Notice of Violation from Insp on 960812-16 & 26-30. Violations Noted:Properly Approved Configural Control Procedures & Drawings Not Followed in That as Built Sample Line Not Constructed IAW Production Change NoticeML20128H743 |
Person / Time |
---|
Site: |
Farley |
---|
Issue date: |
09/27/1996 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
---|
To: |
|
---|
Shared Package |
---|
ML17264B184 |
List: |
---|
References |
---|
50-348-96-10, 50-364-96-10, NUDOCS 9610100047 |
Download: ML20128H743 (4) |
|
|
---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20210H1591999-07-23023 July 1999 Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met ML20236J6971998-07-0101 July 1998 Notice of Violation from Insp on 980412-0530.Violation Noted:Several Conditions Adverse to Quality Associated W/Cr Ventilation Sys Were Not Promptly Corrected.Conditions Inappropriately Closed Out Before Adequate C/As Completed ML20217E5921998-03-23023 March 1998 Notice of Violation from Insp on 980111-0212.Violation Noted:While Performing Maint on 1A Centrifugal Charging Pump,Maint Personnel Violated Requirements of FNP-0-M-001, Rev 13 ML20198N9481997-12-29029 December 1997 Notice of Violation from Insp on 971019-1129.Violation Noted:As Early as June 1985,licensee Identified Degradation of Cork Seal Between Containment & Auxiliary Bldg Walls, Condition Adverse to Quality ML20199H1281997-11-17017 November 1997 Notice of Violation from Insp on 970907-1018.Violations Noted:Battery Capacity After Svc Test Was Inadequate & Check Valve V003 & V002D F & H Were Not Flow Tested in Manner That Proves That Disk Travels to Seat on Cessation ML20211Q9391997-10-0606 October 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970906 Licensee Installed One 1-inch Thick Wrap of Kaowool on Sides & Bottoms of Raceways BDE-9 & BDE-15, Carrying Train B Charging Pump Power Cable in Fire Area ML20211K8161997-09-26026 September 1997 Notice of Violation from Insp on 970818-22.Violation Noted: Noted:Nrc Identified That Licensee Failed to Correctly Translate Applicable Design Specfication Input Requirements for Kaowool Electrical Raceway Fire Barrier Sys at Plant ML20217R2021997-08-28028 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 970616,most of M&TE Used Onsite Did Not Have Written & Approved Calibration Procedures ML20148K6431997-06-0909 June 1997 Notice of Violation from Insp on 970330-0510.Violation Noted:On 970321,facility Licensee Physician Determined That Licensed Operator Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) as Measured by Std of ANSI/ANS-3.4-1983 ML20196G4241997-05-0606 May 1997 Notice of Violation from Insp Completed on 970314.Violation Noted:Prior to 970314,licensee Failed to Prescribe Documented Instructions or Procedures to Implement Listed Activities Affecting Quality of Operation of PRF Sys ML20140B7851997-03-17017 March 1997 Notice of Violation from Insp on 970105-0215.Violation Noted:Test Engineer Failed to Comply W/Procedural Requirements of FNP-1-STP-124.0 During Performance Testing of Plant Penetration Room Filtration Sys Train a ML20133F6891996-12-23023 December 1996 Notice of Violation from Insp on 961013-1123.Violation Noted:On 961010,security Guards Failed to Search Westinghouse Sludge Lance Trailer Prior to Allowing Trailer to Enter Plant Protected Area ML20149M5771996-12-0404 December 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Licensee Failed to Assure Electrical Cables Associated W/Sys Necessary to Achieve & Maintain Hot SD Conditions Encl in Fire Barrier ML20134J4201996-11-0808 November 1996 Notice of Violation from Insp on 960901-1012.Violation noted:non-licensed Sys Operators in Two Separate Events Failed to Properly Implement Applicable Sys Operating Procedures ML20128J9581996-09-27027 September 1996 Notice of Violation from Insp on 960721-0831.Violation Noted:Unit 1 Nis IR Channel Compensating Voltage for NI-35 Was Adjusted by Plant Technicians,Being Below Scale & SR Counts Were Less than 100 Cps ML20128H7431996-09-27027 September 1996 Notice of Violation from Insp on 960812-16 & 26-30. Violations Noted:Properly Approved Configural Control Procedures & Drawings Not Followed in That as Built Sample Line Not Constructed IAW Production Change Notice ML20058P7581993-12-0101 December 1993 Notice of Violation from Insp on 