05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed | Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed | |
05000423/LER-1996-049, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl | Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl | |
05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements | Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements | |
05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event | Forwards LER 96-051-00 & Util Commitments in Response to Event | |
05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis | Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis | |
05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement | Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirements | |
05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date | Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date | |
05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted | Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted | |
05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted | Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted | |
05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 | Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 | |
05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements | Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements | |
05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed | Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed | |
05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode | Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode | |
05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident | Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident | |
05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted | Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted | |
05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed | Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed | |
05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments | Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments | |