05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments

From kanterella
Jump to navigation Jump to search
Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments
ML20217K354
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/08/1997
From: Noll W
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K360 List:
References
B16655, GL-89-13, NUDOCS 9708150205
Download: ML20217K354 (2)


LER-2096-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments
Event date:
Report date:
2452096066R00 - NRC Website

text

  • steer i crr, ii i (sieni, tr,t,3, s oir,ro,<i. <rr maas
  • Nordicasit N htilletone % lear Ibo et Flat 6un Nortlwet h icar inigy Onupany I'.o lloi128 Waterford,(Tl ma8$.Olg8 (N,0) 4471791 l'as (N,0) 444 4r?

'Ihr Nortlicant litilitica 5ptrm August 8,1997 Dosket No. 50 245 1116015 Re: 10CFR50.73(a)(2)(i) ,

10CFR50.73(a)(2)(ii)

, 10CFR50.73(a)(2)(v)

U S. Nuclear Regulatory Commission -

Document Control Desk  ;

Washington, DC 20555 This letter forwards Licensee Event Report (LER)96-066 00, documenting an event that occurred at Millstone Nuclear Power Station, Unit L. I on March 26,1996. This report is submitted pursuant to 10CFR50.73(a)(2)(i),10CFR50.73(a)(2)(ii), and 10CFR50.73(a)(2)(v). ,

The following are Northeast Nuclear Energy Company's .(NNECO's) commitments contained within this letter. All other statements contained within this letter are for information only.

1116655 1 NNECO commits that a comprehensive heat exchanger testing, monitoring, and inspection program based on Generic Letter 8913 will be developed prior to restart from the current refueling outage. This program will include the development and implementation of Low Pressure Coolant injection (LPCI) heat _ exchanger performance testing to demonstrate operability through verification of adequate heat removal capacity.

1116655 2 NNECO commits that the LPCI heat exchangers will be tested and repaired as needed to establish operability prior to restart from the current refueling outage. i 1116655-3 NNECO commits that the results of the LpCI heat exchanger performance tests will be provided in a supplement to this report prior to restart from the current refueling outage. The duration of time that the heat exchangers were inoperable prior to the shutdown will be determined based on the results of the heat exchanger testing program.

1en i P M E89je aas!qqs.n

=

1

?

U.S. Nuclear Regulatory Commission  :

lil6655\Page 2 of 2  !

Very truly yours, NORTilEAST NUCl. EAR ENERGY COMPANY j For: P. D. Ilinnenkamp Director, Unit Operations  ;

i e fly: W G. Noll Manager, Operations l r

Attachment:

1.ER 96 066 00 .

ec: Dr W. D. Travers, Director, Special Projects

11. J. Miller, Region i Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 T.- A. Easlick, Senior Resident inspector, Millstone Unit No. I  !

F i

t

.5 s

h y -._,,,r.._ - . , ,,,.._..,_.y. - . .~,.- . ,_ ..e.,,,._ .. ,,~.~,...,-,m,,,-.. ,.yy,.. , ..e, % p ., %r y ,