|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGEDAILYUNITPOWERLEVEL*I:OMPLETED IIYV.T.ChilSOnMONTHAPRIL/1981DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
~6DAYAVERAGEDAILYPOWERLEVEL(MWe.Net) 17IS19202I24IO26l2l3l4ISl630INSTRUC11ONS Onthisformat.listtheaveragedailyunitpowerlevelinMWe-Netforeachdaytntherep<>rting n>>>nth.C>>n>putctothenearestwholemegawatt.
(o/771 1=OPERATING DATAREPORTDOCKETNO.DATE5~~81COMPLETED BYILZ~hilson TELEPHONE, C3Q54~824 OPER'ATING STATUS*l.UnitName:TurkePReporting period:Aril19813.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):8.IfChangesOccurinCapacityRatings(ItemsNumber3ThroughNotes-IJnit'No.
3remained" outofserviceforscheduled refueling, maintenance andinspections untilApriI2I,1981,whenthestatorcorefailedwhile.preparing tosynchronize generator after7)SinceLastReport,GiveReasons:-pleted;9.PowerLevelToWhichRestricted, IfAny(NetMWe);10.ReasonsForRestrictions, lfAny:ThisMonthYr..to-Date
"--Cumulative"-
-"-73664';6719.0'879.011-.HoursInReporting Period12.NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours14;HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGe'nerated (MWH)-17.-Gross Electrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)-619.UnitServiceFactor.20..UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCa'pacity Factor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type.Date.67.3760..31459.3..95223.0~-0-223.01385.6436.453891.0"121.8109197555""34693"625302527T940415-0-3283386073.262792437548.1'73'"48M-0-469.3-0-0"64.346.34.1andDurationofEach):25.IfShutDownAtEndOfReportPeriod,Estimated DareofStartup:26.UnitsInTestStatus(PriortoCommercial Operation}:
INITIALCRITICAI.ITY INITIALELECTR!CITYCOMMERCIAL OPERATION Noe-determined ForecastAchieved(<1/77)
UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHDOCKETNO.*INo.Date4JO.I-riIIIjQLice>>secEventReportCo0aCQQCrCause&Corre<<tive ActiontuPreventRe<<uncn<<e 0381-02-28491.8CN/ARCFUELXXUnitNo.3wasremovedfromserviceforscheduled refueling, mainte-nance,andinspections..
(Continued frompreviousmonth)(NuclearandNon-nuclear systems)0481-04-21227.2AGENERA(n)Statorcorefailedwhilepreparing tosynchronize generator afterscheduled refueling.
F:ForcedS:Scheduled (I)/77)Reason:A-Equipment Failure(Explain) 8-ivtai>>tenance orTest.C-Refueling D.regulatory Restri<<tiun E-operator Training&Lice>>scExamination F-Adnunistrative G.dpcrational Error(Explain)
H4tlter(Explairi)
\MethoI.Man2-pan3gp5-potI9-OtldReduction er(Explai)altalScram.tlallcScrall).-,Continuing ExltibittG
-Istructions
~tforPreparati nofDataEntiySheetslorLicenseeEvct016ExhIRepon(LERIFile(NUREG-),bllI.SatireSource
eAVERAGEDAILYUNITPOWERLEVEL*COMPLETED BYV.T.ChilsonTELEPHONE MONTHAPRXL~1981DAYAVERAGEDAILYPOWERLEVELIMWeNet)I678DAYAVERAGEDAILYPOWERLEVEL(MWe.Net) 678171012131516INSTRUCTIONS 678675678678677679682680201520674674674675675IS202l23'495262S>930NOTE;678674669661660657.656662663DST666675676672Averagedailypowerlevelgreaterthan646MWedue.to...cooler condenser coolingwater.Onthisformat,listtheaveragedailyunitpowerlevelinMWe.Netforeachdayinthereporting tn>>nth.C>>mputetothenearestwholemegawatt.
