Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 890106
ML17284A549
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/1988
From: SORENSEN G C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-213, TAC-63934, NUDOCS 8810130125
Download: ML17284A549 (16)


Text

~XC CELERATED DIS@IBUTION DEMONSTR i ON SYSTEM REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)ACCESSION NBR: 8810130125 DOC.DATE: 88/10/06 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides quarterly rept re License'ondition 2.C.(16), Attachment 2,Item 3(b)"Wide Range Neutron Monitor." DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR Q ENCL~SIZE: TITLE: OR Submittal:

General Distribution DOCKET 05000397' NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R

.-COPIES"" LTTR ENCL LTTR EN 5 XD CODE/NAME PD5 PD'ECIPIENT-~f"'f"'"'OPIES CL D INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NUDOCS-ABSTRACT XU!NRC PDR , A 9 K R, Z9 TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL A,.t)~,l S WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 S810130125 S81006 PDR ADOCK 05000397 R PDC October 6, 1988 G02-88-213 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 llashington, D.C.20555 Gentlemen:

Subject:

Reference:

NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21 LICENSE CONDITION 2.C.(16), ATTACHMENT 2 ITEM 3(b)HIDE RANGE NEUTRON MONITOR 1)Letter, RB Samworth (NRC)to GC Sorensen (SS)Issuance of Amendment No.60 to Facility Operating License No.NPF-21 llPPSS Nuclear Project No.2 (TAC No.66889), dated June 10, 1988 2)Letter, G02-88-167, GC Sorensen (SS)to NRC, same subject, dated July 29, 1988 In Reference 1)the Supply System was required to report to the NRC by July 29, 1988 and quarterly thereafter.

The purpose was to report actions taken to ensure the installation of a fully qualified neutron flux monitoring instrumen-tation system to be completed at the earliest possible date.In Reference 2)the Supply System submitted the initial report, and committed to provide the fir st quarterly report by October 7, 1988.The purpose of this letter is to provide that quarterly report.go<(

4 a w)

P.aoe Two LICENSE CONDITION 2.C(16), ATTACHMENT 2 ITEM 3(b)-WIDE RANGE NEUTRON MONITOR 0 During the month of August, the Supply System witnessed the successful proof testing of the test specimen in preparation for LOCA testing.Approximately one week later the Supply System witnessed initiation of the LOCA test at Wyle Labs.On September 19, 1988 the LOCA test was completed.

The Supply System expects to receive the test report showing satisfactory results from Gamma-Metrics within the next 30 days.The Supply System will also receive a copy of the test procedure used by Gamma-Metr ics to establish that joints in the test specimen were of high quality.During our next refueling outage (Spring 1989)Gamma-Metr ics and the Supply System must perform similar tests on the equipment installed in WNP-2.Following satisfactory completion of such tests the Supply System will submit a letter in satisfaction of the subject license condition.

The next required quarterly report sHall be submitted by January 6, 1989.,Very truly yours, G.C.Sorensen, Manager Regulatory Programs HLA/bk cc: JB Martin-NRC RV NS Reynolds-BCPER RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A

~~I a 4~~t' MULTI-Purr lssuL HUNGER ACTJCC M-ISSUE TITLE LICBSEE 96'LBKNATHN STATUS 1.A.l.I..l*1.A.1 l.2"):A.1.1 3 FOOy"j.A.1.l.4~l.A l.2 1.1.1.3 l FQOR t.A.l.3.2 F062>A 2.l.l L A.2.l.2).A.2r 1 3 I.A.2 1.4 FQOS l.A.2 1.5 J.A.2.3 t.A.3.1.l l.A.3 l.2 1.A.3.3..3.A l.A.3 Z.3.8"J.B.1.2 I.C.1.1>.C.1 2.A FM4 1.C.1.2.8 f694 l.C.i.3.A F005 1.C.l.3.8 PC95 l.C.2 J.C.3>.C.4 i.C.5 F096 l.C.6 fool.'.C.l.1"!.C.P.2"I.C.B!.0.1 (See FOGS 5 FN1)1.0.2..F$8 SMIFT 0 I C SBIFT TEOMCAL ADM%R-THH SPECS................................,........,......,...........c................,..'.('HIFT TKQSECAL NMQN-TQAX59 AIR LL CAT 8......SNFT TECGMCRL RGVEMR-GESIEGE LGGG TERR PROGRAM.........,............-....-.............+-..........;

