ML17264A442

From kanterella
Revision as of 12:48, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1996 for Re Ginna Nuclear Power Plant.W/960405 Ltr
ML17264A442
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1996
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604110077
Download: ML17264A442 (6)


Text

CATEGORY1REGUDRTOk

-INFORMATION DISTRIBUTION

%STEM(RIDE)E'l~DOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.

Rochester Gas&ElectricCorp.WIDAY,J.A.

Rochester GasaElectricCorp.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

MoratingreptforMar1996forGinaStation./9604051DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2;109(9/19/72).

'05000244 ERECIPIENT IDCODE/NAME PD1-1PDINTERNAL:

AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNALLITCOBRYCEiJHNRCPDRCOPIESLTTRENCL111111111RECIPIENT IDCODE/NAME JOHNSON,A LECTER.0RGNlNOACCOPIESLTTRENCL11111111DNNOTETOALL"R1DS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTElCONTACTTHEDOCUMENTCONTROLDESKIROOMOWPNSD-S(EXT, 415"2083)

TOELIMINATE YOURNAMEPROMDISTRIBUTION LISTSPORDOCUMENTS YOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:

LTTR9ENCL9 76RK/HATEROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 TELt'PHONC ARcAcooc710546.2700GINNASTATIONApril5,1996USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555

Subject:

MonthlyReportforMarch,1996Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244

DearSir:

PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofMarch,1996.Verytrulyyours,shA.WidalantManagerli.00"8JAW:tjnAttachments c:Mr.ThomasT.MartinNRC(1)Vwoea<0077 960SSXPDRADQCK05000244',

RPDR OPERATING DATAREPORTCOMPLETED BY:ri5199650-244JohnV.WaldenTELEPHO(716)7713588Notes1.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:March19963.LicensedThermalPower(MWI):15204.Nameplate Rating(GrossMWe):5175.DesignElectricRating(NetMWe):4706.MaximumDependabte Capacity(GrossMWe):4907.MaximumDependabte Capacity(NetMWe):4708.ItChangesOccurinCapadtyRating(ItemsNumber3Through7)SinceLastReport,GiveReason:9.PowerLeveltoWhichRestricted, IfAny(NetMWe:10.ReasonForRestrtctions, IfAn.ThisMonthYr.-to.Date Cumulative-11.HoursinReportedPeriod12.NumberofhoursReactorWasCritica13.ReactorReserveShutdovmHours14.HoursGenerator On-line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor(%)20.UnitAvailability Factor(%)21.UnitCapacityFactor(usingMDCNet)(%)22.UnitCapacityFactor(usingDERNet)(%)23.UnitForcedOutageRate(%)744.0662.50.0659.80.0947615.0322337.0306413.088.788.787.687.611.32184.02102.50.02099.80.03068799.0 1044176.0 992756.096.196.196.796.73.9230952.0185769.61687.6'82848.58.5259932107.0 86106676.0 81740568.0 79.279.276.476.45.524.Shutdovms Scheduled OverNext6Months(Type,DateandDurationofEach):RefuelinandMaintenance Start4/01/96Duration58da25.ItShutdownAtEndofReportPeriod,EstimateDateofStartup:26.UnitsinTestStatus(PriortoCommercial OperaVon):

ForcestAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVE TOTALCOMMENCING JANUARY1,1975**CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 G.~~'VERAGEDAILYUNITPOWERLEVELDOCKETNO:50-244UNIT:R.E.GinnaNuclearPowerPlantDATE:ril51996COMPLETED BY:JohnWaldenTELEPHONE:

76771-3588MONTHMarch1996DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)

DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 47717.47347718.4743.47719.4734~47620.4745.47721.4736~47622.7.36223.24'7525.10.26.47512.13.10042647227.28.29.47647547514~15.47347330.31.47647316.473INSTRUCTIONS Onthisformat,listtheaveragedailyunitpower.levelinMWe-Netforeachdayinreporting month.Computetothenearestwholemegawatt.

DOCKI:.TNO.UNllNAhfl:RE.CilNNANUCLEARPOWERPLANTUNITSHUTDOWNANDPOWERREDUCTIONS I)AIl'-CohfPLI'.1 I'.DBYohnV.WaldenREPORThfONTH+archql:LIIPIIO

.(716)771-3588rHo.Date00O~PlC000Pl0c00004rlC0CtLicenseeEventReportIIEw000VlQC0ul0CQDE0OCauseLCorrective ActiontoPreventRecurrence 3-7-9684.296-002KE"B"Condenser Circulating WaterumptripoedcausingaSecondary systemtransient.

TheReactorwasmanuallyscramedduetoTurbineOperatinLimitsbeingexceeded.

SeeLER96-002formoredetails.lF:ForcedS:Scheduled Rtv.4/8549492Reason:A-Equipment Failure(Explain)

I3-hfaintenancc orTestC-Refueling D-Regulatory Restriction E-Operator TrainingBcLiccnscExamination F-Administrative G-Operational Error(Explain)

II-Other(Explain) 3hfcthod:I-hfanual 2-hfanual Scram.3-Automatic Scram.4-Other{Explain)

ExhibitG-Instructions forPreparation ofDataEntrySheetsforLiccnsccEventRcport(LER)File(NUREG-0161)ExhibitI-SameSource NARRATIVE SUMMARYOPOPERATING EXPERIENCE DOCKETNO:50-244UNIT:R.E.QinnaNuclearPowerPlantDATE:A'l519COMPLETED BY:JohnWaldenTELEPHONE:

7161-3588MONTHMarch1996AforcedoutageoccurredonMarch7,1996duetothetripofthe"B"Condenser Circulating WaterPump.Amanualreactorscramwasinitiated topreventpotential damagetothemainturbine(seeLER96-002).Theunitwasplacedon-lineonMarch11,1996andranatfullpowerfortheremainder ofthemonth.Theaveragepowerforthemonthexcluding theforcedoutagewas96%