(o/77l
OPERATING DATAREPORTOPERATING STATUSTurkePointUnitNo.4760l.UnitName;2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):DOCKETNO.DATE~~~81TELEPHONE
~~i.'j7-3824 Notes-UnitNo.4operatedatapproximately 100%R.P.ex-ceptforoutagesofApril10,and11,1981.-8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ONEThisMonthYr:to-Date
'Cumulative 392.02879.06'72442.0-----49454-9--=-166.6700.531.?51348325161871661670"31634834960.93697.470.711.HoursInReporting Period719.012.NumberOfHoursReactorWasCritical706.113.ReactorReserveShutdownHours-0->>0-'4.HoursGenerator Onk.ine2366.447645.315.UnitReserveShutdownHours-0--0-16.GrossThermalEnergyGenerated (MWH)15316949917,GrossElectrical EnergyGenerated (MWH)49218018.NetElectrical EnergyGenerated(MWH) 4684511576916...2919.UnitServiceFactor82.2=20.UnitAvailability Factor97.482.223.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type.Date.andDurationofEach):SteamGenerator TubeInspection Program-Jtr1y.Z1-Aust141981.25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
ForecastAchievedINITIALCRITICALITYINITIAl.ELECTRICITY COMMERCIAL OPERATION I'i/77)
VNITSl(UTDOWNS ANDPOWERREDUCTIONS REPORTMONTHAPRIL1981*No.Daler>rsoQ4<cd~C/lLice>>secEventReport~C<0EJ'nlOcnCCQ0Cause&.Collective ActiontuPreventRecurrence 0681-04-1014.2.B1N/AIBZZZZZZUnitNo.4wasremovedfromservicetoperformIntegrated Engineered Safeguards Surveillance Test.(Nuclearsystem)0781-04-114,3MECFUNUnitwastrippedbyreactorprotec-tionsystemcausedbymalfunction oftheturbineauxiliary governorcontrolsystem.(Non-nuclear system)IF:ForcedS:Scheduled
('>/77)!Reason:<A-Equipment Failure(Explain)
'.8-Maintenance orTest~('-Refueling D.Regulatory Restriction
-EQperator Training&,Lice>>scExamination
~F-Administrative
'-Operational Error(Explain)
II-Other(Explai>>)
Method:I-pa>>Ital2.Manila)
Scram.',I3-Autytnatic Scratn.4-QQ+r-(Exphin)
Continuing 5-'LoadReduction er(Explain)
IExhibiG-Ipstructions ocaat'bnufataibi)I~SatneSourcefrPrprl,DEntrySheetsI'orLicenseeEventReport(LER)File(NUREG-Ol6l)5
AVERAGEDAlLYUNITPOWERLEVELDATECOMPLETED BYsonMONTHAPRIL,1981DAYAVERAGEDAILYPOWERLEVEL(MWe>Vet)795797794794DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 17IS20I0l3l4IS794794794795794794'7947937932122242526272S1930160755787791789790DST789789790789l6INSTRUCTIONS 449NOTE:Averagedailypowerlevelgreaterthan777MNeduetocoolercondenser coolingwater.Qnthisformat.listtheaveragedailyunitp>>werlevelinMWeNetforeachdayittthereporting
>nonth.C>>ntputetothenearestwholemegawatt.(o/77)
OPERATING STATUSOPERATING DATAREPORT~DOCKETNO.DATE~5~~81COMPLETED BYVT.ChilsonTELEPHONE QQQ.~824-802UnitNameSt.LucieUnitHo.12.Reporting Period:r83.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):8505.DesignElectrical Rating(NetMWe):5Notes-Unitoperatedatapproximately 100%R.P.exceptforoutageofApril16-21,1981.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
IfAny(NetMWe):IO.ReasonsForRestrictions, lfAny:e~Yr.-to-Date Cumulative 38-207.0ThisMonth2879.0719.02759731'85-0129.530389.339.3598.207425853970103912303440241133002179551---=-22707037---46839983.279.579.6'74.14.444-December51981.11.HoursInReporting Period12.NumberOfHoursReactorWasCritical599.713.ReactorReserveShutdownHours-0-14.HoursGenerator On4ine2758.215.UnitReserveShutdownHours-0-16.GrossThermalEnergyGenerated (MWH)1517646l7.GrossElectrical EnergyGenerated (MWH)49671018.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor95.820.UnitAvailability Factor83:295.822.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type.Date.andDurationofEachl:Scheduled refuelinmaintenance andinsections-October25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77)
UNITSIIUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.NII.DatelychIN~>>rI~AQfVA>>C0~IitLlcellscc EventReport>>III4lncnM~eo2~QCause8I.Corre<<tiveActiontoPreventRciurrcn<<e 0281-04-16P24.8TRANSPUnitwasmanuallytrippedwhenarcingwasobservedontheBphasebushingonpowertransformer No.1B.Corrective actionsincludedinstal-lingnewBphasebushingonpowertransformer Nos.1AandlBandin-spectionofbothpowertransformers.
