Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 890106
ML17284A549
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-213, TAC-63934, NUDOCS 8810130125
Download: ML17284A549 (16)


Text

~XC CELERATED DIS@IBUTION DEMONSTR i ON SYSTEM REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSION NBR: 8810130125 DOC. DATE: 88/10/06 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397' AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides quarterly rept re License'ondition 2.C.(16),

Attachment 2,Item 3(b) "Wide Range Neutron Monitor."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR Q ENCL ~ SIZE:

TITLE: OR Submittal: General Distribution NOTES: D RECIPIENT .- COPIES"" 'ECIPIENT -~ f"'f "'" 'OPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR EN CL PD5 LA PD5 PD 5 SAMWORTH,R

, A INTERNAL: ACRS ARM/DAF/LFMB NRR/DEST/ADS 7E NRR/DEST/CEB 8H 9 NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DOEA/TSB 11 K NRR/PMAS/ILRB12 NUDOCS-ABSTRACT OGC/HDS2 XU!

RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC R,

A,.

t)

~,l S

Z9 TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 S810130125 S81006 PDR ADOCK 05000397 R PDC October 6, 1988 G02-88-213 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 llashington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 LICENSE CONDITION 2.C.(16), ATTACHMENT 2 ITEM 3(b) HIDE RANGE NEUTRON MONITOR

Reference:

1) Letter, RB Samworth (NRC) to GC Sorensen (SS)

Issuance of Amendment No. 60 to Facility Operating License No. NPF-21 llPPSS Nuclear Project No. 2 (TAC No. 66889), dated June 10, 1988

2) Letter, G02-88-167, GC Sorensen (SS) to NRC, same subject, dated July 29, 1988 In Reference 1) the Supply System was required to report to the NRC by July 29, 1988 and quarterly thereafter. The purpose was to report actions taken to ensure the installation of a fully qualified neutron flux monitoring instrumen-tation system to be completed at the earliest possible date. In Reference 2) the Supply System submitted the initial report, and committed to provide the fir st quarterly report by October 7, 1988. The purpose of this letter is to provide that quarterly report.

go< (

4 a

w)

P.aoe Two 0

LICENSE CONDITION 2.C(16), ATTACHMENT 2 ITEM 3(b)-WIDE RANGE NEUTRON MONITOR During the month of August, the Supply System witnessed the successful proof testing of the test specimen in preparation for LOCA testing. Approximately one week later the Supply System witnessed initiation of the LOCA test at Wyle Labs. On September 19, 1988 the LOCA test was completed.

The Supply System expects to receive the test report showing satisfactory results from Gamma-Metrics within the next 30 days. The Supply System will also receive a copy of the test procedure used by Gamma-Metr ics to establish that joints in the test specimen were of high quality. During our next refueling outage (Spring 1989) Gamma-Metr ics and the Supply System must perform similar tests on the equipment installed in WNP-2. Following satisfactory completion of such tests the Supply System will submit a letter in satisfaction of the subject license condition. The next required quarterly report sHall be submitted by January 6, 1989.

,Very truly yours, G. C. Sorensen, Manager Regulatory Programs HLA/bk cc: JB Martin - NRC RV NS Reynolds - BCPER RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

~

~

I a 4

~ ~

t'

MULTI-Purr lssuL HUNGER ACTJCC M- ISSUE TITLE LICBSEE 96'LBKNATHN STATUS 1.A. l. I.. l SMIFT 0 I C

  • 1. A. 1 l. 2 SBIFT TEOMCAL ADM%R - THH SPECS................................,........,......, ...........c................,..'.(

"):A. 1.1 3 FOOy TKQSECAL NMQN - TQAX59 AIR LL CAT 8...... 'HIFT "j.A. 1. l. 4 SNFT TECGMCRL RGVEMR - GESIEGE LGGG TERR PROGRAM.........,............-....-.............+-..........; "+...>>.

~l . A l. 2 SHIFT SUPEWIMR RESmmalLITIES...............................................................<-..........: ..F:..'; .. -.'.

1.1.1.3 l FQOR L T PT s ~~~ ~o ~ o r~ ~ o

~ r ~ a a e e ~ ~ too ~ ~ ~ ~ oe ~ ~ ~ ot ~ ~ s ~ a oat a ~ ~ o ~ ~ ~ ~ et ~ oooootoet e ~ ~ ~ ~ O ~ ~ ~ e s ~e ~ ~

t. A. l. 3.2 F062

> A 2.l.l N%6IATP U11DD6 OP Ro Ea SN T5MgNG AN gUAL SRO EXPER C L A.2.l.2 BREDIATE UPQSDIRG OF RO 4 SRO TRhINNG AN gUAL. SRO'S BE RO'S 1YR.........................&....................... c

).A.2r 1 3 I@KDIATE UPGNMN QF RO 8 SN TRAINING AN qVAL. 3 N TRAINING......................

- HODIFY TRAINHG........................... +.'......................

