B17767, Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr
ML20209C430
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/1999
From: Necci R
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137W534 List:
References
B17767, NUDOCS 9907090291
Download: ML20209C430 (3)


Text

Northeast Rope Ftrry Rd. (Route 156), Tcterford, CT 06385 Nuclear Energy Mastone Nuclear Power Station Northeast Nuclear Faergy Company P.O. Bos 128 Waterford, CT 06385-0128 (860) 447 1791 Fax (860) 444-4277  !

The Northeast Utilities System l

1 JLN 2 g 3999 pocket No. 50-423 B17767 Re: 10CFR50.71(e) 10CFR50.59  !

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 ,

Millstone Nuclear Power Station, Unit No. 3 J Revision 12 to the Final Safety Analysis Report l And Addendum 3 to Annuaj Report Northeast Nuclear Energy Company (NNECO) hereby submits, as Attachment 1, Revision 12 to the FSAR in the form of replacement pages as required. Revision 11 to the FSAR was submitted on June 30,1998.m Pursuant to 10CFR50.71(e)(2)(i), I certify that this revision accurately presents changes completed since our previous submittal that are necessary to reflect information and analyses submitted to the Commission or l

prepared pursuant to Commission requirements, as of December 31,1998.

Pursuant to 10CFR50.71(e) and 10CFR50.4(b)(6), this transmittal consists of one original and ten copies. As stipulated in 10CFR50.71(e)(2)(ii): "This submittal shall include an identification of changes made under the provisions of Section 50.59 but not previously submitted to the Commission." Pursuant to Section 50.59(b) with the exception noted, such information is routinely submitted to the NRC as part of our annual reports, and is not included in this submittal. The most recent annual report previously submitted was dated June 30, 1998,* for the period January 1,1997, through December 31, 1997. Please note that Attachment 2 includes information covering changes contained in this submittal but not included in the June 30,1998,*

letter, and is provided herein as Addendum 3 to that annual report.

m M. L. Bowling, Jr. letter to U.S. Nuclear Regulatory Commission,

  • Millstone Nuclear Power Station, Unit No. 3, Revision 11 to the Final Safety Analysis Report and Addendum 9 to the Annual Report," dated June 30,1998.
  • M. L Bowling, Jr/ letter to U.S. Nuclear Regulatory Commission, " Millstone Nuclear Power Station, Unit No. 3,10CFR50.59 Annual Report for 1997," dated June 30,1998.

9907090291 990629 PDR ADOCK 0500o423 K FDR \

m ,

U S. Nuclear Regulatory Commission B17767/Page 2 There are no new regulatory commitments contained within this letter.

We trust that this information satisfies the requirements of 10CFR50.71(e). If you have any questions, please contact Mr. D. W. Dodson at (860) 447-1791, ext. 2346.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/W R.P.Need' Vice President - Nuclear Oversight and Rcgulatory Affairs Attachments: (2) cc: H. J. Miller, Region i Administrator J. A. Nakoski, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3

.)

Docket No. 50-423 B17767

, Attachment 1 Millstone Nuclear Power Station, Unit No. 3 Final Safety Analysis Report insert Instructions and Replacement Pages Revision No.12 - June 29,1999 l

i

)

l l

June 1999 l

_ _