Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900241990-09-27027 September 1990 Insp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures ML20056A5101990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890251989-09-25025 September 1989 Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.Violations Being Considered for Enforcement.Major Areas Inspected:Two Events Re Overspeeding & Tripping of Auxiliary Feedwater Pump IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items IR 05000413/19890071989-04-20020 April 1989 Insp Repts 50-413/89-07 & 50-414/89-07 on 890226-0325. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Rept IR 05000413/19890081989-04-19019 April 1989 Insp Repts 50-413/89-08 & 50-414/89-08 on 890313-14,16-17 & 27-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program Implementing Procedures, Reviews of NDE Procedures & Personnel Qualifications ML20244A8991989-03-29029 March 1989 Insp Repts 50-413/89-05 & 50-414/89-05 on 890204-25. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Nonroutine Event Repts IR 05000413/19890041989-03-13013 March 1989 Insp Repts 50-413/89-04 & 50-414/89-04 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness Re Emergencies ML20246L6721989-03-0303 March 1989 Insp Repts 50-413/89-02 & 50-414/89-02 on 890130-0203. Violations Noted.Major Areas Inspected:Preoutage Planning, Preparations & Mgt Support for Implementing Licensee Radiation Protection Program ML20236A2241989-02-25025 February 1989 Resident Insp Repts 50-413/88-38 & 50-414/88-38 on 881127-890204.One Strength,One Weakness & One Apparent Violation Identified.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observation & Procedures Review IR 05000413/19890031989-02-23023 February 1989 Insp Repts 50-413/89-03 & 50-414/89-03 on 890130-0203.One Weakness Identified Re Photomultiplier Tube.Major Areas Inspected:Design Changes,Plant Mods & Licensee Action on Previously Identified Insp Findings ML20206J5961988-11-15015 November 1988 Insp Repts 50-413/88-34 & 50-414/88-34 on 880926-1025. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880331988-10-14014 October 1988 Insp Repts 50-413/88-33 & 50-414/88-33 on 880826-0925. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880301988-09-20020 September 1988 Insp Repts 50-413/88-30 & 50-414/88-30 on 880726-0826.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of Licensee Nonroutine Event Repts & Part 21 Repts IR 05000413/19880271988-09-0909 September 1988 Insp Repts 50-413/88-27 & 50-414/88-27 on 880719-22. Violations Noted.Major Areas Inspected:Radiation Protection, Including Organization & Mgt Controls,Solid Waste Program, Transportation & Licensee Action on Previous Insp Findings IR 05000414/19880311988-09-0808 September 1988 Partially Withheld Insp Repts 50-413/888-31& 50-414/88-31 on 880815-19 (Ref 10CFR2.790 & 73.21).No inspector-identified Violations or Deviations Noted.Major Areas Inspected:Testing & Maint & Physical Barriers - Protected Area ML20154E9461988-09-0606 September 1988 Page 11 to Insp Repts 50-413/88-25 & 50-414/88-25 IR 05000413/19880261988-09-0202 September 1988 Insp Repts 50-413/88-26 & 50-414/88-26 on 880801-05.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measurements for in-plant Radiochemcial Analysis ML20154A6241988-08-31031 August 1988 Insp Repts 50-413/88-29 & 50-414/88-29 on 880801-05. Violation Noted.Major Areas Inspected:Areas of Catawba Safety Review Group Activities & 10CFR21 Reportability Determinations IR 05000413/19880281988-08-23023 August 1988 Insp Repts 50-413/88-28 & 50-414/88-28 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Waste Mgt,Effluent Sampling,Monitoring & Analysis & Radiological Environ Monitoring ML20153C5451988-08-19019 August 1988 Insp Repts 50-413/88-25 & 50-414/88-25 on 880626-0725. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of LERs & Followup of Previously Identified Items & NRC Bulletins ML20151E5681988-07-0808 July 1988 Insp Repts 50-413/88-22 & 50-414/88-22 on 880526-0625. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of Licensee Nonroutine Event Repts & Previously Identified Items IR 05000413/19880231988-06-22022 June 1988 Partially Withheld Insp Repts 50-413/88-23 & 50-414/88-23 on 880607-10.Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program & Organization,Records & Repts & Alarm Stations IR 05000413/19880191988-06-21021 June 1988 Insp Repts 50-413/88-19 & 50-414/88-19 on 880517-20 & 0603. No Violations or Deviations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Emergency Facilities & Organization & Mgt Control 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Inspection Report - Catawba - 1985034 |
---|
|
|
Text
-
-,
y pruo UNITED STATES
.