I.A.2 1.4 FQOS M4EDIATE UPGAAMNG OF $ 8 4 SRO TRAINING AN) (PAL.

l.A.2 1.5 JRKOIATE QPGRADIh5 OF Ro 5 SRO TRAIHIHG AND OPAL. - FACILITY CERTIF........................... +.......................

J.A.2.3 QKSTRATH5 6F TRQ NK PSRA5 r o ~ ~ r ~ ~ ~ o o o ~ ~ s ~ t~e ~ to ~ o ot ~ ot ~ ~ eC~ ~ ~ ~ ~ ~ ~ ~ stets ~ ooa ~ ott ~ s ~

l

~ ~ ~ ~

SCOPE...................................~ .".. ..-..--...---".

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

t .A.3. 1. REVISE SCOPE 4 CRETEMA FOR LMEHSIHG EXANS " IIKREASE ~ ~

l.A.3 l.2 REVISE SCOPE 4 CRITERIA FOR LICNSISG EXANS - IRCREhSE PASSING GRADE...........................+.......................

1.A.3.3..3.A RENSK SCOPE 4 mlT. FOR UC. ESNS -'BSLATOR PLANTS SITH SINLATGRS G.r ~ ~ ~ . ~ --- "~

l.A.3 Z.3.8 "J. B. 1.2 REVISE SMPE 8 CRIT. FCR LICe EXES ENLISTIOLl GF OMZNIOH 8t HSl8ENTr ~ ~ ~ ~

" SIRJLATGR " OTHER

~ ~ ~ ~

PLAHTS.............................." ~j~....----"""

e C

~ ~ ~ o o s ~ ~ e e o o s ~ ~ a o o ~ ~ ~ ~ o ~ ~ ~ o o o e ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ o o ~ ~ ~ ~ a ~ ~ ~ ~

~ ""

~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~

~

I.C.1.1 SBORT-TERS ACCIDEg 4 IPR9CEIJRES REVIfH SB LOCA..................aoo aaaa.o ~ ~ soot ~ seto ~ s ~ aaaa..aaa C ~ ~ . ~ ..eo ~ ~ ~ ~ ~ ~ ~ s ~ ~ ~ ~

>.C.1 2.A FM4 QSRT-TEN ACCID. 8 PNKEONES REV. " MS'. CORE COOL. REAHAL. GUIDELINH...,................+ .......................

1. C. 1.2.8 f694 QSRT-TERN ACCID. 5 PROCEDURES REV. IHADEq. CORE COOL. REVISE PROCEDURES..................... ~ ...-...................
l. C. i. 3.A F005 QSRT-TE88 ACCID. 4 NGCEDNES REV" TRANSIENTS 8 ACCOTS. REANAL GUIDELNES (PROC. GN. PXG.3" ~ --------" ~" -----"~-
1. C. l. 3. 8 PC95

%9RT-TM ACCIDDo 4 PNKEQNES REV. TRANSIENTS 8 ACCORS. REVISE PROCSURES (UPtGRAbS EDP'S)..&............. ~ ~ "-----.

'r ~ ~ ~ ~ ~ ~ o e ~ ~ ~ a ~ s ~ ~ ~ o a ~ o e o to t a a ~ ~

C l.C.2 MFT 4 RELIEF TLSQPER P1lOCERRESr e ~ ~ ~ a r r ~ ~ a ~ ~ a ~ ~ a ~ e ~ e a o e o e ~ ~ ~ ~ ~ ~ o ~

MSIM REQQSIBILITYe

~ ~ ~ ~

C J.C. 3 NIFT a o r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s ~ o o t ~ ~ ~ ~ o ~ e ~o e ~ ~ a e ~ e ~ ~ ~ ~ ~ ~ s ~ ~ ~ ~ ~ ~ ~ o ~ o e ~ ~ e ~ a ~ ~ e o e ~ ~ e e e ~

~ ~ ~ ~ ~

tot eto et ~ tttt c ~ eaooo ee 8

~ ~ ~ a ~

>.C.4 %0'0l I lws Rlvw taarara Mes t o o ~ ~ e ~ ~ e e oo ~ ~ e ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ s ~ ~ ~ ~ ooe ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ o ~

8

~ ~ ~ ~ ~

soot C eo i.C. 5 F096 r ~ a ~ r rr ~ r ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ a ~ ~ soot ~ ~ ~ ~ ~ e ~ ~ o ~ ~ ~ ~ ~ s ~ ~ o ~ oo ~ ~ a ~ ~ ~ ~ ~ ~ ~ ~ ~ s ~

ACTIVITIES..............................,.....................,................. C.

'."!.C.C.l.

l. C.6 1

P.2 fool . VERIFY GNRECT PIERFORNNKE QF 9PERATIHG SSS VBSOR AEVo GF PROC LGSS 9880R REV. OF PSK

- UN M ASAR AKEHSIN 4 ENER.

