Forwards RAI Re Bulletin 95-02 for LGS Units 1 & 2 & PBAPS Units 2 & 3
ML20135E243
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 03/04/1997
From: Rinaldi F
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
IEB-95-002, IEB-95-2, TAC-M93870, TAC-M93871, TAC-M93874, TAC-M93875, NUDOCS 9703060379
Download: ML20135E243 (5)


Text

__. - _ . _ . __ _ .. _

March 4, 1997 a ~

t i

Mr. George A. hunger, Jr.

Manager-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters l Correspondence Control Desk i P.O. Box 195 Wayne, Pennsylvania 19087-0195 >

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE PEC0 RESPONSE TO NRL BULLETIN 95-02 FOR LIMERICK GENERATING STATION, UNITS 1 AND 2, AND PEACH BOTTOM ATOMIC POWER SlATION, UNITS 2 AND 3 (TAC NOS. M93870, M93871, M93874, AND M93875)

Dear Mr. Hunger:

On November 16, 1995, PECO Energy submitted the response to ..KC Bulletin 95-02 for Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3. On May 9, 1996, the staff issued a request for additional information (RAI) with regard to your submittal. On June 10, 1996, you responded to the staff's RAI. The staff has reviewed your response and has determined that additional information, as stated in the enclosure, is-needed by the staff to complete our reviews.

We request that the licensee provide its response within 30 days, to support our review schedule. If you have any questions regarding the enclosed RAI, please contact me at (301) 415-1447.

Sincerely,_ ~

Original sign'ed by.

, p gg c b B ELL g g% ' Frank Rinaldis Project Manager Project-Directorate I-2 i

l Divisi_on of Reactor Projectsi- I/II Office of, Nuclear Reactor Regulation

,.= a

~ '

Docket Nos. 50-352/353/277/278 ,

Enclosure:

RAI -

cc w/ encl: See next page 3 DISTRIBUTION i TE0ocket; File FRinaldi ACRS ..

s [ l PUBLIC PDI-2 Reading JShea -

M0'Brien WPasciak, RGN-I RElliot, SCSB -

/ )

SVarga/JZwolinski CBerlinger MLynch [ l

/

JStolz OGC /)

0FFICE PDI[2h[k'f)( PDI-2/PM h #k-f2/PM P PDh2/PD NAME M0Idied U FRinaldi /I hh JStb DATE b/b97 $/3/97  %,I/97 3/3/97 0FFICIALRKORDCOPY DOCUMENT NAME: G:\SHEA\PB93874.RAI

( 9703060379 970304 PDR ADOCK 05000277 i P PDR

l

. gR ME t UNITED STATES j

'f . **f &

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4001

%, . . . . . p' March 4, 1997 Mr. George A. Hunger, Jr.

Manager-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control vesk P.O. Box 195 Wayne, Pennsylvania 19087-0195

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE PECO RESPONSE TO NRC ,

BULLETIN 95-02 FOR LIMERICK GENERATING STATION, UNITS 1 AND 2, AND PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M93B70, M93871, M93874, AND M93875)

Dear Mr. Hunger:

On November 16, 1995, PECO Energy submitted the response to NRC Bulletin 95-02 for Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3. On May 9, 1996, the staff issued a request for additional information (RAI) with regard to your submittal. On June 10, 1996, you responded to the staff's RAI. The staff has reviewed your response and has determined that additional information, as stated in the enclosure, is needed by the staff to complete our reviews.

We request that the licensee provide its response within 30 days, to support our review schedule. If you have any questions regarding the enclosed RAI, please contact me at (301) 415-1447.

Sincerely,

% cw/L JM F k Rinaldi, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-352/353/277/278

Enclosure:

RAI cc w/ enc 1: See next page

Nr. George A. Hunger, Jr. Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3

, Limerick Generating Station, Units 1 and 2 cc:

1 J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company

ATTN: ;Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1

, Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre

Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401

, Regional Administrator, Region I U.S. Nuclear Regulatory Commission Manager - Limerick Licensing, 62A-1 475 Allendale Road PECO Energy Company l King of Prussia, PA 19406 965 Chesterbrook Boulevard '

Wayne, PA 19087-5691 Mr. Roland Fletcher  :

Department of Environment Mr. Walter G. MacFarland, Vice President )

201 West Preston Street Limerick Generating Station Baltimore, MD 21201 P.O. Box A Sanatoga, PA 19464 A. F. Kirby, III External Operations - Nuclear Plant Manager Delmarva Power & Light Company Limerick Generating Station P.O. Box 231 P.O. Box A ^

Wilmington, DE 19899 Sanatoga, PA 19464 Chairman Board of Supervisors of Limerick Township 646 West Ridge Pike Linfield, PA 19468

1

- s

Mr. George A. Hunger, Jr. Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 Limerick Generating Station, Units 1 and 2 l

Director - Site Support Services Senior Resident Inspector  !

Limerick Generating Station U.S. Nuclear Regulatory Commission P.O. Box A Limerick Generating Station Sanatoga, PA 19464 P.O. Box 596 Pottstown, PA 19464 Manager - Experience Assessment Library Limerick Generating Station U.S. Nuclear Regulatory Commission i

P.O. Box A Region I Sanatoga, PA 19464 475 Allendale Road King of Prussia, PA 19406 Senior Manager - Operations Dr. Judith Johnsrud Limerick Generating Station National Energy Committee P.O. Box A Sierra Club Sanatoga, PA 19464 433 Orlando Avenue l State College, PA 16803 l

\

Director - Site Engineering Manager-Peach Bottom Licensing l

Limerick Generating Station PECO Energy Company P.O. Box A Nuclear Group Headquarters

Sanatoga, PA 19464 Correspondence Control Desk '

P.O. Box No. 195 Manager-Business & Co-owner Affairs Wayne, PA 19087-0195 Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 PECO Energy Company Plant Manager Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314 1

RE0 VEST FOR ADDITIONAL INFORMATION (RAI)

NRC BULLETIN 95-02 LIMERICK GENERATING STATION. UNITS 1 AND 2 PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 (1) In PECO's June 10, 1996 response to the NRC staff's May 9, 1996 RAI, PECO described a four part program for ensuring adequate suppression pool cleanliness which PECO stated was an effective program to demonstrate both short-term and long-term operability of the Emergency Core Cooling System (ECCS). However, your response to NRC Bulletin 96-03 appears to indicate that this program may not be maintained in the long-term as described in your June 10, 1996 response. Please describe what surveillances/ inspections you intend to conduct or implement in the future regarding suppression pool and strainer cleanliness to ensure long-term operability of the ECCS. Please include a description of the frequency and acceptance criteria to be used. In addition, please describe your specific plans for implementing a suppression pool cleaning program, including frequency and acceptance criteria. Provide your basis for concluding that these actions will be adequate to ensure that the ECCS will always be sufficiently free of debris to ensure its capability to perform its intended function.