|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILYUNIT POWER LEVEL I:OMPLETED IIY V. T. ChilSOn MONTH APRIL / 1 9 8 1 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net) 17 IS 19 20 2I
~ 6 24 IO 26 l2 l3 l4 30 IS l6 INSTRUC11ONS On this format. list the average daily unit power level in MWe-Net for each day tn the rep<>rting n>>>nth. C>>n>putc to the nearest whole megawatt.
(o/771
1=
OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY 5~~81 ILZ~hilson TELEPHONE, C3Q54~824 OPER'ATING STATUS l.
Unit Name: Turke P Notes - IJnit'No. 3 remained" Reporting period: A ril 1981 out of service for scheduled refueling, maintenance and
- 3. Licensed Thermal Power (MWt):
inspections until ApriI 2I,
- 4. Nameplate Rating (Gross MWe): 1981, when the stator core
- 5. Design Electrical Rating (Net MWe): failed while. preparing to
- 6. Maximum Dependable Capacity (Gross MWe): synchronize generator after
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: -
pleted;
- 9. Power Level To Which Restricted, If Any (Net MWe);
- 10. Reasons For Restrictions, lfAny:
This Month Yr..to-Date "-- Cumulative"- "
11-. Hours In Reporting Period 719. 0 ' 879.0 -73 664';6
- 12. Number Of Hours Reactor Was Critical 67.3 1 459.3 .. 95 760..3
- 13. Reactor Reserve Shutdown Hours 223.0 223.0 436.4 14; Hours Generator On-Line ~ 1 385.6 53 891.0"
- 15. Unit Reserve Shutdown Hours 121. 8
- 16. Gross Thermal Energy Ge'nerated (MWH) 3 025 27T 109 197 555
- 17.-Gross Electrical Energy Generated (MWH) 940 415 ""34 693 "625
- 18. Net Electrical Energy Generated (MWH) - 6 627 924 375 32 833 860
- 19. Unit Service Factor 48.1 73.2
. 20..Unit Availability Factor 48M '73' "
- 21. Unit Capacity Factor (Using MDC Net) 4 69.3
- 22. Unit Ca'pacity Factor (Using DER Net) 0 46.3 64.3
- 23. Unit Forced Outage Rate 4.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Dare of Startup: Noe-determined
- 26. Units In Test Status (Prior to Commercial Operation}: Forecast Achieved INITIALCRITICAI.ITY IN ITIAL ELECTR!CITY COMMERCIAL OPERATION
(<1/77 )
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
- I REPORT MONTH ri Lice>>sec C
o 4J 0 a Cause & Corre<<tive No. Date O. III j Event Action tu I- Q Report C Q
Q Prevent Re<<uncn<<e Cr 03 81-02-28 491.8 C N/A RC FUELXX Unit No. 3 was removed from service for scheduled refueling, mainte-nance, and inspections.. (Continued from previous month) (Nuclear and Non-nuclear systems) 04 81-04-21 227.2 A GENERA Stator core failed while preparing (n) to synchronize generator after scheduled refueling.
\
F: Forced Reason: Metho ~ t - I structions ExltibittG S: Scheduled A-Equipment Failure (Explain) I.Man al t for Preparati n of Data 8-ivtai>>tenance or Test .
2-pan al Scram. Entiy Sheets lor Licensee C-Refueling tlallc Scrall). Evct I Repon (LERI File (NUREG-D.regulatory Restri<<tiun 3gp -,Continuing 016 ),
E-operator Training & Lice>>sc Examination 5-potI d Reduction F-Adnunistrative G.dpcrational Error (Explain) 9-Otl er (Explai )
Exh bll I . Satire Source (I)/77) H 4tl ter (Explairi)
e AVERAGE DAILYUNIT POWER LEVEL COMPLETED BY V. T. Chilson TELEPHONE MONTH APRXL ~ 198 1 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL IMWe Net) (MWe.Net)
I 678 17 678 678 IS 678 675 674 678 20 669 678 2l 661 677 660 679 23 657.
