05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr

From kanterella
Jump to navigation Jump to search
Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr
ML20141G502
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/19/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141G504 List:
References
B16039, NUDOCS 9705220387
Download: ML20141G502 (1)


LER-2096-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr
Event date:
Report date:
2452096009R00 - NRC Website

text

. . _. . _ ._ -. . . .. _=, m . . . _ m.

e" Northeast hone WGno Horm Fun Rd. Linfoni. Q

.' f/ gp Utilities System en am i28 barrfont. (:T ON18 > 0128 (800) 447-1741 MAY l 91997 Docket No. 50-245 B16039 Re: 10CFR50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission

~ Document Control Desk Washington, DC 20555 l

This letter forwards supplemental Licensee Event Report (LER) 96-009-01, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. I on January 9,1996. This supplemental LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

LER 96-009-00 committed to provide a supplement report once additional structural analysis was completed on the isolation condenser system. Accordingly, the Cause of Event, Analysis of Event and Corrective Action sections have been updated and Commitment Nos. B15567-1 and B15567-2 are now closed. Also, Commitment No. B15567-4 is witiidrawn smce the additional analysis has determined that the makeup water temperature of 32 degrees F is acceptable and procedural controls are~ not necessary. Commitment B15567-3 has been updated with the 32 degrees F being the lower bound temperature.

The following is the only remaining Northeast Nuclear Energy Company's (NNECO's) commitment made within this letter. All other statements made within this letter are for information only.

B15567-3 NNECO commits that the Updated Final . Safety Analysis Report will be revised to incorporate 32 degrees lower bound for the isolation condenser makeup water temperature, based on the results of the isolation condenser shell analysis prior to startup for operating Cycle 16.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I d-P?Tilfinnenkailip Director, Unit Operations p

Attachment:

LER 96-009-01 cc: Dr. W. D. Travers, Director, Special Projects g9 g H. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1

' T. A, Eastick, Senior Resident Inspector, Millstone Unit No. I 9705220387 970519 PDR S

ADOCK 05000245