TEST PROGRAHr r r

~ ~ r ~ ~ ~ ~ e a o t ~ ~ a ~ o o ~ ~ ~ e e t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

PROCS...........,............,.............. c..................----.t o ~ ~

G

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ o ~a ~ a e s ~ ~

\ \

o a ee o ~ o PiLOT %4 QF SELECTED BBGECY PROC FOR NTOLSr r e e a e "I.C.B ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ a o ~ ~ ~ ~ e ~ o ~ ~ ~ ~ o e ~ ~ ~ s ~ ~ ~ ~ ~ ~ o o ~ ~ ~ ~ ~

6...:......P

'fe~

~ ~ ~ ~

- pO7 1

~ '

~ a nt7A .-.F....................

~ ~

!.0.1 (See FOGS 5 FN1) MTROK"RON DESI'KVI85 (STER DATA FOR HPA FOOB 5 A Sc F-071)......... Seo~ p0 c rr 1.0.2.. F$ 8 PULMT"SAFETV PARNGKR DISPLAY'ONSOLE

- GESCRlPTIGHrr r r ~ ~ ra ~ a ~ eras ~ eae ~ ~ ~ ee ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ oo o ~ ~

~

r ~ ~ ~ ~ oe ~ r ~ ~ r ~ reset ~ ~ o ~

'C ~

'k NULTI-PLAttT ISSUE NURSER ACTI& N. ISSUE TDLE LICENSEE IHPLENEttTATION STATUS

i. D.2.2 F009 PEART-SAFHY PARAHETER DI SPUMY CMSOLE INSTALLED c I. D.2.3 F069 PLNtT"SAFiETV PARAHETER DISPLAY COftSOLE - FULLY IHPLEHENTEO.........................k,.....................

"I Gslsl TRAIttEKG fmRING LSt-PfSER TESTING " PROPOSE TESTS..................,.......................~................,....,..

"I.G. l. 2 TRAINtS DURING L(N POHER TESTING - SUBHIT AtNL. 8 PROCS.....

"I.G.l 3 TRAINNG fNlRIKG LSf-PNER TESTING - TRAIttING lk RESUf TS.....................................k.......................

II.B.I.l REACTOR-CMLAftr SYSTEH VENS - DESIGft VEttTS................................................K.......................,

II.B.l.2 F010 REACTOR COO}PAT SYSTEH VEttTS IttSTALL VEHTS (Lt CAT 8) c II.B. 1.3 F010 REACTOR-COOLAftT SYSTEH VEttTS " PROCEDURES......................'............................+ ........................

II.B 2.1 PLANT SHIELMt6 - REVIEM DESIGNS.............................,..........................,..< ...,.....,..............

"If 8.2. 2

~ PLANT SHIELOING - CORRECTIVE ACTIONS TO ASSURE ACCESS......................................~ .... ...................

"II.B 2.3 F011 PLANT SftIELM% " PLANT NDIFICAT?ONS (LL CAT B)....................................................,................

"Il.8.2.4 PLANT SftIELDING - E(VIPHENT gVALIFIChTIOtt- NOT TRACKED AS h TM ACTIDft ITEH................C............. -......

"II.8.3.

"II.B 3.2 l POSTACCIDENT SAHPLIttG - INTERN SAÃPLING - CORRECTIVE SYSTEH.....................................................

~ ~ . ~

AII.8.3 3 ACTIQftS.................................................+..........,.............. c.........................'OSTACCIBEttT "II.B.3.4

'I.8.4. l FOI2 F013 POSTACCIDEHT SAHPLlttG -

TRAIttfIHG FOR HITIGATENG CORE DAHAGE PLANT tNDIFICATIMS (LL CAT DEVELOP TRAINIttG PROGRAH 8)............... c c

- IttITIAL...............................'........,......c.........................

"II.B.4.2.A FOl3 TRAItlIKG FDR HITIGATING CORE NPAGE "Il.B 4.2.8 F013 TffAIttlftG FOR HITIGATENG CORE DAHAGE COHPLETE .

j I.D. I.l RELIEF 8 SAFETY VALVE TEST REgUIREHEttTS - SUBHIT PROGRAH...................................~ .........,........-..--.

"II.D.l.2.A RELIEF 5 SAFETY VALVE TEST REgUIREHENTS - COHPLETE TESTING.................................k........................

"I I.9.1.2. 8 RELIEF 5 SAFETY VALVE TEST REqUIREHENTS - PLAttT SPECIFIC REPORT............................'4 .....-.......-.-..""

I I.D. 1.3 RELIEF 5 SAFETY VAVLE TEST REgUIREHEttTS - Bf.OCK-VALVE TESTIttG..............................~ +......~ ..-.---..---"

"II D.3.1 VALVE PQSETlaN INDICATION - INSTAl.l DIRECT ItfDICATIONS OF VANE POS..................................................