"+...>>.SHIFT SUPEWIMR RESmmalLITIES...............................................................<-..........:

..F:..';..-.'.L T PT s~~~~~o~o r~~o r~a a e e~~too~~~~oe~~~ot~~s~a oat a~~o~~~~et~oooootoet e~~~~O~~~e s~e~~N%6IATP U11DD6 OP Ro Ea SN T5MgNG AN gUAL SRO EXPER C BREDIATE UPQSDIRG OF RO 4 SRO TRhINNG AN gUAL.-SRO'S BE RO'S 1YR.........................&.......................

I@KDIATE UPGNMN QF RO 8 SN TRAINING AN qVAL.3 N TRAINING......................

c M4EDIATE UPGAAMNG OF$8 4 SRO TRAINING AN)(PAL.-HODIFY TRAINHG...........................

+.'......................

JRKOIATE QPGRADIh5 OF Ro 5 SRO TRAIHIHG AND OPAL.-FACILITY CERTIF...........................

+.......................

QKSTRATH5 6F TRQ NK PSRA5 r o~~~r~~~~o~~~~~~o~~~~~~o~~s~t~e~~~to~~~o~ot~ot~~e~~~~~~~~stets~ooa~ott~s~C REVISE SCOPE 4 CRETEMA FOR LMEHSIHG EXANS" IIKREASE SCOPE...................................~

~."..~..-..--...---".

REVISE SCOPE 4 CRITERIA FOR LICNSISG EXANS-IRCREhSE PASSING GRADE...........................+.......................

RENSK SCOPE 4 mlT.FOR UC.ESNS-'BSLATOR PLANTS SITH SINLATGRS G.r~~~.~---"~~~~~~~~~~REVISE SMPE 8 CRIT.FCR LICe EXES" SIRJLATGR" OTHER PLAHTS.............................."~j~....----"""~""~.ENLISTIOLl GF OMZNIOH 8t HSl8ENTr~~~~~~~~e~~~~o o s~~e e o o s~~a o o~~~~o~~~o o o e~~t~~~~~~~~~~o~o o~~~~a~~~~~~~~~C SBORT-TERS ACCIDEg 4 IPR9CEIJRES REVIfH-SB LOCA..................aoo aaaa.o~~soot~seto~s~aaaa..aaa~~.~..eo~~~~~~~s~~~~C QSRT-TEN ACCID.8 PNKEONES REV." MS'.CORE COOL.REAHAL.GUIDELINH...,................+

.......................

QSRT-TERN ACCID.5 PROCEDURES REV.-IHADEq.CORE COOL.REVISE PROCEDURES.....................

~...-...................

QSRT-TE88 ACCID.4 NGCEDNES REV" TRANSIENTS 8 ACCOTS.REANAL GUIDELNES (PROC.GN.PXG.3"~--------"~"-----"~-%9RT-TM ACCIDDo 4 PNKEQNES REV." TRANSIENTS 8 ACCORS.REVISE PROCSURES (UPtGRAbS EDP'S)..&.............

~~"-----.MFT 4 RELIEF TLSQPER P1lOCERRESr e~~~a r r~~~~~~a~'r~~~~~~o e~~~a~s~~~o a~o e o t o t a a~~~a~~a~e~e a o e o e~~~~~~o~C C NIFT MSIM REQQSIBILITYe a o~~~~r~~~~~~~~~~~~~~~s~o o t~~~~o e~~e~o~a e~e~~~~~~s~~~~~~~o~o e~~e~a~~e o e~~e e e~c%0'0l I lws Rlvw taarara Mes~t~o~o~~e~~e e o o~~e~~~~r~~~~~~~~~s~tot~~~ooe~~~o~~~eto~~~~~et~tttt~eaooo~o~~~~~o~ee~~~a~C 8 8 r~a~r r r~r~~~~~o~~~~~a~~soot~~~~~e~~o~soot~~~~s~~o~oo~~a~~~eo~~~~~~s~VERIFY GNRECT PIERFORNNKE QF 9PERATIHG ACTIVITIES..............................,.....................,.................

