ML20202E133

From kanterella
Jump to navigation Jump to search
Forwards Preoperational Physical Protection Insp Rept 50-456/86-29 on 860605-17.No Violations Noted
ML20202E133
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 07/03/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20202E136 List:
References
NUDOCS 8607140292
Download: ML20202E133 (2)


See also: IR 05000456/1986029

Text

SMS

,

.

w

JUL 0 31986

Docket No. 50-456

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the announced preoperational physical protection inspection

conducted by Messrs. J. L. Belanger and J. R. Kniceley of this office on

June 5-6, 9-13, and 17, 1986, of activities at the Braidwood Nuclear Power

Station, Unit I, authorized by NRC Construction Permit No. CPPR-132 and to

the discussion of our findings with Mr. C. Schroeder at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2).

This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21.

Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

fjj71j0292860703

o

0500

6

W. L. Axelson, C'ief

Nuclear Materials Safety and

j

,. >/

Safeguards Branch

7

Enclosure:

Inspection Report

-} l-

No. 50-456/86029(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

l

l

,

See Attached Distribution

RIII

RIII

RIIIs

RI

RIII

Q

did

@

[;

fJ ~ P Enclosure ContaIns

BAe Fanger/mj

Kniceley

Pirtle

Litt

Axelsoil

SAFEGUAhDS INFORHATION

T

g/3fgc,

7/3fet.

7/3/ %

Upon Separation This

Page is Decontrolled

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

-

ca rr nr's ~~m

' n t rA D R 4 8 T]

vs is L s5 V fT \\id d

li tt v a ta ..

4

Commonwealth Edison Company

2

JUL 0 31986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

ACRS

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NPR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

Enclosure Cont, ins

SAFEGUARDS ll4 FORMAT 10ii

Upon Separation This

F

.crotrolled

S-

..n

.

,,

-

J