"JI.D.3.2 VALVE PDSTImf INDICATION - TECH SPECS "II.E. l. l. 1 AFS ENLorooo rovn Po oraLYSIS o ~ ~ ~ ~ r s' ~ ~ o ~ ~ ~ ~

~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ s ~ s ~ ~ ~ o. ~ ~ ~ s o ~ s ~ ~ ~ ~ ~ ~ ~ ~ ~ O o r~~~ ~ o+oo4 o ~ r ~ r ~ o ~ ~ r ~ ~ ~ o ~ ~ ~ ~ ~ ' '

l)

O (SEE NOTE

  • II.E.1.1. 2 (SEE NGTE 2) g HfANATM SHORT TERH SSo ~ ~ ~ ~ s ~ ~ ~ ~ ~ ~ ~ ~ s o ~ o ~ ~ r ~ ~ ~ o ~ r ~ ~ o ~ ~ oo s ~ ~ ~ ~ ~ ~ ~ o o o o ~ ~ ~ ~ ~ 4 s~ ~ ~ ~ ~ ~ ~ ~ s ~ o ~ o ~ ~ ~ s r ~ ~ ~ ~ ~ ~ ~

II.E l.l.3 fN a2 gag 4L,HA piller) ~ ~ ~ ~ s ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ s ~ o ~ ~ ~ ~ s ~ o o o ~, ~ ~ ~ o ~ ~ ~ ~ ~ r ~ s ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ s ~ ~ ~ ~ ~ o sr ~ ~ r~/~

f t< ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ o o ~ ~ ~ ~ o r~ ~

(SEE tOTE 3)

NOTE NOTE l2 -- THE ITEN LISTED IS FROM NHEG-0737, EttCLOSURE 2 AND IS APPLICABLE 70 NOLS'S ONLY TPZ ITEN LISTED IS FOR ALL PLANTS (OPERATIttG REACTORS AND tfTOL'S)

NOTE 3 - THE ITSY LISTED IS F08 ALL PLUS (OPERATItw REACTORS AND NTOL'S)

"2-

I YNLTI-PLANT ISSUE NUHBER ACTION 8). ISSUE TITLE LICENSEE INPLEHEHTATION STATUS II E.1.2.1eA ms IHITIATIOMC, FLm-CONTROL GRADE....................................................... <J><...................

IZ.E l-2.1.8 AFS INITIAZIOIIL FLS" SAFETY GRAGEo ~ ~ e ~ ~ o ~ ~ e ~ ~ ~ ~ ~ e. .o .

~ ~ ~ ~ ~ ~ oe ~ ~ e ~ o ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ooo ~ ~ ~ ~ ~ ~ ~ ~ ~ ooo ~ ~ ~ soeoe ~ ~ ~

AFS IHITIATIGHL FLOM - FLOM NMCATION CONTROL GRADE.....................................A(~ ..................

~ ~ ~ ~

II.E.l 2.2.A "II.E.1.2.2. B AFS INITIATIM5 FLGbf " I.L CAT A TECH SPECS..

"II.E 1.2.2.C AFS INITBTINI4 FLS SAFETY GRADE o ~ ~ ~ ~ ~ ~ o o ~ o ~ e o ~ ~ o ~ ~ ~ ~ s ~ ~ ~ ~ e ~ ~ o ~ ~ o ~ o o Js ~ ~ ~ o o o

~ ~ ~ ~ ~ e ~ ~ ~ oo ~ ~

SUPPLY............................ ~l~...................

~ ~

<<I I. E.3. l. 1 BIERGEBCY ONER FOR PRESSURIZER HEATERS - UPGRADE POMER "II.E.3.1 2 ENERGEtKY PGtKR FOR PRESSURIZER HEATERS - TECH SPECS...........,..........................8 4..................

I I.E.4.1. 1 DEDICNEO HYOROGEH PEHETRAT10HS DESIGII~ s ~ ~ o o ~ ~ o o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ooooo o o ~ ~ ~ ~ ~ ~ ~ ~ e CV *II. E.4. 1. 2 OEOICATED HYDROGEN PENETRATIONS REVIEW 8 REVISE H2 COHTROL PROC...............,..........--.--...-"..-.---.---

- IHSTALL...........................-..............................................

O "1 i. E.4. l.3 OEDICATN IIYOROGEH PENETRATIOH C.

C JI.E 4.2.1-4 COHMQKN ISOLATION DEPENDABILITY IHP DIVERSE ISOLATION "EI. E.4.2.5.A -

CONTAIgKNT ISOLAT. DEPENDABILITY CNTHT PRESS. SETPT. SEECIFIY PRESS.........-...................--......- ~ -. ~ ~

  • IJ. E.4.2.5.B COHTAINKNT ISOLATION OEPENDABILITY CNTHT PRESSURE SETPT l%DS c

c f I. E.4.2.6 FOle COHTAIINENT ISOLATION QEPENOABILDY CNTHT PURGE VALVES Il E.4.2.7 F019 -

CONTAIHNENT ISOLATION DEPENDABILITY RADIATION SIGNAL ON PURGE NLVES.....................c...................-.

"II.E.4.2.8 CONTAINMENT ISOLATION OEPENDABLITY TECH SPECSo e o ~ ~ ~ ~ ~ ~ ~ ~ s ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ e o ~

c.