o NUCLEAR REGULATORY COMMisslON
[ p REGION ll 3 j 101 MARIETTA STREET, * c ATLANTA, GEORGI A 30323
% .* /
Report No.: 50-414/85-34 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket No.: 50-414 License No.: CPPR-117 Facility Name: Catawba Inspection C : gust 12 - 16, 1985 Inspec r: E 9DAte Signed
.L C ley Approved by:
J. J. Jrlake, Section Chief Datd Signed E gf eering Branch iv sion of Reactor Safety SUMMARY Scope: This routine, unannounced inspection entailed 38 inspector-hours on site in the areas of fabrication and welding of supports, preservice inspection -
review of. program, preservice inspection - review of procedures, preservice inspection - data review and evaluation, and preservice inspection - independent re-examination of welds using Region Il personnel and equipmen Results: No violations or. deviations were identifie i e
8509180023 850906 PDR ADOCK 0 %
.
o l
l
l
--
e
.
.
REPORT DETAILS Persons Contacted Licensee Employees
,
- L. Vincent, Construction Engineer - Civil
- J. Whichard, Electrical Engineer
- J. Cherry, Operation Quality Assurance - Inservice Inspection (ISI)
- B. Throneburg, Status and Control
- R. Giles, ISI Coordinator - Operations
- E. Williams, Project Quality Assurance Technician Other licensee employees contacted included construction craftsmen, engineers, technicians, mechanics, and office personne NRC Resident Inspector
- P. K. Van Doorn - Senior Resident Inspector
'
- Attended exit interview Exit Interview The inspection scope and findings were summarized on August 16, 1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the license Unresolved Item 50-414/85-34-03, Apparent Failure of Babcock and Wilcox to Perform Audits of Their Inspection Services Division, Work Activities on Unit 2, paragraph Unresolved Item 50-414/85-34-02, Clarification of Procedure NDE-11 and NDE-12 Needed, paragraph Inspector Followup Item 50-414/85-34-01, Demonstrate Ability of Ultrasonic Equipment to Discern Crack in Centrifugally Cast Stainless Steel, paragraph Inspector Followup Item 50-414/85-34-04, Technical Review of Preservice Records, paragraph The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspectio . Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio e
.
.
4. Unresolved Items Unresolved items are matters about which more information is required to detemine whether they are acceptable or may involve violations or deviations. New unresolved items identified during this inspection are discussed in paragraphs 6.b and . Fabrication and Welding of Supports (55050)
On August 12, 1985, the inspector made a general inspection of the licensee's pipe fabrication shop, machine shop, and metal fabrication shop to determine through direct observation whether welding activities were performed in accordance with American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (B&PV) Code and Catawba's Unit 2 Safety Analysis Report (SAR) commitment In the metal fabrication shop, the inspector observed journeymen metal workers fabricating sway struts to be used on safety-related piping system at the Catawba and McGuire site The applicable code for the sway struts fabrication was the 1974 edition of the ASME Code, Subsection NF, with addenda through Summer 197 The inspector reviewed the fabrication drawings, work instructions, documentation, observed module assembly of the end bracket detail to assure clearances were maintained for welding, and verified control of filler materials from the fabrication area to and including the weld rod issue station. During the inspection the inspector questioned why visual inspection was the final acceptance criteria in lieu of magnetic particle examination when the struts observed were to be used on Class A, 8, and C piping systems. The inspector was referred to the licensee's engineering group for resolution of the inspection requirements. The inspector held discussions with the cognizant engineers and found that these struts were linear type pipe supports and that full penetration welds on linear type supports only required final visual inspection in accordance with subsection NF of the ASME cod .
Within the area examined, no violations or deviations were observed, 6. Preservice Inspection - Review of Program (73051B) Unit 2 The inspector reviewed the licensee's preservice inspection (PSI) program to ascertain whether the -licensee's program pertaining to the preservice inspection of Unit 2 was complete and in conformance with regulatory requirements and licensee commitment In accordance with these requirements,Section XI, of the ASME B&PV code (74S 75) is the applicable code. Babcock and Wilcox (B&W) was used by the licensee to perform the ultrasonic examinations of piping and component Radiography required by the program was per'ormed by the licensee and i surface and visual examinations were performed by both the licensee and B& !
Eddy current examinations were performed by CONAM for Unit 2; however, CONAM's program and procedures were not reviewed by the inspector.-
I
. . . - - - - - - .- .-- .- .- -
r r
.
.