C.G~SSS VBSOR AEVo GF PROC UN M TEST PROGRAHr r~r~r~~~~e a o t~~a~o o~~~e e t~~~~~~~~~~~~o~~~~~~~~~~~~~~~~~o~o~a~a e s~~LGSS 9880R REV.OF PSK-ASAR AKEHSIN 4 ENER.PROCS...........,............,..............

c..................----.

PiLOT%4 QF SELECTED BBGECY PROC FOR NTOLSr r~r~~~~~~~~~a o~~~~e~o~~~~o e~~~s~~~~~~o o~~~~~~~~~e e a~'~a e\o a\~~e e o~t o MTROK"RON DESI'KVI85 (STER DATA FOR HPA FOOB Sc 5 A F-071).........

o~p0...:......P

.-.F....................

Se 6'fe~nt7A-pO7 1~c PULMT"SAFETV PARNGKR DISPLAY'ONSOLE

-GESCRlPTIGHrr r r~~ra~a~eras~eae~~~ee~~~~e~~~~~~oo o~~r~~rr~~oe~r~~r~reset~~o~'C~

'k NULTI-PLAttT ISSUE NURSER ACTI&N.ISSUE TDLE LICENSEE IHPLENEttTATION STATUS i.D.2.2 I.D.2.3"I Gslsl"I.G.l.2"I.G.l 3 II.B.I.l II.B.l.2 II.B.1.3 II.B 2.1"If~8.2.2"II.B 2.3"Il.8.2.4"II.8.3.l"II.B 3.2 AII.8.3 3"II.B.3.4'I.8.4.l"II.B.4.2.A"Il.B 4.2.8 j I.D.I.l"II.D.l.2.A"I I.9.1.2.8 I I.D.1.3"II D.3.1"JI.D.3.2"I I.E.l.l.1 (SEE NOTE l)*I I.E.1.1.2 (SEE NGTE 2)II.E l.l.3 (SEE tOTE 3)F009 F069 F010 F010 F011 FOI2 F013 FOl3 F013 PEART-SAFHY PARAHETER DI SPUMY CMSOLE INSTALLED c PLNtT"SAFiETV PARAHETER DISPLAY COftSOLE-FULLY IHPLEHENTEO.........................k,.....................

TRAIttEKG fmRING LSt-PfSER TESTING" PROPOSE TESTS..................,.......................~................,....,..

TRAINtS DURING L(N POHER TESTING-SUBHIT AtNL.8 PROCS.....

TRAINNG fNlRIKG LSf-PNER TESTING-TRAIttING lk RESUf TS.....................................k.......................

REACTOR-CMLAftr SYSTEH VENS-DESIGft VEttTS................................................K......................., REACTOR COO}PAT SYSTEH VEttTS IttSTALL VEHTS (Lt CAT 8)c REACTOR-COOLAftT SYSTEH VEttTS" PROCEDURES......................'............................+

........................

PLANT SHIELMt6-REVIEM DESIGNS.............................,..........................,..<

...,.....,..............

PLANT SHIELOING-CORRECTIVE ACTIONS TO ASSURE ACCESS......................................~

.......................

PLANT SftIELM%" PLANT NDIFICAT?ONS (LL CAT B)....................................................,................

PLANT SftIELDING

-E(VIPHENT gVALIFIChTIOtt-NOT TRACKED AS h TM ACTIDft ITEH................C.............

~-......~.~POSTACCIDENT SAHPLIttG-INTERN SYSTEH.....................................................

c.........................'OSTACCIBEttT SAÃPLING-CORRECTIVE ACTIQftS.................................................+..........,..............

POSTACCIDEHT SAHPLlttG-PLANT tNDIFICATIMS (LL CAT 8)...............

c TRAIttfIHG FOR HITIGATENG CORE DAHAGE DEVELOP TRAINIttG PROGRAH c TRAItlIKG FDR HITIGATING CORE NPAGE-IttITIAL...............................'........,......c.........................

TffAIttlftG FOR HITIGATENG CORE DAHAGE-COHPLETE.RELIEF 8 SAFETY VALVE TEST REgUIREHEttTS

-SUBHIT PROGRAH...................................~

.........,........-..--.

RELIEF 5 SAFETY VALVE TEST REgUIREHENTS

-COHPLETE TESTING.................................k........................