~ ~ ~ ~ o e ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ e ~ ~ ~

I- "IJ.F.l F020 ACCIDENT INNITORIHG " PROCEDURES. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ o ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~

C

~ ~ ~ ~ o ~ s ~ ~ ~ o o ~ ~ ~ e ~ ~ e ~ ~ ~ ~ ~ ~

F.l.2oA 1'fl F020 - NNITORIHG - ROBLE GAS NNITOR....

C 4

QJ I- ~ "II.

"II F 1.2.8 F.1.2.C F02 F022 j /vCM@f ACCIDENT

+ACCIDENT -

ACCIOEHT - IONITDRING WITORIRG IODINE/PARTICULATE SAHPLIHG...................; - ~ .. -

- COAMENT HIGH-RANGE HGHITOR.

~........+... -. -~-. - A - 6'4~-'-"+- ~ -

c "II.F.1.2.9 F923 ACCIOENT INNITORIK CONTINENT PRESSURE "II.F.X.2.E F024 ACCIOENT - INNITDRIti6 - COHTAINEHT STER I.EVEL.......

"II.F. 1.2. F F025 ACCIDENT - SITORM CONTAIIMT HYOROGEH...............................-...............k--....-..---."---.-

"II.F.2.1 INSTRNENTATIOM FOR DETiCT. OF MADE(UATE CORE COOLING

- PROCEDURES~....................... ~/+........-....-.---

"II.F.2. 2 INSTRUNENTATIOM FOR DETECT. OF IHADE(UATE CORE COOLING

- SUBCQOL HETER.....................~L'+........... - - - -. ~ - ~

<<JI. F.2.3 F026 NSTRINENTATIOR FOR DETECT, OF IHADE(UATE CORE COOLING - DESC. OTHER....................... +.....................

  • I I. F.2.4 F026 INSTRUlIBITATMIIFOR DETECT. OF INADE(UATE CORE CLING INSTI.L A%'L IIISTRUHTAT?N.

"II.G. 1.3. POWDER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES h. LEVEL INDo

- UPGRADE.................... ~!"...................

"II.G.1 2 PNER SUPPo FOR PRESSURIZER RELIEF BLOCK VALVES 4t LEVFI Iles TECH SPo ~ ~ e o ~ ~ ~ ~ e ~ o ~ ~ o ~ e o o ~ le ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ o s e ~ ~ e o

li K 1 gper. Reactors Only) BULLETINS P9 05> P9 06 ~ 79 08s ~ e o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ o ~ ~ ~ ~ o ~ ~ o ~ o o o e e o ~ ~ ~ ~ ~ o ~ ~ ~ e ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o o ~ ~ ~ ~ ~ s ~ ~ ~ ~

3 CA 6)

P7 (9

MLTI-PUNT ISSUE NUBBER ACTIQ{ N. ISSUE TITLE LICENSEE IKPLEHNTATION STATUS "II.K.1.5 'E BULLH'IHS " RKVIBt ESF VALVES..........................

"II. K. 1. 10 IE aULLETI~S - OPaumrLm STATUS:::::::::::::::::::::::::.:::::::::

"II K.I.20 If BULLETINS -- PNNPT ~L RERCTOR 'NIP.....

t

~ oo ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~

~ ~

i \ m/~

o ~ 'o e i e e t t ~ ~ ~ ~

"Ii.K.1.21 IE BULLETINS AUTO SG ANTICIPATORY REACTOR TRIP....................

~ e e ~ e ~ ~ ~ ~ ~ ~ ~ ~ e ~

ti

~ ~ ~ ~ t~ ~ e ~ t~o ett

~

"II.K 1.22 IE BULLETINS - AUX

~ ~ ~ ~ ~ ~ ls ~ ~ o ~ ~ ~ ~ ~ e ~ e ~ ~ ~ e "II.K. 1. 23 HEAT REH SYSTEM, PROC.......................-.. C t t~

"II. K.2.2 If BULLETINS RV LEVEL, PRQCEDURES....

~ ~ ~ ~ ~ e ~-~ ~

"C o ~ ~ ~ ~ e e ~ ~ ~ ~ ~ ~ ~

e ~ ~ ~ ~ ~ ~ . ~ e O ~ ~ ~ to ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ o et ~

ORDERS OH MM PUNFS PROCEDURES TD CONTROL AFM IHD QF ICS------. ~- o ~ ~ ~ ~

  • II K 2i8 QRDERS N "

Mht PLANS lJPGRAOE hFM SYSTBl........

tee ~ ~ ~ 'Oo Otto ~ e ~ o ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~

u/A ttto ~ ~ ~ ~ ~ ~ ~t ~ e ~ ~ ~ ~ ~ ~ ~ ~

II. K.2.9 F027 QRDERS {Ai EL@ PLANTS - FEHA OH ICS..................................

~ ~ ~ ~ ~ IO i ~ ~ eW ~ ~ t ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

II. K.2.10 F02S ORDERS OH RN PUTTS - SAFETY"GRADE TRIP...........................

~ o

>/A

~ ~ ~ ~ ~ ~ ~ i~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~

  • IliK.2.11 F029 ORDERS OH SiLQ PLANTS - DPERATDR TRAIHING.....................--...

