Letter Sequence Other |
---|
|
|
MONTHYEARML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 Project stage: Meeting ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request Project stage: Meeting ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 Project stage: Other ML13204A2672013-09-27027 September 2013 07/09/13 Summary of Meeting with Duke Energy Regarding a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request Project stage: Meeting 2013-06-11
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19077A3672019-03-14014 March 2019 March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17250B2382017-08-30030 August 2017 TMRE Presubmittal NRC ML17044A0892017-03-0202 March 2017 EDG SR Presubmittal Meeting March 2, 2017 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13218B3372013-07-30030 July 2013 Handout for 7/30/13 Conference Call Re. Harris Emergency Response Facility Activation Timeliness and Criteria ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A0012012-04-16016 April 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML11354A3782012-02-0808 February 2012 Meeting Handout - Meeting with Carolina Power and Light Suggested Discussion Items Regarding Realistic Large Break Loss-of-Coolant Accident HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting ML1118011132011-06-29029 June 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 1 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000242011-04-20020 April 2011 Meeting Summary - Shearon Harris - List of Attendees ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0904906122009-02-18018 February 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML23114A0672023-04-26026 April 2023 April 26 2023 Public Meeting - RIPE LAR - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20099D1282020-04-0808 April 2020 Bru 2019 Mtg Slides ML20099C9992020-04-0808 April 2020 Har 2019 Mtg Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19233A0462019-08-21021 August 2019 Presentation: Harris/Nrc Pre-submittal Meeting: Risk-Informed Completion Times, August 22, 2019 ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17318A1592017-11-0808 November 2017 Meeting Slides - November 8, 2017 Teleconference with NEI Concerning Feedback on Tornado Missile Risk Evaluator Methodology -Final ML17200C7802017-07-19019 July 2017 Duke Energy Pre-submittal Meeting Presentation, August 3, 2017, Harris and Robinson License Amendment Request to Support the Transition to Duke Non-LOCA Analysis Methods, MF9824, MF9825 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML11354A2912011-12-13013 December 2011 Meeting Slides - Meeting with Carolina Power and Light Discussion of ANP-3011 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000262011-04-20020 April 2011 Meeting Summary - Shearon Harris - Slide Presentation ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0915905552009-06-0505 June 2009 Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0815502662008-05-20020 May 2008 Harris Slides, NRC Annual Assessment Meeting 2024-04-09
[Table view] |
Text
LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013
Harris Loop Voltage Setpoint Change Participants John Caves, Licensing Engineer Brian Mayall, Design Supervisor Vinod Puri, Design Engineer Agenda
Background
Description of Change Change Basis 2
Harris Loop Voltage Setpoint Change
Background
CDBI Inspection Finding there was reasonable doubt as to whether the permanently connected safety-related loads would remain available to respond to a LOOP following a non-accident degraded voltage condition, for the duration of the time delay chosen for the degraded voltage relay.
Licensing and design bases were not up to current standards Analytical limits not fully established Bases for allowable values and trip setpoints over-used engineering judgment and industry-standard practices at the time Resolves non-conservative technical specification Independent of license amendment request currently under review by NRC staff for degraded voltage time delay setpoints 3
Harris Loop Voltage Setpoint Change Description of Change Table 3.3-4 Engineered Safety Features Actuation System (ESFAS) Instrumentation Trip Setpoints Revise Unit 9.a, Loss of Offsite Power 6.9 kV Emergency Bus Undervoltage - Primary Allowable value voltage change from >= 4692 volts to >= 5329 volts Allowable value time delay unchanged at <= 1.5 seconds Trip setpoint voltage change from >= 4830 volts to >= 5454 volts Trip setpoint time delay change from <= 1.0 seconds to <= 1.46 seconds 4
(
5454 1.46 5329 TABLE 3.3-4 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS SENSOR TOTAL ERROR FUNCT IONAL UN IT ALLOWANCE ~TA~ l ~S~ TRIP SETPOINT ALLOWABLE VALUE
- 9. Loss-of-Offsite Power
- a. 6.9 kV Emergency Bus N.A. N.A. N.A. ~ 4830 volts ~ 4692 volts with Undervoltage--Primary with a ~ 1. 0 a time delay ~ 1.5 second time seconds delay.
- b. 6.9 kV Emergency Bus N.A. N.A. N.A. ~ 6420 volts ~ 6392 volts with Undervoltage--Secondary with a ~ 16 a time delay ~ 18 second time seconds (with delay (with Safety Injection).
Safety Injection) .
~ 6420 volts ~ 6392 volts with with a ~ 54.0 a ~ 60 second time second time delay (without delay (with- Safety Injection).
out Safety Injection) .