RELIEF 5 SAFETY VALVE TEST REqUIREHENTS

-PLAttT SPECIFIC REPORT............................'4

.....-.......-.-.."" RELIEF 5 SAFETY VAVLE TEST REgUIREHEttTS

-Bf.OCK-VALVE TESTIttG..............................~

+......~..-.---..---" VALVE PQSETlaN INDICATION

-INSTAl.l DIRECT ItfDICATIONS OF VANE POS..................................................

VALVE PDSTImf INDICATION

-TECH SPECS A FS ENLorooo rovn Po oraLYSIS o~~~~r s'~~~o~~~~~o~~~~~~~~s~s~~~o.~~~s o~s~~~~~~~~~O o r~~~~o+oo4 o~r~r~o~~O r~~~o~~~~~g HfANATM SHORT TERH SSo~~~~s~~~~~~~~s o~o~~r~~~o~r~~o~~o o s~~~~~~~o o o o~~~~~4 s~~~~~~~~s~o~o~~~s r~~~~~~~~/~fN a2 gag 4L,HA piller)~~~~s~~~r~~~~~~~s~o~~~~s~o o o~,~~~o~~~~~r~s~~~~~o~~~~~s~~~~~o sr~~r f t<~~~~~~o~~~~~~o o~~~~o r~~NOTE l-THE ITEN LISTED IS FROM NHEG-0737, EttCLOSURE 2 AND IS APPLICABLE 70 NOLS'S ONLY NOTE 2-TPZ ITEN LISTED IS FOR ALL PLANTS (OPERATIttG REACTORS AND tfTOL'S)NOTE 3-THE ITSY LISTED IS F08 ALL PLUS (OPERATItw REACTORS AND NTOL'S)"2-I YNLTI-PLANT ISSUE NUHBER ACTION 8).ISSUE TITLE LICENSEE INPLEHEHTATION STATUS CV O I-4 QJ~I-II E.1.2.1eA IZ.E l-2.1.8 II.E.l 2.2.A"II.E.1.2.2.B"II.E 1.2.2.C<<I I.E.3.l.1"II.E.3.1 2 I I.E.4.1.1*I I.E.4.1.2"1 i.E.4.l.3 JI.E 4.2.1-4"EI.E.4.2.5.A*I J.E.4.2.5.B f I.E.4.2.6 Il E.4.2.7"II.E.4.2.8"IJ.F.l 1'fl F.l.2oA"II F 1.2.8"II.F.1.2.C"II.F.1.2.9"II.F.X.2.E"I I.F.1.2.F"II.F.2.1"I I.F.2.2<<JI.F.2.3*I I.F.2.4"I I.G.1.3."II.G.1 2 li K 1 gper.FOle F019 F020 F020 F02 j/vCM@f F022 F923 F024 F025 F026 F026 Reactors Only)ms IHITIATIOM C, FLm-CONTROL GRADE.......................................................

<J><...................

AFS INITIAZIOII L FLS" SAFETY GRAGEo~~e~~~o~~e~~~~~~~e.~~.o~.~~~~oe~~e~o~~~~~~~~e~~~~~ooo~~~~~~~~~ooo~~~soeoe~~~AFS IHITIATIGH L FLOM-FLOM NMCATION CONTROL GRADE.....................................A(~

..................

AFS INITIATIM 5 FLGbf" I.L CAT A TECH SPECS..AFS INITBTINI 4 FLS SAFETY GRADE o~~~~~~~~o o~o~e o~~o~~~~s~~~~e~~o~~o~o o Js~~~o~o~o~~~e~~~o o~~BIERGEBCY ONER FOR PRESSURIZER HEATERS-UPGRADE POMER SUPPLY............................

~l~...................

ENERGEtKY PGtKR FOR PRESSURIZER HEATERS-TECH SPECS...........,..........................8 4..................

DEDICNEO HYOROGEH PEHETRAT10HS DESIGII~o s~~o o~~~o~~~~~~~~~~~~~o~~~~~~~e~~~~~~~~~~~~~~~~o o o o o o o~~~~~~~~e OEOICATED HYDROGEN PENETRATIONS

-REVIEW 8 REVISE H2 COHTROL PROC...............,..........--.--...-"..-.---.---

OEDICATN IIYOROGEH PENETRATIOH

-IHSTALL...........................-..............................................