~ ~ e ~ ~ ~ ~ ~ t ~ e ~ ~ ~ ~

alii~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ o ~ ~ ~ ~ ~

I I. K.2. 13

~ ~ ~ \ ~ ~

F030 QRDERS IN BM PLANTS - THERMAL MECHANICAL REPORT (CE 8 M PLANTS ALSO

~

j... e/8 et ~ ~ 8 ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ I ~ ~ ~ o ~ te ~ ~

I I. K.2.14 F031 ORDERS QH MM PLANTS - LIFT FRE(UEHCY OF PDRV'S 8 SV's............ -. ttt ~ t ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

II.K 2.15 ORDERS OH BM PLANTS " EFFECTS QF SLUG FLOW...............,.........

~ ~ ~ ~

~/A II K.2.16 F032 ORDERS OH BSQ PLNTS - RCP SEhL DAMAGE.................

~ ~ ~ e ~ ~ eo ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ee ~ ~ ~

HIP~ ~ ~ ~ ~ ~ ~ t t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e r%

II.K 2.17 F033 ORDERS M 88ht PLAWTS - VOIDING IH RCS (CE 4 M PLANTS ALSO).........

~ ~ ~ ~ ~

v/8

~ ~ ~ e ~ ~ ~ i ~ e ~ ~ ~ ~ t t ~ ~ ~ ~ o ~ ~ ~ ~ e ~ e II K.2.19 BENCNARK JQNLYSIS QF SEgllEHTIAL AFM FLOE TO ONCE THROUGH STH GENE RATGR. ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ e ~ ~ ~ ~ ~ e e ~ ~>/a "II. K.2.20 F035 ORDERS OM 854 PLAN'lS - SYSTEM RESPONSE TO SS LOCA.............-e-eee t~~~~o~~~o~~~~oo~~~~~~

~ ~ ~ e ~ ~ ~ ~ ~ e ~ ~ ~ ~ e ~ e ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ e ~ ~ t e ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~

"I I. K.3.1.A F035 BM TASK FORCE - ASTQHATIC PORV ISOLATION DESIGH.. i

~ e ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ t t ~ ~ t ~ ~ e e ~ ~ o ~ ~ ~ t ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

"II. K.3. 1. S FINAL RECQ@ENATIONS, SLO TASK FORCE AUTO PDRV I50 TEST/ItiSTALLe e ~ ~ ~ ~ ~ ~ ~ e ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ e ~ ~ ~ ~ ~ ~ t o ~ ~ ~ t ~ ~ ~ ~ ~ ~

IE.K.3.2 F037 -

Mo TASK FORCE NPORT QH PORV FAILURES w/A

~ ~ ~ ~ ~ ~ e to ~ ~ ~ ~ ~ e ~ e ~ eto ~ ~ ~ ~ ~ ~ ~

I I. K. 3.3 F038 BM TASK FORCE RKPQRTING SV 4 RV FAILURES AND CHALLENGES.......... ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ Ci ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ t e ~ ~ ~ ~ ~ ~ ~ ~

I I. K.3. 5.A vaag " i BM TASK FORCE AUTO TRIP QF RCP'5 PRDPOSED HODIFICAEIOHS......... ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ t ~W/A ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ t t ~ ~ ~ ~ ~ ~ e ~

fI.K 3.5.B F03S 510 TASK FORCE - AUTO TRIP OF RCP'S HODIFICATIOHS it ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ to ~ e ~ ~ ~ ~ t% ~ ~ ~ to ~ ~ e ~ ~ ~ ~ t,t ~ ~ ~ ~ ~ ~

II K.3.7 BC6 TASK FORCE - ~ ~

EVALUATION OF PORV OPENING PROBABILITIES........... ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ to ~ et tttt N/g

~ et ~ ~ ~ ~ ~ o ~ ~ ~ e ~ e ~ o ~ ~ e ~ ~ ~ ~

I i. K. 3.9 SED TASK FORCE " POD mHTRDLLER NDIFICATION. ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t o ~ t teide A~e ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ .~ ~ i~ ~ ~

JI.K.3.10 B49 TASK FORCE - PNPOSEO ANTICIPATORY TRIP MODIFICATIONS........... e ~ t to ~ ~ ~ ~ ~ \ ~ \ ~ ~ ~ t ~ ott ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ee ~ ~

II.K 3.11 St6 YAM FORCE JUSTIFY USE OF CERTAIN PORV........................ ~ t ~ t o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ t i t ~ Ve ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ o t ~ ~