- 10. Engineered Safety Features Actuation System Interlocks
- a. Pressurizer Pressure.
P-ll N.A. N.A. N.A. ~ 2000 psig ~ 1988 psig Not P-ll N.A. N.A. N.A. ~ 2000 psig ~ 2012 psig
- b. Low-Low Tavg. P-12 N.A. N.A. N.A. ~ 553°F ~ 549.3°F SHEARON HARRIS - UNIT 1 3/4 3-34 Amemendment No. 107
Harris Loop Voltage Setpoint Change Change Basis - Voltage Setpoints Lower analytical limit for voltage established based upon procurement specifications and voltage drop calculations Motors rated at 6.6 kV Nominal bus voltage is 6.9 kV Procurement spec required operation at 75% rated voltage for 1 minute at motor terminal Calculation basis for voltage drop from bus to motor terminals Minimum allowable value and trip setpoint calculated using standard setpoint methodology Maximum analytical limit, allowable values, and trip setpoints calculated and incorporated into design basis but not in technical specifications, not part of this LAR.
6
CALCULATION 0054-JRG ATTACHMENT N PAGE N3, REV. 4 Decreasing Setpoints Form (LOOP Dropout)
PE +/-0.36V Bias1 N/A PME N/A Bias2 N/A TDUsensor N/A Bias3 N/A TDU1 +/-2.89V Total Bias N/A TDU2 N/A TDU3 N/A 2 2 1/2 TLU = (PE + TDU1 )
TLU +/-2.91V Margin Upper 225V Lower 72V 2 2 1/2 GAFT = (DR1 + MTE1 )
GAFT +/-2.09V 2 2 2 2 LAFT = (GAFT + ALTsensor + DRsensor + MTEsensor )1/2 LAFT N/A Upper Analytical Limit = 5926V, 98.8V TLU (175V, 2.91V) Upper Allowable Value (5876V, 98V)
GAFT (125V, 2.09V)
Max Allowable Setpoint (5751V, 95.9V)
Margin (225V, 3.8V)
Setpoint (5526V, 92.1V)
(MST Setpoint is 92.1V)
Margin (72V, 1.2V)
Min Allowable Setpoint (5454V, 90.9V)
(T/S Trip Setpoint is 5454V)
GAFT (125V, 2.09V)
TLU (175V, 2.91V)
Lower Allowable Value (5329V, 88.8V)
T/S Allowable Value > 5329V Lower Analytical Limit = 5279V, 88.0V
Harris Loop Voltage Setpoint Change Change Basis - Time Delay Setpoints Current time delay allowable value (1.5 seconds) originally established based upon standard TS during original licensing. An analytical limit was not used explicitly.
Time delay:
short enough to prevent damage or protective device trip due to exposure to voltage substantially below the rated value long enough to avoid spurious trips from faults or other very short term transients Current TS maximum allowable value meets criteria, therefore kept for consistency Analytical limit reverse engineered from current allowable value and verified to support criteria Trip setpoint calculated using standard setpoint methodology Minimum analytical limit, allowable values, and trip setpoints calculated and incorporated into design basis but not in Technical Specifications, not part of this LAR.
8
CALCULATION 0054-JRG ATTACHMENT N PAGE N5, REV. 4 Increasing Setpoint Form (LOOP Time Delay Relay)
PE N/A Bias1 N/A PME N/A Bias2 N/A TDUsensor N/A Bias3 N/A TDU1 +/-0.0431 Total Bias N/A TDU2 N/A TDU3 N/A 2 2 1/2 TLU = (PE + TDU1 ) + Total Bias TLU +/-0.0431 Margin Upper 0.26 Lower 0.282 2 2 2 1/2 GAFT = (ALT1 + DR1 + MTE1 ) + Total Bias GAFT +/-0.0404 2 2 2 2 LAFT = (GAFT + ALTsensor + DRsensor + MTEsensor )1/2 LAFT N/A Upper Analytical Limit = 1.503s Upper Allowable Value (1.5s)
TLU (0.0431s) T/S Allowable Value 1.5s GAFT (0.0404s)
Max Allowable Setpoint (1.46s)
T/S Trip Setpoint 1.46s Margin (0.26s)
Setpoint 1.2s Margin (0.282s)
Min Allowable Setpoint (0.918s)
GAFT (0.0404s)
TLU (0.0431s) Lower Allowable Value (0.878s)
Lower Analytical Limit = 0.875s
Harris Loop Voltage Setpoint Change Additional Discussion No directly applicable precedent Used San Onofre concepts (significantly different TS structure)
Schedule Submit in August 1 year approval requested Open Discussion/Questions 10