C.COHMQKN ISOLATION DEPENDABILITY IHP DIVERSE ISOLATION C CONTAIgKNT ISOLAT.DEPENDABILITY

-CNTHT PRESS.SETPT.SEECIFIY PRESS.........-...................--......-

~-.~~COHTAINKNT ISOLATION OEPENDABILITY CNTHT PRESSURE SETPT l%DS c COHTAIINENT ISOLATION QEPENOABILDY CNTHT PURGE VALVES c CONTAIHNENT ISOLATION DEPENDABILITY

-RADIATION SIGNAL ON PURGE NLVES.....................c...................-.

CONTAINMENT ISOLATION OEPENDABLITY TECH SPECSo e o~~~~~~~~s~~~~o~~~~~~~~~~~~~o~~e o~~~~~o e~~~~~~~e~~~~~~~~~~o~~~c.ACCIDENT-INNITORIHG

" PROCEDURES.

~~~~~~~~~~~~o~~~o~~~~~e~~~~~~~e~~~~~~~~o~s~~~o o~~~e~~e~~~~~~C ACCIDENT-NNITORIHG-ROBLE GAS NNITOR....

C+ACCIDENT-WITORIRG-IODINE/PARTICULATE SAHPLIHG...................;

-~..-~........+...

-.-~-.-A-6'4~-'-"+-

~--" ACCIOEHT-IONITDRING

-COAMENT HIGH-RANGE HGHITOR.ACCIOENT-INNITORIK CONTINENT PRESSURE c ACCIOENT-INNITDRIti6

-COHTAINEHT STER I.EVEL.......

ACCIDENT-SITORM-CONTAIIMT HYOROGEH...............................-...............k--....-..---."---.-

INSTRNENTATIOM FOR DETiCT.OF MADE(UATE CORE COOLING-PROCEDURES~.......................

~/+........-....-.---

INSTRUNENTATIOM FOR DETECT.OF IHADE(UATE CORE COOLING-SUBCQOL HETER.....................~L'+...........


.~-~NSTRINENTATIOR FOR DETECT, OF IHADE(UATE CORE COOLING-DESC.OTHER.......................

+.....................

INSTRUlIBITATMII FOR DETECT.OF INADE(UATE CORE CLING INSTI.L A%'L IIISTRUHTAT?N.

POWDER SUPP.FOR PRESSURIZER RELIEF, BLOCK VALVES h.LEVEL INDo-UPGRADE....................

~!"...................

PNER SUPPo FOR PRESSURIZER RELIEF BLOCK VALVES 4t LEVFI Iles TECH SPo~~e o~~~~e~o~~o~e o o~o le~~~~~~~~o~~~~o s e~~e BULLETINS P9 05>P9 06~79 08s~e o~~~~~~~~~~~~~e~~o~~~~o~~o~o o o e e o~~~~~o~~~e~~o~~~~~~~~~~~~o o~~~~~s~~~~~~~e~~~CA 6)P7 (9 3 MLTI-PUNT ISSUE NUBBER ACTIQ{N.ISSUE TITLE LICENSEE IKPLEHNTATION STATUS CC V)C9"II.K.1.5"I I.K.1.10"II K.I.20"Ii.K.1.21"II.K 1.22"I I.K.1.23"I I.K.2.2*II K 2i8 II.K.2.9 II.K.2.10*Ili K.2.11 I I.K.2.13 I I.K.2.14 II.K 2.15 II K.2.16 II.K 2.17 II K.2.19"I I.K.2.20"I I.K.3.1.A"I I.K.3.1.S IE.K.3.2 I I.K.3.3 I I.K.3.5.A fI.K 3.5.B II K.3.7 I i.K.3.9 JI.K.3.10 II.K 3.11 EI.K.3.12.A II.K 3 12.S I I.K 3.13.A II.K.3e13.8 F027 F02S F029 F030 F031 F032 F033 F035 F035 F037 F038 vaag F03S f042 F043 F&D t~o o~~~~~~~~e~~~~~~~~~~~~t~~~m/~e~o~'o e i e e t t~~~~~~~~t~~e~t~o~~~~~~~ls~ti~o~~~~~e~e~~~ett e C~~~~e~-~~o~~~~e t e~~~t~~~~~et~"C e~~~~~~.