The following specific areas of the program were reviewed for compliance; Program had been approved by the licensee Quality Assurance (QA) plans and procedures had been established (written, reviewed, approved and issued) to assure that the following activities are controlled and accomplished:
(1) Qualifications, responsibilities and duties of QA personnel responsible for PSI activitie (2) Indoctrination / training program for QA personnel responsible for PSI activitie (3) Audit procedure and/or checklists develope (4) Scope and purpose of audits to be performed are defined, including audits of the status and adequacy of the PSI progra (5) Frequency (or schedule) of audits, audit criteria, basis for re-audit, management review and assessment, corrective action and followup of corrective actio (6) Qualifications and responsibilities of auditors, including those of contractor (7) Quality requirements developed, including appropriate examination reports, acceptance criteria, and required documentation are specified in PSI progra (8) Deviations from previously established PSI programs and procedures are controlled and reviewed by cognizant personne (9) Quality documentation, including material certifications, examination reports, evaluations, and auditing results are generated and maintained to indicate whether PSI quality require-ments have been me (10) Identification of components, and systems covered by the PSI progra (11) Work and inspection procedures pertaining to the PSI are establishe (12) Inspection and work procedures are completed, reviewed, approved and controlled; and that those performing QA and inspection (QC)
activities have available the most recent and approved procedures and instructions pertinent to activities they are to monitor or inspec .
.
(13) Procedures are provided to assure suitably controlled PSI work and inspection condition (14) Procedures are provided for the control of special methods, techniques and examination equipmen (15) Special methods, techniques and examination equipment are used by
. qualified personnel using qualified procedures in accordance with applicable requirement .
(16) Procedures are established for identification and correction of conditions adverse to -quality as detected during examination, including provisions to preclude repetition of such adverse activities.
'l (17) Documents relating to PSI activities are adequately controlle (18) PSI related documents are reviewed by cognizant personnel for adequac *
(19) Provisions to . assure appropriate identification / listing and control of aggregate collection of-quality assurance instructions and procedures, including future revision (20) Provisions to assure periodic review of the adequacy of document control procedure (21) Procedures to assure that acceptance criteria are specified, examination requirements-(including prerequisites) have been met, evaluation of results documented and deficiencies detected and reported to the appropriate level of management.
,
(22) Procedures to assure adequate control, calibration, and adjustment of measuring and examination equipmen (23) Procedures to assure that evidence of indications and NDE findings are documented by qualified personne (24) Procedures to assure that specified NDE documentation for PSI examinaticns have been received and have been reviewed by the cognizant personne (25) Provisions to assure that PSI activity records are legible, adequate, retrievable and refer to markings, identifications or other means of-identifying materials and components important to safet (26) Review of PSI activity records by qualified personnel, including records of appropriate subsequent corrective action if neede _
,
.
.
,
In order to verify the program areas listed above, the following licensee and B&W procedural documents were reviewed by the inspector:
- Babcock and Wilcox Quality Assurance Manual, Revision 2
- Duke Power Company Quality Assurance Program
- B&W Procedure NPG-1719-21, Quality Assurance Audits of NPD Activities, Revision l'
- B&W Procedure 01-1280, Qualification of Quality Assurance Audit Personnel, Revision 1
- B&W Procedure ISI-1, Administrative Procedure for Control of Inservice Inspection Procedures, Revision 4
- B&W Procedure ISI-2, Administrative Procedure for Records Manage-ment, Revision 4
- B&W Procedure ISI-20, Personnel Qualification - Magnetic Particle Examination, Revision 4
- B&W Procedure ISI-21, Personnel Qualification - Ultrasonic Examination, Revision 4
- B&W Procedure ISI-22, Personnel Qualification - Liquid Penetrant Examination, Revision 3
-
B&W Procedure ISI-23, Personnel Qualification - Radiographic Examination, Revision 3
- B&W Procedure ISI-24, Personnel Qualification - Eddy Current Examination, Revision 4
-
B&W Procedure ISI-25, Personnel Qualification - Visual Examina-tion, Revision 5
-
B&W Procedure ISI-50 Technical Procedure Describing Surface Requirements of Welds, Adjacent Base Metal, and Components for Nondestructive Examination, Revision 8
- B&W Procedure ISI-51, Technical Procedure for Macro-Etching, Revision 4
- B&W Procedure 151-55, Technical Procedure for Sulfur Content Analysis, Revision 0
-
B&W Procedure ISI-56, Technical Procedure for Halogen Content Analysis, Revision 0
. _ _ _ . -- .
c
)
.
.
