022,

2/05/2022,

07/05/2022,

10/14/2022

OST-1077

AUXILIARY FEEDWATER VALVES OPERABILITY TEST

QUARTERLY INTERVAL MODE 4-5-6

24,

completed

01/09/2023,

06/21/2021

OST-1087

Motor Driven Auxiliary Feedwater Pumps Full Flow Test

Quarterly

Interval Mode 1

Rev 26,

10/28/2022

OST-1097

MDAFWP FLOW CONTROL VALVES HIGH

DIFFERENTIAL PRESSURE STROKE TEST

2, completed

06/10/2021

OST-1211

Auxiliary Feedwater Pump 1A-SA Operability Test Quarterly

Interval Modes 1-4

Rev 27,

Completed

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2/15/2022

OST-1214

EMERGENCY SERVICE WATER SYSTEM OPERABILITY

TRAIN A QUARTERLY INTERVAL MODES 1-2-3-4-5-6

DEFUELED

97,

completed

10/13/2022

OST-1214

EMERGENCY SERVICE WATER SYSTEM OPERABILITY

TRAIN A QUARTERLY INTERVAL MODES 1-2-3-4-5-6

DEFUELED

97,

completed

10/13/2022

OST-1215

EMERGENCY SERVICE WATER SYSTEM OPERABILITY

TRAIN B QUARTERLY INTERVAL MODES 1-2-3-4-5-6-

DEFUELED

94,

completed

09/15/2022

OST-1829

Motor Driven AFW Pumps Actuation Signal On a Trip of

Both MFW Pumps and Time Response Testing of Slave

Relay K640 18 Month Interval Modes

Rev 15,

Completed

10/23/2022

OST-1859

REMOTE SHUTDOWN SYSTEM OPERABILITY - BUS

DROPS TRAIN B 18 MONTH INTERVAL MODES 5 OR 6

OR DEFUELED

29,

completed

10/25/2022

PIC-I058

CALIBRATION OF ASCO/ITT HYDRAMOTOR ACTUATOR

MODELS 92 AND 94 (DIRECT ACTING)

PLP-620

Service Water Program (Generic Letter 89-13)

Revision 21

Work Orders

13506165-01,

20460671-01,

20305908-01,

20308662-01,

20309466-01,

20323160-01,

20493939-01,

20462300-01,

20415663-01,

20444677-01,

20414777-01,

20405848-01,

20390848-01,

20401815-01,

20356185-01,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20366227-01,

00401010-01,

00401011-01,

20563095-12,

20563095-01,

20566832-02,

13300530-10,

20561982-21,

20394541-01,

20561982-02,

20561982-03,

20561982-04,

20561982-20,

20561982-21,

13516084-01,

13516084-02,

20394541-01,

20462591-01,

20561982-21,

20462591-01,

20395023-01,

20573921,

20130694-01,

20394808-01,

20488565-01,

20329324-01,

20426744-01,

20436284-01,

20529606-01,

20043323-01,

259245-

01,02151060-01,

2151062-

01,12253124-05,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

254589-04