05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl

From kanterella
(Redirected from 05000245/LER-1998-001)
Jump to navigation Jump to search
Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl
ML20203A791
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/09/1998
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203A794 List:
References
B16941, NUDOCS 9802240114
Download: ML20203A791 (4)


LER-2098-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl
Event date:
Report date:
2452098001R00 - NRC Website

text

. _ _ _ _ ___ _ ____ _ _- -_ _ - - - - - - - - -

. s .

Nht I* "'T "d- ("" ' 66) *"'d "' 6""5 Nisclear Eriern- uitt ior, soci,ar Po.,, stata,n Northeast Nuclear Energy Cornpany

'

  • P.o.Iks128 Taterford, CT 06385-0128 (860) 447 1791 ias (860) 444 4277 W Northcut Utilitice Systern FEB 9 1998 Docket No. 50-245 B16941 Re: 10CFR50.73(a)(2)(ii)

U.S. Nuclear Regulatcry Commission Attentinn: Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 98-001-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No.1 on January 9,1998.

This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

Northeast Nuclear Energy Company's commitments associated with this letter are provided in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY P. D. Hinnenkamp ~"

Director, Unit Operations

.. v v v i ~9

[y6,N g cc: H. J. Miller, Region I Administrator T. A. Easlick, Senior Resident inspector, Millstone Unit No.1 S. Dembek, NRC Project Manager, Millstone Unit No.1 9002240114 980209 PDR A90CK 0500o245 omm s arv.12 +s

Docket No. 50-245 B16941 Attachment 1 Millstone Nuclear Power Station, Unit No.1 Regulatory Commitments January 1998

- U.S. Nucl::r R:gul tory Commissbn B16941\Att: chm:nt 1\Pcg31 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager . Regulatory Compliance et the Millstone Nuclear Power Station Unit No.1 of any questions regarding this document or any associated regulatory commitments.

Commitment Committed Date or Outage B16941-1:An evaluation will be performed to determine if Prior to Cycle 16 anelysis of this event without the backup pressure startup regulator inservice will render this a limiting event.

Depending on the outcome of that evaluation, appropriate plant administrative contrcls will be implemented to restrict plant operation when the backup pressure regulato, is out of service. This evaluation and revision to administrative controls will be completed prior to startup for Cycle 16.

I B16941-2:As part of other corrective actions already Prior to Cycle 16 underway, a full re-evaluatica of all Updated startup Final Safety Analysis Report limiting and non-limiting transients will be performed to ensure that the plant design basis is met and similar critical analysis assumptions are captured in appropriate plant administrative controls.

B16941-3:A review of existing QA/QC and Engineering Standards, as Prior to Cycle 16 determined by Engineering startup Management, will be performed to ensure adequate reviews and processes are in place for in-house and purchased activities. This orogram improvement will be completed prior to startup fc; Cycle 16.

Docket No. 50-245 B16941 l

Attcchment 2 Millstone Nuclear Power Statien, Unit No.1 LER 98-001-00 January 1998

_ _ _ _ _ _ _ _ _