'
- B&W Procedure ISI-60, Administrative Procedure for the Use of Consumables, Revision 5
- B&W Procedure ISI-61, Administrative Procedure for Control of Manuals and Reports, Revision 16
- B&W Procedure ISI-62, Administrative Procedure for Control of Documents, Revision 3
- B&W Procedure ISI-63, Administrative Procedure for Approval of Manuals and Reports for Baseline and Inservice Inspection-Programs, Revision 5
- B&W Procedure ISI-64, Administrative Procedure for Handling Nonreportable Nondestructive Examination Data, Revision 15
- B&W Procedure ISI-65, Administrative Procedure for Use of the Data Base System, Revision 12
- B&W Procedure ISI-67, Administrative Procedure for Preparation of Non-NDE Data for the Data Base System, Revision _4
- B&W Procedure ISI-69, Administrative Procedure. for Reporting of Nondestructive Examination Indications and Data to the Customer, Revision 9
-
B&W Procedure ISI-76, Administrative Procedure for the Design, Fabrication, and Certifications of Calibration Standards, Revision 9
- B&W Procedure ISI-77, Administrative Procedure for Procurement, Revision 3
- B&W Procedure ISI-78, Administrative Procedure for Tagging and Correction of Nonconforming Items, Revision 6
- Bail Procedure 151-80, Administrative Procedure for Preventive Maintenance of Nondestructive Examination Equipment, Revision 13
- B&W Procedure ISI-83, Measurement of Ultrasonic Instrument Performance Characteristics, Revision 1
- B&W Procedure ISI-119, Ultrasonic Examination of Stainless Steel ant Nickle Base Alloy Weld Seams
-
B&W Procedure 151-120, Ultrasonic Examination of Piping and Vessel Welds Joining Similar and' Dissimilar Materials
-
B&W Procedure 1S1-1310. Ultrasonic Examinations of Vessel Welds and Nozzle Inside Radius Sections
-.
r-
.
e
.
7 B&W Procedure ISI-240, Penetrant Examination of Weld and Base .
Materials Including Studs and Nuts -
- B&W Procedure ISI-270,' Wet or Dry Methods of Magnet Particle i Examination of Welds, Studs, Nuts, Bolts, and Pump Motor Flywheels
-
B&W Procedure 1S1-350 Visual Examination" of Welds and Surface Conditions
- B&W - Procedure -ISI-353, Visual Examination of Pipe Hangers, Supports, and Restraints
- Duke Power Company (DPC) Procedure NDE-A, Nondestructive Examination Program Procedure, Revision 5
-
DPC Procedure NDE-B, Training Qualification and Certification of NDE Personnel, Revision 9
-
DPC Procedure NDE-11, General Radiography Procedure for Preservice and Inservice Inspection, Revision 4
-
DPC Procedure NDE-12, General Radiography Procedure for Preservice and Inservice Inspection, Revision 4
-
DPCProcedureNDE-24,MagneticParticleInspectionTechnique(Yoke
'
Method) for Preservice and Inservcie Inspection,. Revision 6
-
DPC Procedure NDE-25, Magnetic Particle Inspection Technique l(Yoke method) for Preservice and Inservice Inspection (1980), Revision 6
-
- DPC Procedure NDE-26, Wet Non-Fluorescent and Fluorescent Magnetic Particle Examination . Techniques - for Examination of Pressure Retaining Bolting, Revision 6 J
-
DPC Procedure NDE-33, Liquid Penetrant Examination . Technique (Color Contrast,- Solvent Removable Method) for Preservice and Inservice Inspection, Revision 5
-
DPC Procedure NDE-44, Ultrasonic Examination of Bolts and Studs for Preservice and Inservice Inspection, Revision 5 DPC Procedure NDE-46, Ultrasonic Examination of Reactor Vessel
-
-
Closure. Nuts for Preservice and Inservice Inspection, Revision 4 As a result of the above document reviews the following area of concern -
was identified:
Babcock and Wilcox's Quality Assurance Manual,Section XV, requires
-
that, audits of the Inspection Service activities, typically performed at the job site, provide verification of compliance with the QA progra Discussions with cognizant B&W personnel both onsite and off
. ,
" '- Nc'- - -
9 M- { 7 *T 1 wt w 1== w '+we F=1==y -=w-w w wyr-9- 9m rg-g*'- w-'femve . **v*d14 F h- y-- t-*p=5-*wm--
. - . - - . .- .- . . - _ - . - - -- . . - -
F I .
-
!