930923-1025.Violation Noted:Planner for Work Package Did Not List Removal of A/C Panel as Required Per Step 7.5.1 ML20057E4871993-10-0101 October 1993 Notice of Violation from Insp on 930816-0903.Violation Noted:As of 930903,measures Not Established Assuring That Cause of Conditions Adverse to Quality Determined & C/A Taken to Preclude Repetition of Listed Events ML20057C3021993-09-13013 September 1993 Notice of Violation from Insp on 930730-0830.Violation Noted:Plant Sys Operator & Licensed Shift Foreman Erroneously Isolated Component Cooling Water to Secondary HX Loads ML20056E3221993-08-12012 August 1993 Notice of Violation from Insp on 930712-16.Violation Noted: NRC Identified Multiple Examples of Containers of Radioactive Matl That Were Not Labeled as Required by Licensee Procedure ML20056D2141993-07-23023 July 1993 Notice of Violation from Insp on 930621-25.Violation Noted: Licensee Issued Liquid Waste Release Permit for Batch Release of Liquid Waste Monitor Tank Which Failed to Identify Particulate Nuclides ML20128A6821993-01-26026 January 1993 Notice of Violation from Insp on 921208-930108.Violation Noted:Lubricating Oil Was Not Properly Controlled in That Oil Other than That Specified in Applicable Equipment Lubrication & Vendor Manuals Used in Listed Equipment ML20248C8111989-07-27027 July 1989 Notice of Violation from Insp on 890424-27 & 0508-12. Violations Noted:Circuit Breakers Not Calibr for Several Yrs Due to Temporary Change Notice to Maint Procedure FNP-0-MP-28.116 Deleting Calibr Requirement for Dc Breakers ML20247R5241989-07-26026 July 1989 Notice of Violation from Insp on 890509-10.Violations Noted:On 890429,30 & 0501 Licensee Affixed Byproduct Matl to Us Currency to Identify Thief & on 890507 Plant Operator Observed Entering High Radiation Area W/O Dosimeter ML20246B0121989-06-16016 June 1989 Notice of Violation from Insp on 890411-0510.Violations Noted:Containment Integrity Breached During Replacement/ Placement of Fuel within Reactor Containment ML20245H5561989-04-19019 April 1989 Notice of Violation from Insp on 890311-0410.Violation Noted:Fire Protection Panel for Sys FSP-21-59 at 139 Ft Elevation of West Corridor Placed in Override Position on 890224 to Perform Cleaning & Calibr of Sys Smoke Detectors ML20245D8061988-09-26026 September 1988 Notice of Violation from Insp on 880811-0910.Violation Noted:Valve Left Open Following Addition of Resin to Cation Demineralizer During Mar-May 1988 Refueling Outage & Bearing Oil Cooler for Pump 2A Overheated ML20151L5741988-07-21021 July 1988 Notice of Violation from Insp on 880611-0710.Violation Noted:Deficient Procedural Implementation Re Storage of 18 Charcoal Filter Elements in Penetration Ventilation Equipment Room ML20151D6401988-07-0707 July 1988 Notice of Violation from Insp on 880511-0610.Violation Noted:Failure to Follow Procedures for Storage of Compressed Gas Cylinders & to Provide Adequate Operability Insps on Unit 1 post-accident Containment Ventilation Filter Unit ML20150C1221988-06-28028 June 1988 Notice of Violation from Insp on 880516-20 & 0606-10. Violation Noted:Procedure,Used to Perform RCS Water Inventory Balance,Was Not Capable of Performing That Required Surveillance Reliably ML20154P5901988-05-20020 May 1988 Notice of Violation from Insp on 880328-0401.Violation Noted:Licensee Failed to Make Attenuation Corrections for Calibr Detectors W/Solid Geometrics Which Resulted in Inaccurate Gamma Spectroscopy Measurements of Gaseous Matl ML20154Q0311988-05-18018 May 1988 Notice of Violation from Insp on 880222-26 & 0307-11. Violation Noted:Failure to Follow Procedures & Failure to Prevent Deficient Conditions from Reccurring in Cases Listed ML20151N8591988-04-19019 April 1988 Notice of Violation from Insp on 880321-24.Violation Noted: Cabinet Containing Safeguards Info Insecure & Unattended ML20148E6191988-03-18018 March 1988 Notice of Violation from Insp on 880229-0304.Violation Noted:Personnel Designated as Operations Shift Aide, Appointed by Interim Emergency Director,Did Not Receive Required Annual Retraining for Communications Personnel ML20148F4271988-03-10010 March 1988 Notice of Violation from Insp on 880104-06.Violation Noted:Radiological Exclusion Area Not Provided W/Locked Doors,But Was Provided W/Warning Signs & Flashing Red Light,Not Adequate to Prevent Unauthorized