05000361/LER-1982-103, Followup LER 82-103/03X-2:on 820825,sample Isolation Valve 2HV-0517 Hot Leg Breaker 2BJ-23 Tripped on Overload While Attempting to Close Valve.Caused by burned-out Motor on Operator.Motor Replaced.Procedures Revised

From kanterella
Jump to navigation Jump to search
Followup LER 82-103/03X-2:on 820825,sample Isolation Valve 2HV-0517 Hot Leg Breaker 2BJ-23 Tripped on Overload While Attempting to Close Valve.Caused by burned-out Motor on Operator.Motor Replaced.Procedures Revised
ML20072V048
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/30/1983
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20072U993 List:
References
LER-82-103-03X, LER-82-103-3X, NUDOCS 8304110493
Download: ML20072V048 (3)


LER-2082-103, Followup LER 82-103/03X-2:on 820825,sample Isolation Valve 2HV-0517 Hot Leg Breaker 2BJ-23 Tripped on Overload While Attempting to Close Valve.Caused by burned-out Motor on Operator.Motor Replaced.Procedures Revised
Event date:
Report date:
3612082103R00 - NRC Website

text

U.S NUCLE AR GEGULATORY CCMIBM@S NIC F 0%M 366 (7 77)

LICENSEE EVENT REPORT (PLE ASE PRINT CR TYPE ALL REQUl2ED INFCRMAT!oNi CONTROL BLOCK: l 1

l l l l l 6

lh IC l A IS 101512 l@l0 (0 l -l Ol O!

l l@

Nwata010l 0l -l 01 Ol@[ LICENSE4 l llJo1l 57 lil l@l o i 25 26 TYPE CAT be 14 15 L CENSE 7 8 9 LICENSEE CODE C ON'T 7

C 1 8

s[3% lt )@l015 l0 l0 l0 l3 l6 l1 @l 01812151812Ml 013131 01 8 60 68 DOCKET NUMBER die 89 EVENT DATE 74 75 RE POA T DATE to EVENT JESCRIPTioN AND PAoBABLE CONSEoVENCES h g 10121 iWith the plant in Mode 3 during semiannual ESF subgroup relay testing, lot leg RT31 i sample isolation valve 2HV-0517's breaker 2BJ-23 tripped on overload w The valve was declared inoperable. Since the penetration was ,

f0 JT) J to close the valve.

I IO l3) ; isolated by securing the redundant valve in the closed position, there was no in health and safety of plant personnel or the public.

lo is i l I

O 7 l l

IDis l l .

vatvE 7 89 CAUSE C0er SYSTEM CAUSE SUDCODE SUSCODE CODE SU9 CODE COMPONENT CODE CODE I SI gl@ Lpj@ (Z tj@ 1 VI Al LI VI Ol ,,

  • $E"
  • 'YORT O "@' *d" l

b "un e EVENT vEAR PO l238 22l2 l [.--J Nu'vgg 24 RE l ll 01 3l26 y 27 l 0l 3l 28 29 W

30 g31

{32 23

^ '

uA FA t,RER 5B D FOR B. L ON P NT MT HOURS KEN AC

@ @ @ @ lZl91919l@

@ @ ,l, 01 Of Ol l CAUSE DESCRIPTION AND CORRECTIVE ACTIONS urned out motor on the operator. The motor was g l Failure of the valve was due to a All station maintenance procedures dealing with setting of limit switches, li g i g g replaced.

l f g , ,,, g torque switches and position indicators, after equipment mainten l g3g3, g reviewed and appropriate-revisions are currently being made to r .

l i, g ,g characteristics. (See also LER 82-094 and attachment) 30 7 8 9 g%op op F AClLITY DisCOVE RY D'SCOVERY DESCR4PT)DN STATUS  % POWER OTHERSTATUS l

$ [B_,j@ l l l j@l NA l @ Relay Testing

" A!Tiv,Tv '2 a ~ *

  • CsTEm <OC AT,, ,, ,,E u @

mu=o==am -OUm o,

' 5 l a ACT,v,Tv @i i a m

=

I

'

  • LZJ
  • @ LIl@aE, a

) ,ERsONNEtE POs NUM8E R TYPE DESCRIPTIO86 39 i i

[DB 'l 010 l O l@LZJ@l" .o

' n sO 4EL%J',,Es l U .ER OEsCR,PT,0 @ j i >. 1010101@l32 u "

l 3 ae si NE "c[s^C"* , M "' @ l l

t 9 ss Q no MA 8304110493 830330 NRC USE ONLY en PusuoTv PDR ADOCK 05000361 -

issufo s eDR i r>Tri uu@OEscRiPTion i AoxA . . ,

iiiiii,ii,,,3 ,,

4p% 714/492-7700 g Navr or ear,ans H. 8. RAf _

ATTACHMENT TO LER 82-094 SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION UNIT No. 2, DOCKET No. 50-361 SUPPLEMENTAL INFORMATION FOR CORRECTIVE ACTIONS However, due to the difficulty of obtaining the necessary vendor data, all procedure revisions are not expected to be completed until December 31, 1983.

ATTACHMENT TO LER 82-103 SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION UNIT No. 2, DOCKET No. 50-361 SUPPLEMENTAL INFORMATION FOR CORRECTIVE ACTIONS However, due to the difficulty of obtaining the necessary vendor data, all procedure revisions are not expected to be completed until December 31, 1983, i