ML20202E133
| ML20202E133 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 07/03/1986 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20202E136 | List: |
| References | |
| NUDOCS 8607140292 | |
| Download: ML20202E133 (2) | |
See also: IR 05000456/1986029
Text
SMS
,
.
w
JUL 0 31986
Docket No. 50-456
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the announced preoperational physical protection inspection
conducted by Messrs. J. L. Belanger and J. R. Kniceley of this office on
June 5-6, 9-13, and 17, 1986, of activities at the Braidwood Nuclear Power
Station, Unit I, authorized by NRC Construction Permit No. CPPR-132 and to
the discussion of our findings with Mr. C. Schroeder at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of
this inspection will not be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
fjj71j0292860703
o
0500
6
W. L. Axelson, C'ief
Nuclear Materials Safety and
j
,. >/
Safeguards Branch
7
Enclosure:
Inspection Report
-} l-
No. 50-456/86029(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
l
l
,
See Attached Distribution
RIII
RIII
RIIIs
RI
RIII
Q
did
@
[;
fJ ~ P Enclosure ContaIns
BAe Fanger/mj
Kniceley
Pirtle
Litt
Axelsoil
SAFEGUAhDS INFORHATION
T
g/3fgc,
7/3fet.
7/3/ %
Upon Separation This
Page is Decontrolled
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
-
ca rr nr's ~~m
' n t rA D R 4 8 T]
vs is L s5 V fT \\id d
li tt v a ta ..
4
Commonwealth Edison Company
2
JUL 0 31986
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NPR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
Enclosure Cont, ins
SAFEGUARDS ll4 FORMAT 10ii
Upon Separation This
F
- .crotrolled
S-
..n
.
,,
-
J