Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted
ML20134N069
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/22/1996
From: Noll W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134N071 List:
References
B16022, NUDOCS 9611260154
Download: ML20134N069 (1)


LER-2096-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted
Event date:
Report date:
2452096055R00 - NRC Website

text

. . . .- . - _ . .- . _ . -. . -. . . .- - - - - _ . . _ _ - . _ , . - _ - - . - . , .

I j< Hogw Feny Rd. (Houte 156), Watnfant, N385 N5rtheast Nuclear Energy mione socie., po.e, si tion j

, Northeast Nuclear Energy Company ,

P.o. Box 128 .

Waterford, CT 06385-0128 1

(860) 447 1791 Fax (860) 444-4277 The Northeast Utilities System .

November 22,1996 ,

Docket No. 50-245 B16022 2

I Re: 10CFR50.73(a)(2)(ii)

, U.S. Nuclear Regulatory Commission .,

Document Control Desk

. Washington,DC 20555 l This letter forwards Licensee Event Report (LER) 96-055-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on October 23,1996. This LER is 1 i submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within j this letter. All other statements made within this letter are for information only.  ;

t

. B16022-1 NNECO commits to establish the design basis of the EDG air start system and ,

ensure that it is met. This will be completed prior to declaring the EDG operable.

B16022-2 NNECO commits to revise the UFSAR and surveillance procedures as necessary prior to Cycle 16.

! B16022-3 A review of other systems to identify and resolve design basis discrepancies is

, ongoing as part of the design basis verification program to address 10 CFR 50.54(f) 4 concems. The 10 CFR 50.54(f) review and recommendation implementation will l

be completed before startup for Cycle 16.

Very truly yours, a NORTHEAST NUCLEAR ENERGY COMPANY l

l For: P. D. Hinnenkamp

, Director, Unit Operations i

i .

I 9611260154 961122 By:

PDR -ADOCK 05000245 PDR 2 .

> 8 W. G. Noll 260011 Operations Manager i

Attachment:

LER 96-055-00 i i

'cc: H. J. Miller, Region I Administrator T. A. Easlick, Senior Resident Inspector, Millstone Unit No.1

'T@d )I l l

l J. W. Andersen, NRC Project Manager, Millstone Unit No. I j 083422 5 REY.12 95