EI. K.3.12.A -

%6 ThSK FORCE APsTICIPATORY TRIP OH TURBINE TRIP PROPOSE9 NDS.... o ~ e ~ to o ~ i ~ et ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4o ~ ~ ~ ~ e t ~ e o ~ r ~ ~ ~ ~ ~ t o o II.K 3 12.S f042 5$ TASK FORCE " R4HCIPATQRY TRIP GH TURBINE TRIP INSTALL NDS.. u/4 e ~ ~ ~ ~ ~ et ~ ~ ~ o e ~ ~ ~ ~ ~ ~ ~ ~ ~ eeetitot ~ e ~ ~ t ~ oe ~ ~ ~ ~ ~ o ~ o I I.K 3.13.A F043 856 TASK FORCE - HPCI 4 RCIC SYSTEM IHITIA710N LEVELS ANALYSIS t \ ~ ~ ~ e ~ o ~ o t o ~ ~ ~ ~ ~ ~ ~ ~ e C~ o ~ ~ ~ e ~ ~ e ~ ~ ~ eo ~ et ~ ~ ~ ~ ~ eoo II.K.3e13.8 F&D BM TASK FORCE " HPCI h RCIC IHITIATIDH LEVELS NDIFICATEON......... e ~ ~ ~ Ooe ~ ~ otttte ~ ~ ~ ~ ~ ~ ~ o ~ i ~ ~ ~ ~ o ~ ~ ~ ~ o ~ o ~ ~ ~ t ~ \

CC V)

C9

C r 4

lCULTI-PLAN ISSUE BORER ACTION M. ISSUE TITLE LICENSEE IS'LBKNTATION STATUS

<....

II.K.3. 15 F045 SQ TASK FORCE ROOIFY HPCI 4 RCIC BRK DETECTION CIRCUITRY..................................+....

I I. K. 3. 16A FQ46 MO TASK FORCE - CHALLENGE 4 FAILURE QF RELIEF VALVES STUDY...............,...,..............<......

~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 000 ~ ~ ~ ~ ~ ~

080 II.K.3 16.8 . F046 MO TASK FORCE CHALLENGE h. FAILURE OF RELIEF VALVES HGDIFICATIONS.......................: ..<......

0 ~ ~ ~ ~ ~ 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

II.K.3 17 FO47 -

BM TASK FOfKE ECC SYSTEH OUTAGES.........

II K 3.28.A F048 MO TASK FORCE - ADS ACTVATIN STUDY....

~ ~ ~ ~ ~ ~ ~ 0 0 ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~

II.K.3 18.B F04S SQ TASK FORCE ADS ACTUATION PROPOSED HODIFICATIONS II.K.3. 18.C FO4S fRO TASK FORCE - ADS ACTVATIM NDIFICATIONS........

"II. Ko 3. 19 FOOS "

NS TASK FORCE INTERLOCK RECIRCULATORY PUHP HODIFICATIONS... u/a "II.K.3. 20 840 TASK FORCE " LOSS OF 5VC MTER AT

~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~

BRP.............; ......................................~/~ .....

[1 K.3.21.A F050 MO TASK FORCE.- RESTART OF CSS 8 LPCI LOGIC DESIGN..........................................+......

II K.3.21.8 F050 BQl TASK FORCE RESTART OF CSS 4, LPCI lOGIC DESIGN HODIFICATINS............................+......

II.K.3.22 A F051 MtD TASK FORCE - RCIC SUCTION VERIFICATION PROCEDURES........................................~......

II K.3.22.B F051 -

RS TASK FORCE RCIC SUCTION NDIFICATION...................................................Q....,

II K.3.24 F052 BKO TASK FORCE - SPACE COOLIHG FOR HPCI/RCI LOSS OF AC II. K.3.25.A ' TASK FORCE - USER OH PlNP SEALS PROPOSED POMER......................."....'..."...~J<."...'M)

MODIFICATIONS.................................>.-..~~...

~ ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ ~

\~

II.K.3.25.8 F053 -

NS TASK FORCE POMER ON PllP SEALS MODIFICATIONS...........................,.......,.......t.'-..>...

~ ~ ~ ~ 0 ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~

I. K. 3.27 F054 QLG TASK FORCE - GOGH REFERENCE LEVEL FOR BMRS....................,........................K .....

~ ~ 0 ~ 0 ~ ~ ~ 0 ~

00 00 \

0 ~ ~ ~ ~ ~ ~ ~

II.K 3.28

<<II.K03.29 F055 BM TASK FORCE -

- gNLIFICATIMOF ADS ACCUMULATORS ......................................c ...

O ~ ~ ~ ~ ~

~ ~ ~ ~ 0 ~ ~ ~ ~ 0

~

00

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~

F056 MO TASK FORCE

- PERFORNANCE QF ISOI.ATION CONDENSERS....................................,....>7< ... ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~

A MO TASK FORCE SCHEOVlE FOR OUTLINE OF SB LOCA MODEL..........

'1.K.3.300 I I. K: 3. 300 B BQl TASK FORCE SB LOCA KSEL, JUSTIFICATION.......................................,...,,.......... 00 ~ 00 BLO TASK FORCE " SB LOCA 8DJlOD5 NEQ

~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~

ANALYSES.................................,...

~ 0 I I. K.3. 30. C 5'...... 0 0 BM TASK FORCE " COhPLIAlKE ARITH CFR

~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 II K.3.31 F058 5D.46.............................".........,.......,....5:.....