(Non-nuclear system)S96~j'IzzzzzzzzOutagewasextendedtoperformmain-tenanceonprimaryandsecondary systems."(Nuclear andNon-nuclear systems)F:ForcedS:Scheduled (It/77)Reason:A.Equipment Failure(Explain)
IIMahttenancc orTestC-Refueling D-llegulatory Restri<<tionF..Operator Trainingk.LicenseExatnination F-Adtninistrative
.G.Operational Error(Explain)
,Il.Other (EXplaitI) i~Ih$chod:I.hlanual 5-"LohdReduc'tio nn)92-hlanual Scram.3-AutIImatic Seran.4.'...ontinuing StxlubifI-SallleSour<<<<~I,IIExhtbttiG-IpstructtonsforPreparati(Itt ofDataEntrySheetsIorLicenseeEvcittReport(LER)File(NUREG-OI6l)I FLORIDAPOWER&LIGHTCOMPANYMay9,1981OfficeofManagement Information andProgramControlsU.S.NuclearRegulatory Commission Washington, D.C.20555Gentlemen:
AttachedaretheApril,1981',Operating SummaryReportsforTurkeyPointUnitNos.3and4andSt.LucieUnitNo..1.Verytrulyyours,SchmidtVicePresident PowerResources VTC/ddccc:Mr.JamesP.O'ReillyRobertLowenstein, EsquirePEOPLE...
SERVINGPEOPLE SUMMARYOFOPERATING EXPERIENCE POCKETNO.50-250TurkeyPointUNITUnitNo.3DATEMa9,1981COMPLETED BY,V.T.ChilsonTELEPHONE (305)552-3824REPORTMONTHAPRILg1981UnitNo.3remainedoutofserviceforscheduled refueling, maintenance, andinspections untilApril21,1981,whenthestatorcorefailedwhilepreparing tosynchronize generator afterscheduled refueling wascom-pleted.Referto"UnitShutdowns andPowerReductions" sectionofApril,1981,Operating StatusReportforadditional information.
MajorSafety-related maintenance activities performed.
duringthemonthincluded:
Inspections andrequirements ofIEBulletins andNUREG-0578 arecontinuing.
FloridaPower&LightCompanycommitments forNUREG-0578 implementation arecontinuing.
Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
Completed installation'f 40newfuelassemblies.
Completed performance ofZntegratedEngineered Safeguards Surveillance Test.
SUMMARYOFOPERATING EXPERIENCE 0DOCKETNO.50-251TurkeyPoint-UNITUnitNo.4DATEMa91981COMPLETED BY'.T.ChilsonTELEPHONE 305552-3824REPORTMONTHAPRIL1981'IUnitNo.4operatedatapproximately 100%R.PexceptforoutagesofApril10,andll,1981.Referto"UnitShutdowns andPowerReductions" sectionofApril,1981,Operating StatusReportforadditional infor-,mation.MajorSafety-related maintenance activities performed duringthemonthincluded:
Inspections andrequirements ofIEBulletins andNUREG-0578 inprogress.
FloridaPowerGLightCompanycommitments forNUREG-0578 implementation arecontinuing.
Referto,'correspondence betweenFPLandNRCforadditional information.
I8g SUMMARYOFOPERATING EXPERIENCE POCKETNO.50-335St.LucieUNITUnitNo.1DATEMa91981COMPLETED BY'.T.ChilsonREPORTMONTHAPRIL1981TELEPHONE (305)552-3824Unitoperatedatapproximately 100%R.P.exceptforoutageofApril16-21,1981.Referto"UnitShutdowns andPowerReductions" sectionofApril,1981,Operating StatusReportforadditional information.
MajorSafety-related maintenance activities performed duringthemonthincluded:
Inspections andrecpxirements,of IEBulletins andNUREG-0578 arecontinuing.
FloridaPower&LightCompanycommitments forNUREG-0578 implementation arecontinuing.
Refertocorrespondence betweenFPLandNRCforadditional information.
Replacedpressurizer safetyvalveNo.V-1200.