05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed
ML20133P854
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/20/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133P856 List:
References
B16128, NUDOCS 9701270126
Download: ML20133P854 (1)


LER-2096-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed
Event date:
Report date:
2452096064R00 - NRC Website

text

. . _ . _

i g Millaunc Offices

  • Rogw Ferry Hd., Waterford. Ur '

Utilities System e.o.no 128 Waecrford, Ur 06385-0128 (860) 447-1791 January 20,1997

! Docket No. 50-245 B16128 r

Re: 10CFR50.73(a)(2)(i) ,

t U.S. Nuclear Regulatory Commission a 4

Document Control Desk Washington, DC 20555 ,

.This letter forwards Licensee Event Report (LER) 96-064-00, documenting an event that -

2 ' occurred at Millstone Nuclear Power Station, Unit No.1 on December 20,1996. This report is '

< submitted pursuant to 10CFR50.73(a)(2)(i).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments contained within this letter. All other statements contained within this letter are for information only.

i B16128-1 NNECO commits to verify and document the qualifications of other Key Personnel by January 31,1997.

l B16128-2 NNECO commits to verify the accuracy of the documents approved by the former Unit Director at Plant Operations Review Committee and Site Operations Review Committee meetings. This verification will be conducted by grouping- the

, documents by the systems that they affect and then completing the verification prior 7

~

to declaring the individual systems operable.

B16128-3 Additionally, for the systems that are currently operable, NNECO commits to complete the verification by February 28,1997.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY t A Wm P. D. HinneTikamp V Director, Unit Operations.

Attachment:

LER 96-064-00 ,

cc: Dr. W. D. Travers, Director, Soecial Projects 1t@

y

11. J. Miller, Region 1 Administrator ,

S. Dembek, NRC Project Muunger, Millstone Unit No. I i g

T. A. Eastick, Senior Rendent Inspector, Millstone Unit No.1 (

1 9701270126 PDR 970120ADOCK PDR i OSOOO245l*

8 g