Forwards LER 82-046/03L-0.Detailed Event Analysis Submitted
ML20062M170
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/13/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20062M173 List:
References
NUDOCS 8208200018
Download: ML20062M170 (2)


LER-2082-046, Forwards LER 82-046/03L-0.Detailed Event Analysis Submitted
Event date:
Report date:
3612082046R00 - NRC Website

text

. .. .

UK'm Southern California Edison Companyi m w , ._ ,

S AN ONOFRE NUCLE AR GENER A TING S T A TSON

&E p.o.somsas S AN C L EMEN T E. C A LIFOR NI A 92672 k H. 8. R AY TELE *MONE svar.oN uaNa=Ea August 13, 1982 mo or "aa U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 feria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Regional Administrator

Dear Sir:

Subject Docket No. 50-361 30-day Report Licensee Event Report No.82-046 San Onofre Nuclear Generating Station, Unit 2 Pursuant to Technical Specification 6.9.1.13.b, this letter provides the required written report and completed Licensee Event Report (LER) form for an occurrence involving Limiting Condition for Operation (LCO) 3.3-2 on the Toxic Gas Isolation System (TGIS).

On July 14, 1982, while operating in Mode 4, a Control Room alarm was received indicating f ailure of the TGIS, Train "A". Investigation revealed the pilot flame associated with the butane monitor was extinguished.

Train "A" of TGIS was declared inoperable and Action Statement 14 of Table 3.3-3 was entered.

Investigation revealed that the hydrogen fue'l supply'for the TGIS monitor was depleted and apparently resulted in burner flameout.

Immediate action was taken to replenish the fuel supply to this monitor and operability was restored within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

To avoid recurrence of such an event, operators will monitor TGIS fuel supply on a frequency of at least once per shift and will request replenishment before fuel pressure is reduced below 200 psig.

ohh PDR ef

R. H. Engelken August 13, 1982 in addition, facility changes will be initiated to have at least one spare bottle of fuel connected and ready for use at all times to eliminate the delay in ordering, transporting, and connecting new fuel suppiles.

If there are any questions regarding the above, please contact me.

Sincerely,

/ H

Enclosure:

LER 82-046 cc: A. E. Chaf fee (USNRC Resident inspector, San Onof re Unit 2)

U. S. Nuclear Regulatory Commission Of fice of Inspection and Enforcement U. S. Nuclear-Regulatory Commission Office of Management Information and Program Control Institute of Nuclear Power Operations