AECM-86-0239, Forwards Payment of Fees for Listed Applications.Util Overcharged for Review of Inservice Insp & Testing Program for Pumps & Valves.Encl Payment Adjusted Accordingly

From kanterella
Jump to navigation Jump to search

Forwards Payment of Fees for Listed Applications.Util Overcharged for Review of Inservice Insp & Testing Program for Pumps & Valves.Encl Payment Adjusted Accordingly
ML20211A755
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/26/1986
From: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20211A752 List:
References
AECM-86-0239, AECM-86-239, TAC-51477, NUDOCS 8610170002
Download: ML20211A755 (4)


Text

,. . . .

e MISSISSIPPI POWER & LIGHT COMPANY

]

EdhMlalldd5 Helping Build Mississippi P. O. B O X 164 0, J AC K S O N MIS SIS SIP r8! 39215-1640 Septmber 26, 1986 O. D. KINGSLEY, J R.

YlCE PRESIDENT. NUCLE AR OPERATIONS U. S. Nuclear Regulatory Commission Office of Resource Management Division of Accounting and Finance Washington, D. C. 20555

Dear Sir:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 File: 0260/L-860.0 Payment of Fees AECM-86/0239

References:

1) MAEC-86/0229, dated July 16, 1986
2) MAEC-85/0033, dated January 31, 1985
3) AECM-85/0074, dated March 27, 1985 Attached is a check for $32,600.00 for payment of fees for certain applications for Grand Gulf Nuclear Station Unit 1. This check represents payment in part by Mississippi Power & Light Company (MP&L) of a bill received from the Nuclear Regulatory Commission (NRC) in a letter dated July 16, 1986, (Reference 1) as authorized in 10 CFR 170.

MP&L has reviewed the itemized assessments in Reference 1 against prior invoices. In MP&L's opinion, there has been an overcharge of $4,000 with regard to the review of TAC #51477, Inservice Inspection and Testing Program for Pumps and Valves (Attachment 2). The fee applicable for this review is listed as $12,300 corresponding to the fee for a Class IV amendment at the time of the submittal.

In a prior invoice (Reference 2), MP&L was billed $4,000 for review of the same submittal (Attachment 3, Item 12). This corresponded to the charge for a Class III amendment at the time of the submittal.

MP&L recognizes that the NRC could reclassify its review from Class III, a single safety issue, to Class IV, several safety issues, but it is MP&L's position that credit should have been given for the $4,000 previously paid via Reference 3 for the review of TAC #51477. Thus, billing for TAC #51477 should have been $8,300.00 rather than $12,300.00.

8610170002 861010 i PDR ADOCK 05000416 -)

P PDR -

J13AECM86072901 - 1 Member Middle South Utilities System

y l -

u 4 (.

E 0 /n {[

% ; /pJ dt ^ih

  • g N

29 p I 15

, u.s "M

s$l'{ PEG.

L a

e

)

i i

i F

  • e

, -,, . . ~ . - - - . . . . , - , - . - - -,--,-..,,c,-.--,L - - . < - + - ., - - - c- - - - , . , - -,.nen,wa_n,,, a . ..< , , , . . - ,,,---,n . - - , - ,, - - .

AECM-86/0239 Page 2 In accordance with the provisions of 10CFR15.31 and 170.51, MP&L is submitting payment of the requested fee adjusted as explained. MP&L requests NRC review and approval of this evaluation.

If you have any questions, please advise.

Your ruly,

,4 ,

ODK:vog Attachment l'- Check Attachment 2 - MAEC-86/0229 _

Attachment 3 - MAEC-85/0033 .

cc: Mr. T. H. Cloninger (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds . (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. C.- Butcher (w/a) ,

Mr. James M. Taylor, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900-Atlanta, Georgia 30323 ,

?

J13AECM86072901 - 2

- 1 Attachm:nt 2 to

  • ~

. . . AECM-86/0239 List of Applications and Fees Grand Gulf Nuclear Station, Unit No. I Docket No. 50-416 Fees ONRR Staff's Fee Application Date- Fees Paid Applicable Determination & Action 1/19/82 as supplemented, None $4,000 Single safety issue.

R: evaluation of Masonry Approved by letter & SE Wall Design (TAC #49996) dated 11/4/85 4/?/82 as supplemented None 4,000 Single safety issue..

10/14/83 & 1/28/85, Soil Letter & SE dated 6/13/85.

Structure Interaction (TAC 49995) 8/26/83, Inservice inspection .None 12,300 Several safety issues.

and Testing Program for Pumps- Pending review, and Valves (TAC #51477) 2/9/84, Hydrogen Control. None 12,300 Complex issue. Pending Measures (TAC #48736) review.

-3/9/84, High Groundwater None 4,000 Single safety issue.

Level (TAC #54498) Approved by letter and SE on 8/19/85 TOTAL FEES. APPLICABLE . . . $36,600 TOTAL FEES PAID . . . . . . ~

FEES DUE NRC. . . . . . . . $36,600

Attachment 3 to

, AECM-86/0239 Application ' -

Tees Paid feesAdplicabl.e* ONRR's Basis for Fee'8 Action

. None $1,200 Portion approved by Amendment 3.{9/83(AECM-83/0411) -

No. 9 on 9/15/83 was adminis-trative in nature.

9. 8/1/S3 (AECM-83/0422) None $1,200 Administrative in nature.

. Approved by Amendment Nos. 9 and 10 on 9/15/83 and 9/23/83, respectively.

10. 8/9/83 (AECM-83/0449) None $1,200 Administrative in nature.

Approved by Amendment No. 9 on 9/15/83.

11. 8/25/83 (AECM-83/0424) None $4,000 Involves a single safety issue on 10 CFR 50.55' Inspection Still pending review.

Ralief.

12.8/26/83(dECM-83/0493) None $4,000 , Involves a single safety issue Still pending review.

13. 8/29/83 (AECM-83/0492) None $1,200 Administrative in nature for Item 2. Change 1 is partial resubmittal of 1 in 8/9/83 application. Approved by Amendment No. 9 on 9/15/83.

14 70/9/83 (AECM-83/0565) None Item 6 is exempt - Aoproved

( . Item 6 - ECCS Response Time None by Order dated'4/18/84.

b. All other items $1,200 Balance of application was

. administrative in nature and was approved by Amendment No.

13 on 8/31/84.

15.10/11/83(AECM-83/0642) $1,200 None Exempt - Approved by 4/18/84-Order.

16.12/14/83(AECM-83/0792) $1,200 None Exempt - Approved by 4/18/84 Order.

17.12/28/83 (AECM-83/0802) None $4,000 Involves a single safety issue On License Condition on Remote Still pending review.

Shutdown Panel Design

18. 1/18/84 (AECM-84/0009) $1,200 **

Management Changes

19. 1/23/84 (AECM-84/0033), None $4,000 Involved a single safety issue as supplemented Approved by Amendment No. 13 on 8/2'/84.,

?,0. 2/27/84 (AECM-84/0147) $1,200 **

. APRM Setpoint
21. 3/20/84 (AECM-84/0173) $5,200 None ADS valve operability Exempt - Approved by 4/18/84 '

Order and SLCS initiation l b

-