- 8 i
site indicated that B&W has- not audited the inspection service
> activities as required for Catawba Unit In addition, there was no documentation available at the site to indicate that Unit I received an i audit of the inspection service activities by B& B&W's QA Manual
,
further states that, the audits conducted under the QA audit program
-
include an objective evaluation of- quality-related _ practices, i
! procedures and instructions; the effectiveness of implementation, work i
! areas, activities, processes, and the review of documents and records.
- B&W sent the inspector an audit (Audit No.157) that had been performed
- in June of 1985 on the Nuclear Power Division's, Special Products and i Integrated Field Services in Lynchburg, Virginia. However, the scope of this audit was restricted to documents and records, not inspection
- activities relating to the effectiveness of examiners and examination t The inspector tried to contact cognizant licensee personnel to deter-mine if the -licensee had a contract exception with B&W that would
,
relieve B&W from their QA manual requirements- by designating the
! licensee responsible for auditing B&W's site activities. Cognizant
- Duke personnel in Charlotte, North Carolina, could not be reached for .
.
confirmation of the above. This item will be reported as an unresolved j j item until the inspector can verify any contract exception to B&W's QA >
i program and will be tracked as Unresolved Item 50-414/85-34-03,
.
Apparent Failure of Babcock and Wilcox to Perform Audits of Their Inspection Services Division, Work Activities on Unit 2.
! Scope of Preservice Plan
'
i The inspector reviewed the licensee's PSI program for Unit 2 to l ascertain whether the program included the following: ,
I (1) Description of areas to be' examined in accordance to ASME BPVC '
l Section XI, Articles IWB-2000 and IWC-2000 ,
- (2) Examination category for each area
- (3) Method of inspection for each area
L (4) Extent of examination for each area i (5) Justification for exceptions to codes.and standards.
l .Qualification of Personnel -
1 The inspectcr reviewed the program to ascertain whether personnel ~
- qualification requirements were consistent with Regulatory Guide-1.58, i Qualification of Nuclear . Power Plant Inspection, Examination and Testing Personnel, American National Standard Institute (ANSI) N45.2.6
,
i and the - American Society - for Nondestructive _. Testing, recommended practice no. SNT-TC-1A.
i'
l
. . . ._ - .. - . .. -- - . - - - - -
.
.
9 Nondestructive Examination (NDE) Records The inspector reviewed the PSI program and reference documents to ascertain whether adequate provisions relating to the control of NDE records included the following:
(1) Administrative controls have been established for control of the generation, approval, and custody of the following records:
- Examination results and data sheets including film and tape records for automated examination Listing of NDE equipment and instrumentation which are used during examinations, including make, model and serial numbe Calibration data sheet Listing of calibration blocks by identification number and material identificatio Personnel qualification records and certificate Drawings, sketches, and work order Listing c f welds for Class I and II component (2) Responsibilit es assigned for maintenance of NDE records identified in (1) above which defines storage, designates a custodian, and describes the filing syste Within the areas examined, no violation or deviation was identifie . Preservice Inspection - Review of Procedure (73052) Unit 2 The inspector reviewed the licensee's examination procedures for procedure approval, qualification of NDE personnel, procedure scope and technical content to determine whether these procedure pertaining to PSI are consistent with regulatory requirements and licensee commitments. The applicable code for this review is delineated in paragraph 6 abov Ultrasonic Examination The inspector reviewed the following ultrasonic examination procedures for technical content:
- B&W Procedure ISI-119, Ultrasonic Examination of Stainless Steel and Nickle Base Alloy Weld Seams
-
B&W Procedure ISI-120, Ultrasonic Examination of Piping and Vessel Welds Joining Similar and Dissimilar Materials
.
.
.
- B&W Procedure ISI-130, Ultrasonic Examination of Vessel Welds and Nozzle Inside Radius Sections
- Duke Power Procedure NDE-44, Ultrasonic Examination of Bolts and Studs for Preservice and Inservice Inspection, Revision 5
- Duke Power Procedure NDE-46, Ultrasonic Examination of Reactor Vessel Closure Nuts for Preservice and Inservice Inspection, Revision 4 The above procedures were compared to ASME Code requirements in the following areas:
(1) The type of apparatus to be used including frequency range as well as linearity and signal attenuation accuracy requirements is specifie (2) The extent of coverage (beam angles, scanning surface, scanning rate and directions) as well as the scanning techniques are specified and are consistent with the ASME Code.