~e O~~~to~~~~~o~~~~~~o tee~~~'Oo Otto~e~o~~~~~~o~~~~~u/A~~~~~IO t t t o~~~~~~~t~e~~~~~~~~~o i~~eW~~t~~~~~~e~~~~~~~~~~>/A~~~~~~~i~~~~~~~~~~~~~~e~~~~alii~~~\~~~~~~~~~~~~~~~e~o~~~~~e/8 et~~8~~~e~~~~~~~I~~~o~te~~~~~~ttt~t~~~~~~e~~~~~~~~~~~~~/A~~~e~~eo~~e~~~~~~~~~~~~ee~~~HIP~~~~~~~~~~~~t t~~~~~~~~~~~~~v/8~~~e~~~i~e~~~~t t~~~~o~~~~e~e>/a~~e e~~t~~~~o~~~o~~~~o o~~~~~~~~~~e~~~~~~~e~~t e~~~~~~~t~~~t~~t~~e e~~o~~~t~e~~~~~~~~~~~~~~~~~t~~e~~~~~~t o~~~t~~~~~~w/A~~~~~~e to~~~~~e~e~eto~~~~~~~C~~~~~~i~o~~~~~~~~~t e~~~~~~~~W/A~~~~t~~~~~~~~e~~~~t t~~~~~~e~~e~~~~t%~~~to~~e~~~~t,t~~~~~~N/g tttt~et~~~~~o~~~e~e~o~~e~~~~teide A~e~~~~~~~e~~~~.~~i~~~ott~~t~~~~~~~~~~~i~~~~~ee~~~t i t~Ve~~~~~~~~e~~~~~~~o t~~~~~~~~4o~~~~e t~e o~r~~~~~t o o u/4~~~~eeetitot~e~~t~oe~~~~~o~o C~e e~e~~i~\~~~~~o~~~~~~e~~~~~t~e~~~~SO j...e r%RATGR.~~~~~~t~~~~e~~~~~~e~~~~~e~~~~e~e~i~e~~~~~~~~t~~~~~~t~~~~~~~e~~t~~~~~~~~t~~~~~~~~~t~~e~~~~t i~~~~~~~~~~t~~~~~~it~~~~~~~~~e~~to~~~t~~~~~~~~~to~et~~e~~~~~~~~~~t o~t e~t to~~~~~\~\~~~t~~t~t o~~~~~~~~~~t~o~e~to o~i~et~~~~~~e~~~~~et~~~o e~~~~~t\~~~e~o~o t o~~~~~~~~e~o~~~e~~e~~~eo~et~~~~~eoo e~~~Ooe~~otttte~~~~~~~o~i~~~~o~~~~o~o~~~t~\'E BULLH'IHS" RKVIBt ESF VALVES..........................

IE aULLETI~S-OPaumrLm STATUS:::::::::::::::::::::::::.:::::::::

If BULLETINS-PNNPT~L RERCTOR'NIP.....IE BULLETINS-AUTO SG ANTICIPATORY REACTOR TRIP....................

IE BULLETINS-AUX HEAT REH SYSTEM, PROC.......................-..

~If BULLETINS-RV LEVEL, PRQCEDURES....

ORDERS OH MM PUNFS-PROCEDURES TD CONTROL AFM IHD QF ICS------.

~-QRDERS N Mht PLANS" lJPGRAOE hFM SYSTBl........

QRDERS{Ai EL@PLANTS-FEHA OH ICS..................................

ORDERS OH RN PUTTS-SAFETY"GRADE TRIP...........................

ORDERS OH SiLQ PLANTS-DPERATDR TRAIHING.....................--...

~QRDERS IN BM PLANTS-THERMAL MECHANICAL REPORT (CE 8 M PLANTS AL ORDERS QH MM PLANTS-LIFT FRE(UEHCY OF PDRV'S 8 SV's............

-.ORDERS OH BM PLANTS" EFFECTS QF SLUG FLOW...............,.........

ORDERS OH BSQ PLNTS-RCP SEhL DAMAGE.................

ORDERS M 88ht PLAWTS-VOIDING IH RCS (CE 4 M PLANTS ALSO).........

BENCNARK JQNLYSIS QF SEgllEHTIAL AFM FLOE TO ONCE THROUGH STH GENE ORDERS OM 854 PLAN'lS-SYSTEM RESPONSE TO SS LOCA.............-e-eee BM TASK FORCE-ASTQHATIC PORV ISOLATION DESIGH..FINAL RECQ@ENATIONS, SLO TASK FORCE-AUTO PDRV I50 TEST/ItiSTALLe e Mo TASK FORCE-NPORT QH PORV FAILURES BM TASK FORCE-RKPQRTING SV 4 RV FAILURES AND CHALLENGES..........

BM TASK FORCE" AUTO TRIP QF RCP'5 PRDPOSED HODIFICAEIOHS.........

510 TASK FORCE-AUTO TRIP OF RCP'S HODIFICATIOHS BC6 TASK FORCE-EVALUATION OF PORV OPENING PROBABILITIES...........

SED TASK FORCE" POD mHTRDLLER NDIFICATION.

B49 TASK FORCE-PNPOSEO ANTICIPATORY TRIP MODIFICATIONS...........

St6 YAM FORCE JUSTIFY USE OF CERTAIN PORV........................

