05000346/LER-1981-004, Forwards LER 81-004/03X-1

From kanterella
Jump to navigation Jump to search
Forwards LER 81-004/03X-1
ML20055C067
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1982
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20055C068 List:
References
K82-1132, NUDOCS 8208100200
Download: ML20055C067 (1)


LER-2081-004, Forwards LER 81-004/03X-1
Event date:
Report date:
3462081004R00 - NRC Website

text

-

1 TOLEDO

%mm EDISON July 28, 1982 Log No. K82-1132 FILE: RR 2 (NP-33-81-03)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Enclosed are three copies of Revision 1 to Licensee Event Report 81-004 includ-ing the respective supplemental information sheet. The revision to the report is indicated by a "1" in the left margin of each page.

Please replace your previous copies of this report with the attached revision.

Yours truly.

T Do Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station l

TDM/lmr l

Enclosure cc: Mr. Richard DeYoung, Director j Office of Inspection and Enforcement Encl: 30 copies Mr. Norman llaller, Director i

Office of Management and Program Analysis l Enc 1: 3 copies

! Mr. Luis Reyes l Resident Inspector

! Encl: 1 copy l

l 8208100200 820728 PDR ADOCK 05000346 S PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 [gf AUG' '4 G821 44;-f f

_ - .