'
(3) Calibration requirements, methods and frequency including type, size, geometry and material of calibration blocks as well as location and size of calibration reflectors within the block are clearly specified and consistent with the applicable ASME Cod (4) The sizes and frequencies of search units are specified and are consistent with the ASME Cod (5) Beam angle or angles are specified and are consistent with the ASME Cod (6) Methods of compensation for the distance traversed by the ultra-sonic beam as it passes through the material including distance -
amplitude correction curves, electronic distance - amplitude correction and transfer mechanisms, if used, are specified and are consistent with the ASME Cod (7) The reference level for monitoring discontinuities is defined and the scanning gain setting specified and that these values are in accordance with the ASME Cod (8) Methods of demonstrating penetration are establishe (9) Levels or limits for evaluation and recording of indications are specified and are in accordance with ASME Code,Section X (10) Method of recording significant indications are established and the reporting requirements are in accordance with licensee requirement _ ._. . . . ,
_ .. _. _
-
l
\
(11) Acceptance limits are specified or referenced and are in accordance with the ASME Code,Section X b. Radiographic Examination The inspector reviewed the following radiographic examination procedures for technical conten Duke Power Procedure NDE-11, General Radiography Procedure for Preservice and Inservice Inspection, Revision 4 (In accordance with 1974, ASME Code)
Duke Power Procedure NDE-12, General Radiography Procedure for
'
Preservice and Inservice Inspection, Revision 4 (In accordance with 1980, ASME Code)
The above procedures were compared to ASME Code requirements in the following areas:
(1) Type of material to be radiographed (2) Material thickness range (3) Type of radiation source, effective focal spot or effective source siz (4) Film brand, type and number of films in cassette.
.
(5) Minimum source to film distanc (6) Blocking or masking technique, if use (7) Type and thickness of intensifying screens and filters, and use therefor (8) Exposure condition (9) Material and weld surface condition requirements (irregularities,
.
weld ripples, surface finish, etc.)
(10) Radiographic film processing requirement (11) Quality of radiographs - limits on mechanical, chemical or other blemishes, such as fogging, process marks, scratches, finger marks, loss of detail or false indications.
- (12) Film density limits or sufficient contrast for single and composite viewin (13) Use of densitometers for assuring compliance with film density requirements.
l
-. __ , , _ ,
. - _ _ _ .-- - - .
.
.
(14) Method of radiograph identificatio (15) Use of location marker (16) Methodology for showing film location with reference to the part being radiographe (17) Selection and use of penetrameters including:
Penetrameter design Selection of essential hole Penetrameter thickness including special requirements for single and double wall viewing
Penetrameter placement including special requirements for single and double wall viewing
Number of penetrameters
Shims under penetrameters (18) Radiographic technique requirements for double wall viewin The inspector noted during the review of the above radiographic procedures, that the maximum source size was not define The reader could assume from charts depicting various source sizes and their minimum source to film distance, that these source sizes would cover the range used. However, the procedures also described a method for determining source sizes when unknown. The licensee was notified of the unclarity of the procedures and agreed to identify specifically the maximum source size that would be used with these procedure This item will be identified as Unresolved Item 50-414/85-34-02, Clarifica-tion of Procedure NDE-11 and NDE-12 Neede c. Liquid Penetrant Examination The inspector reviewed the following liquid penetrant examination procedures for technical content:
B&W Procedure ISI-240, Penetrant Examination of Weld and Base Materials Including Studs and Nuts Duke Power Procedure NDE-33, Liquid Penetrant Examination Technique (Color Contract, Solvent Removable Method) for Preservice and Inservice Inspection, Revision 5 The above procedures were compared to the ASME code requirements in the following areas:
(1) The specified test method is consistent with AMSE Code require- '
ment ,
,
.
.
.
(2) Brand names and specific types (number of letter designation if available) of penetrant, penetrant, remover, emulsifier and developer are specifie (3) Penetrant materials used for nickel base alloys are required to be analyzed for sulfur using method prescribed in the ASME Code and allowed residual total sulfur do not exceed the established limit (4) Penetrant materials used for the examinations of austenitic stainless steel are required to be analyzed for total halogens using method prescribed in the ASME Code and the total residual halogen content do not exceed the specified limit (5) Fluorescent penetrant examination method (if used) is not permitted to follow color contrast examination and that penetrant materials are used only in combinations recommended by the penetrant manufacture (6) Methods for acceptable preexamination surface preparation are specified and that these methods are consistent with the applicable ASME Cod (7) The procedure establishes a minimum drying time following surface cleanin (8) The method of penetrant application and the penetration time are specified and the penetration time is consistent with the penetrant manufacturer's recomendatio (9) The examination surface temperature is specified and the specified range is between 60 and 125 F. (If temperatures outside this range are permitted, has the examination procedure been specially qualified.)
