Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 2
ML20209J048
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/13/1999
From: Schwartz C, Schwarz C
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209J051 List:
References
B17824, NUDOCS 9907210119
Download: ML20209J048 (2)


Text

  • wi, nope rerry na. (ao.ie 136), w,terrora, er 06383
) Northeast ,

.. [ NuclearEnergy .,,g.g,,, p,,, g,,,

Northeast Nuclear Energy Company P.O. Box 128 Waterford, Cr 06383-0128 (860) 447-1791 rai (860) 444-4277 ne Northeast Utilities System JUL i 31999 Docket No. 50-336 B17824 Re: 10CFR50.71(a)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No DPR-65 Monthly Operatina Report in accordance with the reporting requirements of Technical Specification Section 6.9.1.7 for Millstone Unit No. 2, enclosed, in Attachment 1, is the monthly operating report for the month of June 1999. Also, included as Attachment 2 is a revised Operating Data Report for May 1999.

There are no regulatory commitments contained within this letter.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

,p u Mk CAchwTrz Director, Millstone Unit o. 2 210003 9907210119 990713 PDR ADOCK 05000336 R PDR cc: H. J. Miller, Region I Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2

(#i3422-5 REY.12-95

Docket No. 50-336 B17824 l

l Attachment 1 l

l Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Monthly Operating Report June 1999 l

[

July 1999