%6 ThSK FORCE-APsTICIPATORY TRIP OH TURBINE TRIP PROPOSE9 NDS....5$TASK FORCE" R4HCIPATQRY TRIP GH TURBINE TRIP INSTALL NDS..856 TASK FORCE-HPCI 4 RCIC SYSTEM IHITIA710N LEVELS ANALYSIS BM TASK FORCE" HPCI h RCIC IHITIATIDH LEVELS NDIFICATEON.........

C r 4 ISSUE BORER lCULTI-PLAN ACTION M.ISSUE TITLE LICENSEE IS'LBKNTATION STATUS<<I I.K.3.14 II.K.3.15 I I.K.3.16A II.K.3 16.8 II.K.3 17 II K 3.28.A II.K.3 18.B II.K.3.18.C"I I.Ko 3.19"II.K.3.20[1 K.3.21.A II K.3.21.8 II.K.3.22 A II K.3.22.B II K.3.24 II.K.3.25.A II.K.3.25.8

'I.K.3.27 II.K 3.28<<II.K03.29

'1.K.3.300 A I I.K: 3.300 B I I.K.3.30.C II K.3.31"I I.K.3.40<....

SQ TASK FORCE-ROOIFY HPCI 4 RCIC BRK DETECTION CIRCUITRY..................................+....

MO TASK FORCE-CHALLENGE 4 FAILURE QF RELIEF VALVES STUDY...............,...,..............<......

MO TASK FORCE-CHALLENGE h.FAILURE OF RELIEF VALVES HGDIFICATIONS.......................:

..<......BM TASK FOfKE-ECC SYSTEH OUTAGES.........

MO TASK FORCE-ADS ACTVATIN STUDY....SQ TASK FORCE-ADS ACTUATION PROPOSED HODIFICATIONS fRO TASK FORCE-ADS ACTVATIM NDIFICATIONS........

NS TASK FORCE" INTERLOCK RECIRCULATORY PUHP HODIFICATIONS...

u/a 840 TASK FORCE" LOSS OF 5VC MTER AT BRP.............;

-......................................~/~

.....MO TASK FORCE.-RESTART OF CSS 8 LPCI LOGIC DESIGN..........................................+......

BQl TASK FORCE-RESTART OF CSS 4, LPCI lOGIC DESIGN HODIFICATINS............................+......

MtD TASK FORCE-RCIC SUCTION VERIFICATION PROCEDURES........................................~......

RS TASK FORCE-RCIC SUCTION NDIFICATION...................................................Q...., BKO TASK FORCE-SPACE COOLIHG FOR HPCI/RCI LOSS OF AC POMER......................."....'..."...~J<."...'M)

TASK FORCE-USER OH PlNP SEALS PROPOSED MODIFICATIONS.................................>.-..~~...

NS TASK FORCE-POMER ON PllP SEALS MODIFICATIONS...........................,.......,.......t.'-..>...

QLG TASK FORCE-GOGH REFERENCE LEVEL FOR BMRS....................,........................K

.....BM TASK FORCE-gNLIFICATIM OF ADS ACCUMULATORS

......................................c

...MO TASK FORCE-PERFORNANCE QF ISOI.ATION CONDENSERS....................................,....>7<

...MO TASK FORCE-SCHEOVlE FOR OUTLINE OF SB LOCA MODEL..........

BQl TASK FORCE-SB LOCA KSEL, JUSTIFICATION.......................................,...,,..........

BLO TASK FORCE" SB LOCA 8DJlOD5 NEQ ANALYSES.................................,...

5'......BM TASK FORCE" COhPLIAlKE ARITH CFR 5D.46.............................".........,.......,....5:.....

.&0 7ASK FORCE-RCP SEAL DAMAGE-COVERED BY II.K.2.16 AND II.K.3.25.....................,..