'4 682 656 680 95 662 10 201 26 663 DST 520 666 12 674 2S 675 13 674 >9 676 674 30 672 15 675 16 675 NOTE; Average daily power level greater than 646 MWe due.to...cooler condenser cooling water.
INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting tn>>nth. C>>mpute to the nearest whole megawatt.
(o/77 l
OPERATING DATA REPORT DOCKET NO.
DATE ~~~81 TELEPHONE ~~i.'j7-3824 OPERATING STATUS Turke Point Unit No. Notes Unit No. 4 operated at
- l. Unit Name; 4
- 2. Reporting Period:
approximately 100% R.P. ex-
- 3. Licensed Thermal Power (MWt):
cept for outages of April 10, 760 and 11, 1981.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): ONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative 719.0 2 879.0 6'7 392.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 706.1 2 442.0 --- 49 454- 9--=-
166.6
- 13. Reactor Reserve Shutdown Hours >>0-'4.
Hours Generator Onk.ine 700.5 2 366.4 47 645.3
- 15. Unit Reserve Shutdown Hours 31.?
- 16. Gross Thermal Energy Generated (MWH) 1 531 694 5 134 832 99 516 187 17, Gross Electrical Energy Generated (MWH) 492 180 1 661 670 31 634 834
- 18. Net Electrical Energy Generated(MWH) 468 451 1 576 916 ... 29 960. 936
- 19. Unit Service Factor 97.4 82.2 70.7
=20. Unit Availability Factor 97.4 82.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Inspection Program - Jtr1y.Z1 - Au st 14 1981.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CRITICALITY INITIAl.ELECTRICITY COMMERCIAL OPERATION I'i/77)
VNITSl(UTDOWNS AND POWER REDUCTIONS REPORT MONTH APRIL 1981 r> Q Lice >>sec 0C<'nEJ Cause &. Collective No. Dale rs o < cd4 Event lO Action tu 0 Q C C Report ~ cn Prevent Recurrence
~ C/l 06 81-04-10 14.2. B 1 N/A IB ZZZZZZ Unit No. 4 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.
(Nuclear system) 07 81-04-11 4,3 MECFUN Unit was tripped by reactor protec-tion system caused by malfunction of the turbine auxiliary governor control system. (Non-nuclear system)
I F: Forced ! Reason: Method: Exhibi G - Ipstructions S: Scheduled < A-Equipment Failure (Explain) 8-Maintenance or Test I -pa>>Ital 2.Manila) Scram. ',
frPrpr o c a at'bn l, uf D ata Entry Sheets I'or Licensee
~
I
('-Refueling 3-Autytnatic Scratn. Event Report (LER) File(NUREG-D.Regulatory Restriction 4-QQ+r-(Exphin) Continuing Ol 6l )
- EQperator Training &, Lice>>sc Examination 5-'Load Reduction
~ F-Administrative er (Explain) 5
'-Operational Error (Explain) ibi) I Satne Source
~
('>/77) II-Other (Explai>>) I
AVERAGE DAlLY UNIT POWER LEVEL DATE COMPLETED BY son MONTH APRIL, 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe >Vet) (MWe-Net) 795 17 797 IS 794 794 20 794 21 160 794 22 755 794 787 795 24 791 794 25 789 I0 26 790 DST 794 27 789 2S 789 l3 '794 19 790 l4 793 30 789 IS 793 l6 449 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling water.
INSTRUCTIONS Qn this format. list the average daily unit p>>wer level in MWe Net for each day itt the reporting >nonth. C>>ntpute to the nearest whole megawat t.
(o/77)
OPERATING DATA REPORT ~
DOCKET NO.
DATE ~5~~81 T. Chilson COMPLETED BY V TELEPHONE QQQ.~824-OPERATING STATUS S t. Lucie Unit Ho . 1 Notes Unit operated at Unit Name r 8 approximately 100% R.P.
- 2. Reporting Period: April except for outage of
- 3. Licensed Thermal Power (MWt): 16-21, 1981.