(10) Procedures specify acceptable methods of removing water washable penetrant and that the water pressure and temperature are not permitted to exceed 50 psi and 110 F, respectivel (11) The method of applying emulsifier (when applicable) is specified and that emulsification time is not permitted to exceed 5 min, without a special procedt.re qualificatio (12) Methods for removal of solent removal penetrant (when applicable)
are specified and that these methods do not permit flushing the examination surface with solven (13) Method of surface drying prior to developing is specifie .
.
(14) The type of developer to be used, method of developer application and the time interval between penetrant removal and developer application are specifie (15) Examination technique is specified and the permitted time interval during which the " final interpretation" is made falls within 7-30 min. after developer applicatio (16) Examination conditions for fluorescent penetrants (when applicable) are specified and are in accordance with the applicable ASME Code requirement (17) Technique for evaluation of indications is specified, acceptance standards are referenced, and are consistent with applicable ASME Cod (18) Requirements exist (and are followed) for procedure requalifica-tion when changes are encountered in any of the following parameters:
- Surface treatments which may alter the condition of surface openings (blast cleaning, acid etching).
-
Change in precleaning materials or method Changes in the type of penetrant materials (including developer, etc.) or in processing technique d. Magnetic Particle Examination The inspector reviewed the following magnetic particle examination procedure for technical content:
B&W Procedure ISI-270, Wet or Dry Methods of Magnet Particle Examina-tion of Welds, Studs, Nuts, Bolts, and Pump Motor Flywheels Duke Power Procedure NDE-24, Magnetic Particle Inspection Technique ,
(Yoke Method) for Preservice and Inservice Inspection, Revision 6 Duke Power Procedure NDE-25, Magnetic Particle Inspection Technique (Yoke Method) for Preservice and Inservice Inspection (1980),
Revision 6 Duke Power Procedure NDE-26, Wet Non-Fluorescent and Fluorescent Magnetic Particle Examination Techniques for Examination of Pressure Retaining Bolting, Revision 6 The above procedures were compared with the ASME code in the following areas:
-
. . . _ . ,
_ _ . . .
_ _ _ _ _ _ .
A
.
. .
(1) Examinations are done by the continuous method (current on while particles are being applied) and adequate material surface preparation are specifie (2) If dry particles are used, the particle color provides good contrast with, background and component surface temperature is less than 600 F. '
<
(3) If wet particles are used they are suspended in suitable liquid medium and component surface temperature is below 135 (4) Viewing conditions for fluorescent particles consistent with paragraph T-725.3 of ASME Section V (Article 7).
i (5) Examination is conducted with sufficient overlap to achieve 100%
coverage and two separate examinations are made with field directions perpendicular to each othe (6) When prod method is used, prod spacing does not exceed 8-in. and provisions are made to reduce arcin (7) Magnetizing current for the prod method urges between 100-125 amps per inch of prod spacing for section thickness more than 3/4 i and 90-100 amps /in. for sections less than 3/4 in thic (8) If coil or direct contact methods are used, current and technique are consistent with paragraph T-732 and 733 of ASME Section (9) If yoke method is used, pole spacing is within 3-6 inches and minimum lifting power is 10 lb. for alternating current and 40 l for direct curren (10) Acceptance criteria are specified or referenced and are consistent with the applicable ASME Code Sectio Within the areas examined above, no violation or deviation was identifie . Preservice Inspection - Data Review and Evaluation The inspector reviewed data described- below to ascertain whether the NDE data covers the scope of examinations required in the applicable ASME Code, the SAR and the licensee's PSI Program. Files were reviewed for complete-ness and acceptability, and the licensee's disposition of adverse findings and subsequent re-exdaination, were reviewed for consistency with regulatory requirement The applicable code for this review is delineated in para-graph 6 of this repor n
.
.
