SHEARON HARRIS NUCLEAR PLANT NRC FIRE PROTECTION TEAM INSPECTION (FPTI) INSPECTION REPORT 05000400/2024011

Dear Thomas Haaf:

On August 14, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Plant and discussed the results of this inspection with David Hoffman, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Shearon Harris Nuclear Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC Resident Inspector at Shearon Harris Nuclear Plant.

September 10, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2024011

Enterprise Identifier:

I-2024-011-0019

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Plant

Location:

New Hill, North Carolina

Inspection Dates:

July 22, 2024 to August 14, 2024

Inspectors:

J. Alamudun, Reactor Inspector

E. Coffman, Reactor Inspector

L. Jones, Senior Reactor Inspector (Team Lead)

W. Monk, Senior Reactor Inspector

Approved By:

Daniel M. Bacon, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at Shearon Harris Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Fire Confinement 18-Month Surveillance Requirements Not Performed Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000400/2024011-01 Open/Closed

[H.12] - Avoid Complacency 71111.21N.

The NRC identified a Green Non-Cited Violation (NCV) of Shearon Harris Nuclear Power Plant Unit 1 RFOL, 2.F, Fire Protection Program, for the licensees failure to complete required surveillance requirements (SRs) associated with required barriers. Specifically, the licensee failed to inspect 189 fire wraps and four thermal shields across 5 fire areas (FA) in the Reactor Auxiliary Building (RAB).

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

a. Review deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.

b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA) analysis and SSA.

c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.

d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.

e. Perform a walkdown inspection to identify equipment alignment discrepancies. Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.

f. Ensure the selected SSCs that are subject to aging management review (AMR) pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify that the licensees aging management program activities (such as, Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.

g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dispositioned the operating experience in accordance with their processes.

(1)

(Detection/Suppression) U1 EDG A & B Fire Water Suppression System (2)

(SSD) U1 125V DC Electrical Distribution System & Aux Shutdown Panel (3)

(SSD) U1 Emergency Service Water and Normal Service Water Systems

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) FP Admin Program #1 NFPA 805 Monitoring Program (including FP Equipment SRs)
(2) FP Admin Program #2 Fire Brigade Drills and Training Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) FPP Change EC 419161 - Abandonment of Obsolete Duct Detectors

INSPECTION RESULTS

Fire Confinement 18-Month Surveillance Requirements Not Performed Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000400/2024011-01 Open/Closed

[H.12] - Avoid Complacency 71111.21N.0 The NRC identified a Green Non-Cited Violation (NCV) of Shearon Harris Nuclear Power Plant Unit 1 RFOL, 2.F, Fire Protection Program, for the licensees failure to complete required surveillance requirements (SRs) associated with required barriers. Specifically, the licensee failed to inspect 189 fire wraps and four thermal shields across 5 fire areas (FA) in the Reactor Auxiliary Building (RAB).

Description:

When the inspection team was reviewing the licensees NFPA 805 Monitoring Program and spot checking the completion of required fire protection surveillance requirements (SRs), it was discovered that the licensee had not completed the required 18-month SRs for 189 fire wrap inspections and four thermal shield inspections in the Reactor Auxiliary Building since 08/29/2019.

In 2020, a revision to this Fire Protection Test (FPT-3560 Surveillance) was issued which divided its Attachments 1 - 3 into five separate Attachments. The associated Preventive Maintenance Identification (PMID) was not updated to perform Attachments 4 and 5 as reflected with the change to the FPT. This led to the license not scheduling and completing the required fire wrap and thermal shield SRs. In review of the licensees NFPA 805 Monitoring Program, the inspectors requested the completed work-order packages for fire protection surveillance requirements associated with fire barrier inspections. In response, the licensee discovered that the required 18-month SRs in the Reactor Auxiliary Building had not been completed since 08/29/2019. The inspectors verified the SRs grace period was expired given the observed period was greater than 3 cycles.

The inspectors questioned the population of fire areas and barriers represented by missing the surveillance. In review of the attachments associated with the surveillance it was determined the licensee failed to inspect 189 fire wraps and four thermal shields in the Reactor Auxiliary Building (RAB) populated across 5 Fire Areas (FA).

Corrective Actions:

1) Schedule and perform FPT-3560 Attachments 4 and 5 as soon as possible in order to complete the missed fire wrap and thermal shield SRs.

2) Perform extent of condition review to identify other editorial preventative maintenance (PM)revisions which may have resulted in a need to revise the PM to ensure SR completions.