+.....Mo TASK FORCE" EFFECTS OF Sl.UG FLOW-COVERED SY II.K.'2.15.....................,...........~P.....

BAG TASK FORCE-EVALUATE TRANSIENT WITH SINGLE FAILURE................,.................,...5:.....

BEG TASK FORCE-ANUSES Ta SUPPORT............,.............".."..".."..."..".....".."...'.".."..".."..~.;...

RESPONSE TO LIST OF CONCERNS FROM ACRS CONSULTANT............................................g:.....

IDENTIFY WmER SOURCES PRIOR TO MANUAL ACTIVATION Or'ADS'......'...'....".'............"....".."...."..'iK:::

EHERGENCY PREPAREDNESS, SHORT TERM......

'J

]RULTI-P1NT ISSUE NNBER.ACTIOH NO.ISSUE TITLE LICENSEE IN'LEHBiTATMH STATUS I JI-A-1-2.1 III.A 1:2.2 (SEE F663, I I I.A.l.2.3 (SEE F063, II I.A.2.1 I II.A.2.g"III.D.l.l.l"I I I.D.X.l.2]II.O.3.3.1 III.D 3.3.2 III.D.3.4.1"II I.D.3.4.2"?I I.D.3.4.3 HPA-FQOS HPA-F063 HPA-F064 HPA-F065 HPA-F071 HPA-S072 HPA-BOS3 67.4.1'UPGRAQE ERERGENCY QJPPQRT FACILITIES

" INTERN TSC OSC 8c EDF.................................c..

UJ%RAOE BKRGBKY SUPPORT FACILITIES-DESIGN-NCORP.

INTO F063/F664tF065.......................<......,,.....

F060, F065)F667 F068 F064, F0653 UPGRADE ENER SUPPORT FACILITIES

-NNS IKORPOR.INTO f063, F064 5 F065..............:.......

c.............

UPGRADE PREPARElPZSS

-UPGRADE BKRGBKY PLANS TO APP.E.10 CFR 50...........................~/P......,.....

UPGNNE PREPAQEINESS

" METEOROLOGICAL OATA...............,....:..................~8~............

PRIaaV COOLANT OUTSISE CONTAISKNT LBK REtmCTIN.c NINRY COOLAN OUTSNE CNTAIQKN-TECH SPECS...........................................,,~.............

IHPUST RAD.SNIT.-PROVIDE HEARS To DETER.PRESENCE OF RADIOIODIHE.........................~.............

F069 NPUNT RADIATION fSNIT.-NMFICATIO6 TO ACmRATELY NEAS.IODINE...........................~.............

F076 CONTROL NKN NBITABKLiTY REVIBf c F070 CNTROL ROON HABITABILITY

-SCHEDULE NSIFIChTIONS..

CGKfROL ROTI HABITABILITY

-MPLEHEN 80DIFICATIONS FGOS D 1 1 DETAILED CONTROL ROfN DESIGN REVIEM PRGGRAH PUSL.s<~..;!<~mew-e~vS F963 III.A.l.2 TENNICAL SUPPORT CENTER-.FO64 1II.A.3..2 OPERATIfNAL SUPPORT CENER.F065 1II.h.l.2 BKRGBlCY OPERATIONS FACILITY..

....................

.........................c.............

F071 A c~~I.9.1.2 DETAILED CONTROL RGB REVIBf (FOLUNUP TO F-S).....................,......,....~.

~..".~~~~~...4..

8072 tmAEG-0733 TECH SPECS (GENERIC LETTERS 82-16 8 S3-02)..............................

.:.......c..........

" 8083.TECH SPEC COVEREO BY GENERIC LETTERS 83 g6 4 83 37 FOR ImREG 0737 c 6001 REACTOR CGOLNIT PQP TRIP (GENEREC LETTER 85-12)........................,....,....

~JAt...........

t~~~el~~~o~~~0~t~~~~~~o~~~~~~~e'1~~0~0 0~~~4 I 0 1 0~~0~~OOI~~~~e u3 PJ (9 N m ld~Q 6) 0