ML20072U989

From kanterella
Jump to navigation Jump to search
Forwards Followup LERs 82-094/03X-2 & 82-103/03X-2
ML20072U989
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/30/1983
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20072U993 List:
References
NUDOCS 8304110481
Download: ML20072U989 (1)


Text

i E G I', ,ey Southern California Edison Company IE M ,,, h ! g $ [. 5 S AN ONOFRE NUCLE AR GENER ATING S T A TION u ^

P .O. B O X 128 S AN C LEMEN T E. C A LIF ORNI A 92672

  • j,(,

STAT N M AN GER p 1F14) 492 F 00 U.S. Nuclear Regulatory Co; mission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-361 30-Day Follow-Up Reports Licensee Event Report Nos.82-094 and 82-103 San Onofre Nuclear Generating Station, Unit 2

Reference:

Letter, H.B. Ray (SCE) to R.H. Engelken (NRC),

dated November 30, 1982 This letter provides the follow-up to the referenced reports which were made in accordance with Section 6.9.1.13.b of Appendix A to Facility Operating License NPF-10 for San Onofre, Unit 2. The reported events involve Limiting Condition for Operation (LCO) 3.6.3. Revised copies of LER's82-094 and 82-103 are enclosed.

Sincerely,

/ .

I

Enclosures:

LER 82-094,82-103 cc: A.E. Chaffee (USNRC Resident Inspector, Units 2 and 3) r R.J. Pate (USNRC Resident Inspector, Units 2 and 3)

I U.S. Nuclear Regulatory Commission l

Office of Inspection and Enforcement i

U.S. Nuclear Regulatory Commission Office of Management Information and Program Control (MIPC) i

! Institute of Nuclear Power Operations (INPO) l "

l 8304110481 830330 PDR ADDCK 05000361 0 PDR MM 6 3 -151

-