Corrective Action References: This issue is being tracked in the licensees CAP under NCR 2523456, HNP NRC 2024 Fire Protection Inspection: FPT-3560 Inspections Not Performed, 07/24/2024.

Performance Assessment:

Performance Deficiency: The licensees failure to complete the surveillance requirements in FPP-013, Fire Protection - Minimum Requirements, Mitigating Actions and Surveillance Requirements was a performance deficiency (PD). Specifically, for greater than 3 cycles the licensee failed to inspect 189 fire wraps and four thermal shields in the Reactor Auxiliary Building (RAB) populated across 5 Fire Areas (FA).

Screening: The inspectors determined the performance deficiency (PD) was more-than-minor because if left uncorrected it would have the potential to lead to a more significant safety concern. Specifically, the surveillance requirements were not completed for greater than 3 cycles and the large volume of fire wraps unchecked increased the risk of a fire protection feature not meeting its SR acceptance criteria in turn validating its functionality. Additionally, IMC 0612, APP E, Examples of Minor Significance, Example 11.b supports dispositioning this PD as More-than-Minor.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. Using IMC 0609, Appendix F, Attachment 1, and after the licensee completed the missed fire wrap and thermal shield SRs, the inspectors determined the issue was of very low safety significance (GREEN). This was because the fire confinement finding continued to provide adequate fire endurance to prevent fire propagation through the fire confinement element, given the combustible loading and location of equipment important to safe shutdown in the fire area of concern (Question 1.4.4-A).

Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Specifically, the license didnt recognize and plan for possible mistakes when the Preventive Maintenance Identification (PMID) was not updated to reflect the changes made in the FPT surveillance requirement revision.

Enforcement:

Violation: HNP license condition 2.F requires in part, that the licensee shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), NFPA Standard 805, 2001 Edition. NFPA 805, Section 3.2.3, Procedures, states Procedures shall be established for implementation of the fire protection program. In addition to procedures that could be required by other sections of the standard, the procedures to accomplish inspection, testing, and maintenance for fire protection systems and features credited by the fire protection program.

FPP-013, Fire Protection - Minimum Requirements, Mitigating Actions and Surveillance Requirements, Sections 6.6.3 and 6.7.3 state in part 18-month visual surveillance requirements were required for the 189 fire wraps and four thermal shields in the licensees RAB.

Contrary to the above, from 08/29/2019 until July 2024 (59 months) the license failed to perform the required FPT 18-month surveillance requirements for 189 fire wraps and four thermal shields in the Reactor Auxiliary Building (RAB).

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 14, 2024, the inspectors presented the NRC inspection results to David Hoffman, Plant Manager and other members of the licensee staff.

THIRD PARTY REVIEWS No third-party reviews were conducted during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