Entry ML20150B2981988-02-25025 February 1988 Notice of Violation from Insp on 880112-0210.Violations Noted:Required Fire Watches Not Initiated & Fire Suppression Sys Inoperable for 14 H ML20150B5871988-02-19019 February 1988 Notice of Violation from Insp on 871202-04.Violations Noted: Valve Testing Not Performed in Accordance W/Approved Test Procedure & Licensee Failed to Provide Instructions for Fill & Vent of Portion of RHR Train a Piping ML20236X8281987-12-0404 December 1987 Notice of Violation from Insp on 871102-06.Violation Noted: Emergency Diesel Generator Test Data Logs Not Completed as Specified in 850909 Operations Dept Memo ML20236R8301987-11-17017 November 1987 Notice of Violation from Insp on 871019-23.Violation Noted: Work Performed Inside Controlled Area W/O Wearing Protective Clothing Required by RWP 0-87-001A ML20236M9981987-11-0303 November 1987 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Inadequate Control & Installation of Purchased Equipment & Inadequate Corrective Actions & Insps ML20236M8011987-10-28028 October 1987 Notice of Violation from Insp on 870910-1009.Violation Noted:Continuous Fire Watch Assigned to Roof of Auxiliary Bldg to Monitor Open Flame Operations Associated W/Roofing Repairs Not Alert to Duties ML20235U9351987-10-0505 October 1987 Notice of Violation from Insp on 870818-0910.Violation Noted:Normal Air Pressure Status Lights on Main Control Board in Control Room Not Illuminated When Sufficient Air Pressure in Air Receivers to Start Diesel Engines ML20238A3791987-09-0101 September 1987 Notice of Violation from Insp on 870710-0818.Violation Noted:Failure to Establish,Implement & Maintain Procedures, Per Tech Spec 6.8.1 ML20236J7561987-07-30030 July 1987 Notice of Violation from Insp on 870611-0710.Violation noted:post-maintenance & Design Change Insp Program Not Adequate to Demonstrate That Sys & Components Installed,In That Fire Dampers on Trains a & B Electrically Inoperable ML20235F4751987-07-0202 July 1987 Notice of Violation from Insp on 870518-0612.Violations Noted:On 870508,RHR Pump Room Cooler Returned to Svc W/O Required Functional Acceptance Testing & Valve Lineup Performed & Failure to Establish Procedure for Testing ML20215B3461987-06-0404 June 1987 Notice of Violation from Insp on 870411-0518 ML20206C5601987-03-27027 March 1987 Notice of Violation from Insp on 861211-870110.Violations Noted:Foreman & Group Supervisor Responsible for Activities of Work Re Maint Work Requests 141322,141323 & 141324 Failed to Control Quality of Work Performed ML20205P7421987-03-20020 March 1987 Notice of Violation from Insp on 870224-27 ML20205P0741987-03-19019 March 1987 Notice of Violation from Insp on 870126-30 ML20207T5711987-03-13013 March 1987 Notice of Violation from Insp on 870111-0210 1999-07-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20210H1591999-07-23023 July 1999 Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J6971998-07-0101 July 1998 Notice of Violation from Insp on 980412-0530.Violation Noted:Several Conditions Adverse to Quality Associated W/Cr Ventilation Sys Were Not Promptly Corrected.Conditions Inappropriately Closed Out Before Adequate C/As Completed ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20236J8121998-06-29029 June 1998 SALP Repts 50-348/98-99 & 50-364/98-99 Covering Period 961124-980530 IR 05000348/19980091998-05-11011 May 1998 Special Insp Repts 50-348/98-09 & 50-364/98-09 on 980323-25. Violations Noted.Major Areas Inspected:Follow Up on OI Rept 2-97-011 Issued on 980209 Re Improper Weld Repair IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19983001998-04-0606 April 1998 NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed Tests) for Exams Administered on 980312-13.Concluded Candidates Performance on Written & JPM re-take Exams Satisfactory ML20217E5921998-03-23023 March 1998 Notice of Violation from Insp on 980111-0212.Violation Noted:While Performing Maint on 1A Centrifugal Charging Pump,Maint Personnel Violated Requirements of FNP-0-M-001, Rev 13 IR 05000348/19980011998-03-23023 March 1998 Insp Repts 50-348/98-01 & 50-364/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities1998-03-0909 March 1998 PNO-II-98-013:on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198N9961997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20198N9481997-12-29029 