Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel
ML13170A335
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/13/2013
From: Reis T
Division of Reactor Safety II
To:
References
Download: ML13170A335 (17)


Text

1 2

Terry Reis Director, Division of Reactor Safety NRC Region II 3

  • Introductions
  • Background
  • NRC Inspection Focus Areas
  • Major SIT Activities
  • Exam & Repair Results
  • NRC Evaluation for Continued Operations
  • NRC Conclusions
  • Public Questions and Comments 4
  • Terry Reis, Director, Division of Reactor Safety (DRS)
  • Steven Vias, Chief, Engineering Branch 3 (EB3), DRS
  • Jay Collins, Senior Materials Engineer, Nuclear Reactor Regulation (NRR)
  • Gena Woodruff, Regional Government Liaison Officer, Meeting Facilitator
  • Joe Austin, Senior Resident Inspector, DRP
  • Patrick Lessard, Resident Inspector, DRP

Dr. Robert Williams Reactor Inspector SIT Lead Inspector 6

Fission Product Barriers Barrier #1:

cladding enclosing the fuel Barrier #2:

reactor vessel & piping Barrier #3:

containment 7

  • Harris-specific evaluation
  • Reactor vessel head inspections 8

9 10 11 12 NRC SIT Focus Areas

  • Determine the facts surrounding the event
  • Observe and evaluate the examinations and the repair
  • Develop a timeline of the event
  • Assess the condition of the vessel head
  • Review the 2012 refueling outage vessel head examinations
  • Observe the nozzle weld repair process and its return to service
  • Assess the licensees compliance with regulatory requirements 14
  • Plant safety was not compromised
  • There were no indications of leakage
  • Vessel head structural integrity was not challenged
  • The flaw was successfully repaired
  • Licensee failed to identify the flaw in 2012 15

16

Contact:

NRC Region II Office of Public Affairs 404-997-4000 Roger Hannah Joey Ledford 17