HNP-E/ELEC-

0003

Safe Shutdown Analysis Manual Action Feasibility

Rev. 10

Calculations

HNP-M/MECH-

27

NFPA 805 Transition - Fire Area 12-A-CR Fire Safety

Analysis

Rev. 4

Corrective Action

Documents

PRR 734935

FPT-3560 Rev. 015

2/26/2015

AR 2524639

HNP NRC 2024 Fire Protection Inspection: Non-CPE

Cables Routing Questions

08/05/2024

NCR 2523456

HNP NRC 2024 Fire Protection Inspection: FPT-3560

Inspections Not Performed

07/24/2024

NCR 2523606

HNP NRC 2024 Fire Protection Inspection: Trash

Observation

07/25/2024

NCR 2524890

Attach Fire Wrap Over B5245 SR4

08/07/2024

PRR 2523212

FPP-013 Correct Editorial/Typographical Error

07/23/2024

PRR 2523305

FPP-013 Definition of Safe Shutdown (SSD) to Reflect

NFPA 805 Licensee Condition

07/23/2024

PRR 2524907

AP-301 Procedure Clarification on Temporary Heaters

08/07/2024

WR 20273290

ESW Pipe Tunnel Temporary Power Cables Clean-up

08/06/2024

Corrective Action

Documents

Resulting from

Inspection

WR 20273313

Attach Fire Wrap Over B5245 SR4

08/07/2024

1364-95310

Fire Wrap Schematic 310

Rev. 1

5-S-0547

Flow Diagram Circulating & Service Water Systems

Rev. 67

5-S-0548

Flow Diagram Circulating & Service Water Systems

Rev. 74

5-S-1324

Simplified Flow Diagram Residual Heat Removal System

Rev. 12

Drawings

6-SK-E-542 S17

Reactor Auxiliary Building Safe Shutdown Analysis in

Case of Fire EL 286

05/10/1983

Fire Plans

A22-5-261-0606

Pre-Fire Plan RAB EL 261 FA 1-A-BAL

Rev. 4

AOP-004-BD

Remote Shutdown - Basis Document

Rev. 34

AOP-036-BD

Safe Shutdown Following a Fire - Basis Document

Rev. 20

DBD-105

Residual Heat Removal System

Rev. 14

71111.21N.05

Miscellaneous

DBD-128

Service Water System Traveling Screes and Screen

Wash System Waste Processing Building Cooling Water

System

6/14/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DBD-201

Emergency Diesel Generator System

2/13/2021

DBD-202

Plant Electrical Distribution System

5/9/2024

DBD-308

Main and Auxiliary Control Boards and Panels

6/21/2018

DBD-316

FIRE BARRIER SYSTEM

Rev. 10

DPS-1552.10-00-

0006

Non-Controlled Plant Equipment (CPE) Cable

Rev. 5

ECA-0.0

Background

Loss of All AC Power

Rev. 3

HNP APT 2022

Annual Live Fire Training

Rev. 0

Self-Assessment

2499654

HNP NRC Fire Protection Team Inspection Readiness

Assessment

04/02/2024

TTC1679-N

(Initial) TTC1680-

N

(Requalification)

Duke Energy-Nuclear Training Scott SCBA

Rev. 0a

TTC1772-N

Emergency Action Levels

Rev. 1

TTC1982-N

SCOTT NIOSH AIR PAK SCBA Initial TTC1982-N,

SCOTT NIOSH AIR PAK SCBA Requalification TTC1983-

N

Rev. 0a

AD-DC-ALL-0201

DEVELOPMENT AND MAINTENANCE OF

CONTROLLED PROCEDURE MANUAL PROCEDURES

Rev. 25

AD-EG-ALL-1503

FIRE PROTECTION PERFORMANCE MONITORING

AND OTHER PROGRAM ELEMENTS

Rev. 5

AD-HS-ALL-0101

INDUSTRIAL SAFETY

Rev. 16

AD-OP-HNP-

205

HNP Time Critical Actions/Time Sensitive Actions

Rev. 3

AD-TQ-ALL-0083

Self Contained Breathing Apparatus (SCBA) Training

Program

Rev. 5

AD-TQ-ALL-0086

Fire Brigade and Hazmat Training

Rev. 6

AOP-004

Remote Shutdown

Rev. 71

AOP-036

Safe Shutdown Following a Fire

Rev. 55

AOP-036.01

Fire Area: 1-A-ACP

Rev. 17

AOP-036.08

Fire Areas: 1-A-SWGRA and 1-A-SWGRB

Rev. 23

Procedures

EOP-E-0

Reactor Trip or Safety Injection

Rev. 15

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EOP-ECA-0.0

Loss of All AC Power

Rev. 11

FPP-013

FIRE PROTECTION - MINIMUM REQUIREMENTS,

MITIGATING ACTIONS AND SURVEILLANCE

REQUIREMENTS

Rev. 116

FPT-3001

MOTOR DRIVEN MAIN FIRE PUMPFUNCTIONALITY

TEST MONTHLY INTERVAL

Rev. 15

FPT-3006

FIRE MAIN FLOW TEST THREE YEAR INTERVAL

MODES: ALL

Rev. 10

FPT-3560

FIRE WRAP INSPECTION 18-MONTH INTERVAL

Rev. 14

MPT-E0019

Diesel Fire Pump Battery Test

Rev. 9

OPT-3303

MAIN DRAIN TEST TURBINE BUILDING 18 MONTH

INTERVAL

Rev. 11

OPT-3308

MAIN DRAIN TEST OUT LYING BUILDING 18 MONTH

INTERVAL

Rev. 14

PD-FP-ALL-1500

FLEET FIRE PROTECTION PROGRAM MANUAL

Rev. 3

WO 20235147

FIRE WRAP INSPECTION 18-MONTH INTERVAL

08/29/2019

WO 20272984

FIRE WRAP FOR 4-INCH CONDUIT 16267Z-SB HAS A

SMALL TEAR

07/30/2024

WO 20571013

U2 EDG BLDG, INSTALLED EUH NOT OPERATING

11/28/2022

Work Orders

WO 20678555

FPP-013 INSPECTION OF FIRE WRAP AND THERMAL

SHIELDS

07/30/2024