~ ~

"II. K.3.40 -

.&0 7ASK FORCE RCP SEAL DAMAGE COVERED BY II.K.2.16 AND II.K.3.25.....................,.. + .....

~ 0 0 ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ ~

<<I I.K.3. 43 " -

Mo TASK FORCE EFFECTS OF Sl.UG FLOW COVERED SY II.K.'2.15.....................,...........~P.....

~ ~ 0 ~ ~ ~ ~ 0 0 0 ~ 0 0 ~ 0 ~ ~ ~ 0 0 I]. K.3.44 BAG TASK FORCE - EVALUATE TRANSIENT WITH SINGLE FAILURE................,.................,...5:.....

~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

000 00 0 ~ ~ ~ ~ ~

I I. K.3. 45 BEG TASK FORCE - ANUSES Ta SUPPORT............,.............".."..".."..."..".....".."...'.".."..".."..~.;...

~ ~ 0 ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~

~ 0 ~

0 ~ ~ 0

~ ~ ~ ~ ~

~ ~ ~ ~ 0 I].K.3.46 RESPONSE TO LIST OF CONCERNS FROM ACRS CONSULTANT............................................g:..... ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

  • II. K.3. 57 IDENTIFY WmER SOURCES PRIOR TO MANUAL ACTIVATION Or'ADS'......'...'....".'............"....".."...."..'iK::: ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~

III.A.I.l EHERGENCY PREPAREDNESS, SHORT TERM...... ~ ~ 0000 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 00 ~

'J

]RULTI-P1NT ISSUE NNBER . ACTIOH NO. ISSUE TITLE LICENSEE IN'LEHBiTATMH STATUS I JI-A-1-2.1 'UPGRAQE ERERGENCY QJPPQRT FACILITIES " INTERN TSC OSC 8c EDF.................................c..

III.A 1:2.2 UJ%RAOE BKRGBKY SUPPORT FACILITIES-DESIGN-NCORP. INTO F063/F664tF065.......................<......,,..... t~ ~ ~ el ~ ~ ~ o ~ ~

(SEE F663, F064, F0653 I I I.A. l. 2. 3 UPGRADE ENER SUPPORT FACILITIES - NNS IKORPOR. INTO f063, F064 5 F065..............:....... c.............

(SEE F063, F060, F065)

II I.A.2. 1 F667 UPGRADE PREPARElPZSS - UPGRADE BKRGBKY PLANS TO APP. E. 10 CFR 50...........................~/P......,.....

I II.A.2.g F068 UPGNNE PREPAQEINESS " METEOROLOGICAL OATA...............,....:..................~8~............

"III.D.l.l.l PRIaaV COOLANT OUTSISE CONTAISKNT LBK REtmCTIN . c "II I.D. X.l.2 NINRY COOLAN OUTSNE CNTAIQKN - TECH SPECS...........................................,,~.............

] II.O. 3. 3. 1 IHPUST RAD. SNIT. - PROVIDE HEARS To DETER. PRESENCE OF RADIOIODIHE.........................~.............

III.D 3.3.2 F069 NPUNT RADIATION fSNIT. - NMFICATIO6 TO ACmRATELY NEAS. IODINE...........................~.............

III.D.3.4.1 F076 CONTROL NKN NBITABKLiTY REVIBf c ~ 0 ~ t ~ ~ ~ ~ ~

HABITABILITY- SCHEDULE NSIFIChTIONS..

~

"III. D. 3.4.2 F070 CNTROL ROON

"? I I.D. 3.4. 3 -

CGKfROL ROTI HABITABILITY MPLEHEN 80DIFICATIONS

. s<~..;!<~ mew - e~vS HPA-FQOS FGOS D 1 1 DETAILED CONTROL ROfN DESIGN REVIEM PRGGRAH PUSL o ~ ~ ~ ~ ~ ~ ~ e '1 ~ ~

HPA-F063 F963 III.A.l.2 TENNICAL SUPPORT CENTER-.

HPA-F064 FO64 1II.A.3..2 OPERATIfNAL SUPPORT CENER. 0 ~ 00 ~ ~ ~ 4 I0 1 0 HPA-F065 F065 1II.h.l.2 BKRGBlCY OPERATIONS FACILITY.. . ... ................ .........................c.............

HPA-F071 F071 A c~~I.9.1.2 DETAILED CONTROL RGB REVIBf (FOLUNUP TO F-S).....................,......,....~. ~..".~~~~~...4..

HPA-S072 8072 tmAEG-0733 TECH SPECS (GENERIC LETTERS 82-16 8 S3-02).. ............................ .:....... cc .......... "

HPA-BOS3 8083 TECH SPEC COVEREO BY GENERIC LETTERS 83 g6 4 83 37 FOR ImREG 0737 67.4. 1 6001 REACTOR CGOLNIT PQP TRIP (GENEREC LETTER 85-12)........................,....,.... ~JAt........... ~ ~

e 0 ~ ~ OOI ~ ~ ~ ~

u3 PJ (9

N m

ld

~

Q 6)

0