05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed

From kanterella
(Redirected from 05000245/LER-1997-001)
Jump to navigation Jump to search
Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed
ML20134J880
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/10/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134J881 List:
References
B16164, NUDOCS 9702120386
Download: ML20134J880 (2)


LER-2097-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed
Event date:
Report date:
2452097001R00 - NRC Website

text

. . ~ .- .- . . . - . .. -.. .-. -... .- - ~_.~. . - ..- _ _ . . . ~ _ . .

?

w a

, \ ___

No_..1a._t . Rope Ferry Rd. (Houte 156), Waterford, Cr 06385 Nuclear Energy' wusione Noacar power station  ;

Northeast Nudear Energy Cornpany P.o. Hos 128 l

Waterford, CT 06385-0128 'i i

i (860) 447-1791 1 Fax (860) 444-4277 2 1

The Fortheast Utilities Systern ,

i Docket No. 50-245 l B16164 1

Re: 10CFR50.73(a)(2)(i) . I February 10,1997  ;

U.S. Nuclear Regulatory Commission -i Document Control Desk

)

Washington,DC 20555 This letter forwards Licensee Event Report (LER) 97-001-00, documenting an event that I occurred at Millstone Nuclear Power Station, Unit No. I on January 10,1997. This LER is  !

submitted pursuant to 10CFR50.73(a)(2)(i). j The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.  !

B16164-1 NNECO commits to identify by April 15,1997, critical radwaste components and I implement a preventative maintenance program to assure operability of these i components. The system design basis will be revised to identify these critical components and specify their design requirements by August 22,1997.

B16164-2 NNECO commits to conduct a review of the present Liquid Radwaste Discharge system lineup to determine the appropriate configuration and modify the discharge i procedures and system configuration as required to ensure the system is operated 1 within the design basis of the plant by March 31,1997.

B16164-3 NNECO commits to review Technical Specifications for occurrences where actuated equipment has only implied functional requirements due to association with systems (such as actuating instrumentation) in other sections of Technical Specifications or the Updated Final Safety Analysis Report and specify .the functional requirements for these components by April 30,1998.

Very truly yours, \\[

f'L NORTHEAST NUCLEAR ENERGY COMPANY P. D.llinnenk>a5ip V  !

f[

8

] $ E5 $ 045 Pon Director, Unit Operations j u l (Mi3422 $ REV.12  !

l

.i

. . . . ~ - . - - . . - - . - . . -. - . _.-... - - - - - . - . . - . . . -

4 .

i

, U.S. Nuclear Regulatory Commission B16164\Page 2 of 2

}-

Attachment:

LER 97-001-00  !

cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator  ;