December 1997 Notice of Violation from Insp on 971019-1129.Violation Noted:As Early as June 1985,licensee Identified Degradation of Cork Seal Between Containment & Auxiliary Bldg Walls, Condition Adverse to Quality IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors ML20199H1281997-11-17017 November 1997 Notice of Violation from Insp on 970907-1018.Violations Noted:Battery Capacity After Svc Test Was Inadequate & Check Valve V003 & V002D F & H Were Not Flow Tested in Manner That Proves That Disk Travels to Seat on Cessation ML20199H1541997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution IR 05000348/19970101997-10-0606 October 1997 Insp Repts 50-348/97-10 & 50-364/97-10 on 970803-0906. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20211Q9391997-10-0606 October 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970906 Licensee Installed One 1-inch Thick Wrap of Kaowool on Sides & Bottoms of Raceways BDE-9 & BDE-15, Carrying Train B Charging Pump Power Cable in Fire Area IR 05000348/19970121997-09-26026 September 1997 Insp Repts 50-348/97-12 & 50-364/97-12 on 970818-22. Violations Noted.Major Areas Inspected:Review of Fire Protection Program Activities to Support Design Basis of Silicone Foam Fire Barrier Penetration Seals ML20211K8161997-09-26026 September 1997 Notice of Violation from Insp on 970818-22.Violation Noted: Noted:Nrc Identified That Licensee Failed to Correctly Translate Applicable Design Specfication Input Requirements for Kaowool Electrical Raceway Fire Barrier Sys at Plant IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217R2021997-08-28028 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 970616,most of M&TE Used Onsite Did Not Have Written & Approved Calibration Procedures PNO-II-97-039A, on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power1997-07-21021 July 1997 PNO-II-97-039A:on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions1997-07-18018 July 1997 PNO-II-97-039:on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20148K6431997-06-0909 June 1997 Notice of Violation from Insp on 970330-0510.Violation Noted:On 970321,facility Licensee Physician Determined That Licensed Operator Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) as Measured by Std of ANSI/ANS-3.4-1983 ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20196G4241997-05-0606 May 1997 Notice of Violation from Insp Completed on 970314.Violation Noted:Prior to 970314,licensee Failed to Prescribe Documented Instructions or Procedures to Implement Listed Activities Affecting Quality of Operation of PRF Sys ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics IR 05000348/19973001997-04-22022 April 1997 Exam Repts 50-348/97-300 & 50-364/97-300 on 970324-27.Exam Results:Two of 5 Applicants Passed Exam.One Was Grades as Marginal Pass ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7851997-03-17017 March 1997 Notice of Violation from Insp on 970105-0215.Violation Noted:Test Engineer Failed to Comply W/Procedural Requirements of FNP-1-STP-124.0 During Performance Testing of Plant Penetration Room Filtration Sys Train a ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise 1999-09-02
[Table view] |
Text
. >
NOTICE OF VIOLATION Southern Nuclear Operating Co. Docket Nos. 50-348 and 50-364 Farley Nuclear Plant License Nos. NPF-2 and NPF-8 During an NRC inspection conducted on August 12-16 and 26-30,1996, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below:
A. 10 CFR Part 50, Appendix B, Criterion V requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
Operations Quality Assurance Policy Manual, Section (@) 5.1 Instruction, Procedures and Drawings, states that Southem Nuclear Company - Farley Project will perform safety related activities in accordance with properly approved instructions, procedures and drawings and that contractor and vendor organizations will perform safety-related ;
activities in accordance with properly approved instructions, procedures, and drawings.
Contrary to the above, as of August 10,1996, properly approved configural control procedures and drawings were not followed in that the "as built" sample line for the Unit 1 Post Accident Sampling System containment airborne particulate detector was ,
not constructed in accordance with Production Change Notice (PCN) No. B-79-553.