a. The inspector selected the following component welds for review:
ITEM N WELD ID N METHOD COMP 0NENT B2.01.001 2PZR-W8A UT Pressurizer Lower Head to Shell Circumferential Weld B3.01.002 2SGB-01-02 UT Steam Generator 2B Channel Head to Tube Sheet i
B4.01.002 2NC9-01 UT Reactor Pressure Vessel Outlet Nozzle Safe-end to Pipe NDE records for the above welds were reviewed to determine whether the selected records contain or provide reference to the following documents:
(1) Examination results and data sheets (2) Examination equipment data (3) Calibration data sheets (4) Examination evaluation data (5) Records on extent of examination (6) Records on deviation from program and procedures including justification for deviation (7 Records on disposition of findings (8 Re-examination data after repair work (9 Identification of NDE material such as penetrant, penetrant cleaner, couplant, films, tapes, et b. The inspector selected the following reactor pressure vessel welds for review:
Item N Weld ID N Method B1.02.001 2RPV-101-151 UT Bl.02.004 2PRV-102-101 UT Bl.01.001 2RPV-101-171 UT NDE records for the above welds were reviewed to ascertain whether the following requirements were me (1) The method, extent and technique of examination comply with licensee's PSI program and applicable NDE procedur (2) The examination data are within the acceptance criteria as oatlined in applicable NDE procedure and applicable code require-ment =
(3) The recording, evaluation and disposition of findings are in
'
compliance with the applicable NDE procedure and applicable code requirement .
.
<
(4) The method used for NDE was sufficient to determine the full extent of indication or acceptance, c. The inspector selected the following pressure retaining pipe welds for review:
Item N Weld ID N Method Pipe Diameter B4.05.399 2NC119-03 UT 6 inch B4.05.400 2NC119-04 UT 6 inch B4.05.401 2NC119-5 UT 6 inch B4.05.565 2ND67-11 UT 12 inch B4.05.566 2ND67-10 UT 12 inch B4.05.567 2ND67.09 UT 12 inch B4.05.677 2NI92-01 UT 8 inch
, B4.05.678 2NI94-01 UT 8 inch
'
B4.05.679 2NI94-12 UT 8 inch C2.01.706 2SMI3-01 RT (Film Reviewed) 32 inch C2.01.703 2SM11-02 RT (Film Reviewed) 32 inch NDE records for the above welds were reviewed to ascertain whether the following requirements were met:
! The examination unit calibration data sheets show no l major deviations between initial and final calibration *
! Collected examination data and any recordable indications are properly recorded to permit accurate evaluation and documentatio Evaluation of examination data performed by a Level II or Level III examine *
Evaluation of examination data complies with the procedure Evaluation of indications (if applicable) comply with the criteria of the NDE procedure and ASME Section X During the technical review of NDE records in subparagraphs a and c above, the inspector noted the following:
The ultrasonic data sheet for figure no. B2.1.001, weld no. 2PZR-W8A had incorrect entries for -indication no. 200, throughwall dimension from surface one, minimum and maximu This error, however, did not affect the acceptance or rejection of the recorded indicatio The review also revealed that numerous NDE data reports of inside radii on welded elbows had deviation reports attached denoting limited scans for these areas of the weld. The reports however do not indicate whether
'
coverage of the weld and base metal had been fully achieved from the pipe side of the weld using the 60 degree angle probe. B&W's ultra-
.-_ _ . ..
. . - _ _ _ . _-_ _____ _ .- .-- -
.*
'
sonic procedure ISI-120 would have allowed the examiner to use a smaller search init in curvatures such as elbow inter-radi The inspector discussed the above concerns with the licensee cognizant !'
personnel in light of the fact that B&W has not performed an audit of site activities and that the delay of a technical review of data for
! accuracy and completeness could impact scheduled event The licensee's response to this concern will be tracked by Inspector
.
Followup Item 50-414/85-34-04, Technical Review of Preservice Record '
Within the areas examined, no violations or deviations were identifie , Independent Re-Examination Of Welds Unit 2(73053)
i The inspector re-examined the following welds using Region II ultrasonic equipment to determine if B&W's recorded data for these welds had been properly documented and evaluate Weld ID No Scan Performed
-
2NI94-01 Axials 2NI94-12 Axials 2NI32-2 Axials 2NI32-1 Axials
'
i
'
The inspector's re-examination and evaluations of indications compared favorable with data recorded by B& i In addition to the above, the inspector held discussion with the~ licensee
,
concerning ultrasonic equipment -that the licensee intends to use on '
Catawba's centrifugal cast stainless steel when inservice inspection
) requirements require the licensee to modify their calibration standards to
- include notch type reflector Typical transducers presently used with side drill holes will not detect notch type reflector However, the equipment the licensee intends to use during ISI should provide satisfactory results on notch reflectors. The inspector, however, requested that the licensca demonstrate their complete ultrasonic system including instrument, transducers and recorders (if applicable) on Region II cracked centrifugal cast stainless steel specimens prior to the first refueling outag This item will be tracked as Inspector Followup Item 50-414/85-34-01, Demonstrate
- Ability of Ultrasonic Equipment to Discern Crack in Centrifugally Cast
'
Stainless Steel.
'
Within the areas examined above, no violations or deviations were identified.
,
<