- 4. Nameplate Rating (Gross MWe): 850
- 5. Design Electrical Rating (Net MWe): 802 5
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
IO. Reasons For Restrictions, lf Any: e ~
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 719.0 2 879.0 38 -207.0
- 12. Number Of Hours Reactor Was Critical 599.7 2 759 7 31'85-0
- 13. Reactor Reserve Shutdown Hours 129.5
- 14. Hours Generator On4ine 598.2 2 758.2 30 389.3
- 15. Unit Reserve Shutdown Hours 0 39.3
- 16. Gross Thermal Energy Generated (MWH) 1 517 646 7 010 391 74 258 539 l7. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 496 710 468 399 2 303 2 179 440 551 -
24 113 300
-=-22 707 037-
- 19. Unit Service Factor 83.2 95.8 79.5
- 20. Unit Availability Factor 83:2 95.8 79.6 4.4 ' 74.1
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Eachl:
Scheduled refuelin maintenance and ins ections - October 4 December 5 1981.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77)
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
fV rI A>>
C >> ~eo lych I Llcellscc III 4l Cause 8I. Corre<<t ive NII. Date A 0 n N ~>> ~
Event Action to Q
Report cn M 2 ~ Prevent Rciurrcn<<e
~ Iit Q 02 81-04-16 P 24.8 TRANSP Unit was manually tripped when arcing was observed on the B phase bushing on power transformer No. 1B.
Corrective actions included instal-ling new B phase bushing on power transformer Nos. 1A and lB and in-spection of both power transformers.
(Non-nuclear system)
S 96 zz zzzzzz Outage was extended to perform main-tenance on primary and secondary systems. "(Nuclear and Non-nuclear systems)
~
j
'I F: Forced Reason: h$ c hod: Exhtbtti G - Ipstruct tons S: Scheduled A.Equipment Failure (Explain) I.hlanual for Preparati(Itt of Data II Mahttenancc or Test 2-hlanual Scram. Entry Sheets Ior Licensee C-Refueling 3-AutIImatic Sera n. Evcitt Report (LER) File (NUREG-D-llegulatory Rest ri<<tion 4.
. .. ontinuing OI6l ) I F..Operator Training k. License Exatnination 5-"Lohd Reduc'tio n F-Adtninistrative 9 n) S
.G.Operational Error (Explain) txlubif I
- Sallle Sour<<<<
(It/77) ,Il.Other (EXplaitI) i
~ I ~ I, I
I
FLORIDA POWER & LIGHT COMPANY May 9, 1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the April, 1981', Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No.. 1.
Very truly yours, Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE POCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Ma 9, 1981 COMPLETED BY, V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH APRIL g 1981 Unit No. 3 remained out of service for scheduled refueling, maintenance, and inspections until April 21, 1981, when the stator core failed while preparing to synchronize generator after scheduled refueling was com-pleted. Refer to "Unit Shutdowns and Power Reductions" section of April, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed. during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
Completed installation'f 40 new fuel assemblies.
Completed performance o f Znt egrated Engineered Safeguards Surveillance Test.
0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 - 251 Turkey Point UNIT Unit No. 4 DATE Ma 1981 9
COMPLETED BY T. Chilson TELEPHONE 305 552-3824 REPORT MONTH APRIL 1981
'I Unit No. 4 operated at approximately 100% R.P except for outages of April 10, and ll, 1981. Refer to "Unit Shutdowns and Power Reductions" section of April, 1981, Operating Status Report for additional infor-,
mation.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power G Light Company commitments for NUREG-0578 implementation are continuing.
Refer to,'correspondence between FPL and NRC for additional information.
I 8g
SUMMARY
OF OPERATING EXPERIENCE POCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE Ma 9 1981 COMPLETED BY '. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH APRIL 1981 Unit operated at approximately 100% R.P. except for outage of April 16-21, 1981. Refer to "Unit Shutdowns and Power Reductions" section of April, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and recpxirements,of IE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Replaced pressurizer safety valve No. V-1200.