Specifically,90 degree elbows were installed in the filter inlet line. 1 1
This is a Severity Level IV violation (Supplement IV). I B. 10 CFR 50.54(h) requires, in part, the license to be subject to the provisions of the Act now or hereafter in effect, and to all rules, regulations and orders of the Commission.
By letter dated March 14,1983, an Order to implement and maintain license commitments for post-TMI related items was issued. The Order referenced l commitments documented in letters dated April 16,1982, and June 4,1982, issued in l response to NRC Generic Letters 82-05 and 82-10, and specified, in part, that Three Mile Island (TMI) Action item II.F.1-3 was complete.
4 NUREG 0737, Clarification of TMI Action Plan Requirements, Table ll.F.1-3 Containment High Range Monitor, specifies, in part, a monitor range of 1 Roentgen per hour (R/hr) to 10' R/hr, and that in situ calibration by electronic signal substitution )
is acceptable for all range decades above 10 R/hr. l l
Enclosure 1 9610100047 60927 PDR ADOCV 05000348 G PDR
l 1 l l Notice of Violation 2 !
Contrary to the above, as of August 12,1996, the licensee failed to implement and maintain the March 14,1983 Order, in that, in situ special calibration by electronic signal substitution for all range decades above 10 R/hr were not conducted for the installed containment high range monitors.
l This is a Severity Level IV violation (Supplement IV).
C. 10 CFR 20.1904(a) requires, in part, that each container of licensed material bears a durable, clearly visible label bearing the radiation symbol and the words " CAUTION, RADIOACTIVE MATERIAL" or " DANGER, RADIOACTIVE MATERIAL." The label must provide sufficient information (such as nuclides present, estimates of quantities of radioactivities, radiation levels, kinds of materials) to permit individuals handling or using the containers, or working in the vicinity of the containers, to take precautions to avoid or minimize exposure.
Contrary to the above, as of August 26,1996, the licensee failed to label properly, two SurPac Casks located outside of the Radiologically Controlled Area and which contained resins having rad %nuclide materials exceeding the quantities listed in Appendix C to 10 CFR SS 20.1001-20.2401. The labels did not provide radiation levels or estimate activities, did not indicate time and dates for radiological surveys I conducted, and did not identify the kinds of materials present. Similar labels were affixed to empty SurPac Casks within the same general area.
l This is a Severity Level IV violation (Supplement IV)
D. Technical Specification (TS) 6.11 requires, in part, that procedures for personnel radiation protection be prepared consistent with the requirements of 10 CFR Part 20 and be approved, maintained and adhered to for all operations involving personnel radiation exposure. i l
Procedure FNP-O-M-001, Health Physics Manual, Rev.12, effective July 14,1996,
@ 5.4 requires dosimetry devices to be worn on the front of the body between the neck and waist inclusive. The Thermoluminescent Dosimeter (TLD) and Digital Alarming Dosimeter (DAD) should be wom near each other on the body.
Contrary to the above, during the week of August 26,1996, numerous individuals within Radiologically Controlled Areas of the Unit 1 and Unit 2 Auxiliary Buildings and the Low Level Radioactive Waste building were observed with personal dosimetry not being worn on the front of the body between the neck and waist, and with the TLD and DAD separated from each other.
This is a Severity Level IV violation (Supplement IV).
Notice of Violation 3 E. TS 6.8.1(i) requires, in part, that written procedures be established, implemented and maintained covering programs for effluent and environmental monitoring, using the guidance in Regulatory Guide (RG) 4.15, February 1979.
RG 4.15 specifies, in part, that procedures for storage of samples be designed to ,
maintain the integrity of the sample from time of collection to time of analysis. l Contrary to the above, as of August 12,1996, the licensee failed to have an adequate i procedure to maintain iron-55 (Fe-55), strontium (Sr)-89, and Sr-90 concentrations in solution for composite samples collected and stored to assure representative liquid effluent stream measurements.
This is a Severity Level IV violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Southern Nuclear Operating Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region 11, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previously docketed correspondence if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g.,
explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for
Notice of Violation 4 I withholding confidential commercial or financialinformation). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Dated at Atlanta, Georgia this)7 day of September 1996 l
l l
l I
l l
..