Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed
ML20133G457
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/10/1997
From: Noll W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133G460 List:
References
REF-GTECI-A-46, REF-GTECI-SC B16043, NUDOCS 9701160051
Download: ML20133G457 (1)


LER-2096-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed
Event date:
Report date:
2452096049R00 - NRC Website

text

,  %

~t Northeast Mili m a , o m e. . a v r na , worsra, er ury

. gY Utilities System P.o. w 128 Wateriora. CT ON-0128 (203) 447-1791 January 10,1997 l

Docket No. 50-245  ;

B16043 j Re: 10CFR50.73(a)(2)(i) 10CFR50.73(a)(2)(v)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i i

This letter forwards supplemental Licensee Event Report (LER) 96-049-01, documenting an I

event that occurred at Millstone Nuclear Power Station, Unit No.1 on May 24,1996. This.

LER is submitted pursuant to 10CFR50.73(a)(2)(i) and 10CFR50.73(a)(2)(v).

This supplemental report provides an update to the cause of the event and the resolution of the  ;

relay issues as committed to in Commitment No. B15914-1. Thus this commitment is closed. l Also, the remaining commitment has been moved from the LER form to this letter.

The following is NNECO's commitment made within this letter. All other statements made within this letter are for information only.

l 4

l B15914-2 NNECO commits to qualify the replacement relays by current qualification methods j to assure proper function during a postulated earthquake. The inadequate relays will j be replaced prior to startup for operating cycle 16.  !

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY ,

1 For: P. D. Hinnenkamp  !

Directo it O rati [

/

16000g By: W. G. Noll

/lnh Manager, Operations I

Attachment:

LER 96-049-01 cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 9701160051 970110 PDR ADOCK 05000245 S PDR