ML17265A429

From kanterella
Revision as of 12:36, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr
ML17265A429
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1998
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9810190325
Download: ML17265A429 (8)


Text

CATEGORY1REGULA'IRYINFORMATIONDISTRIBUTION SYSTEM(RIDS)ACCESSION NBR,:9810190325 DOC.DATE:

98/09/30NOTARIZED:

NODOCKETIFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WALDEN;J.p.'ochester Gas&ElectricCorp.WIDAY,J.A.

Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

~

SUBJECT:

Monthlyoperating reptforSept1998forREGinnaNuclearPowerPlant.With981009ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

E05000244RECIPIENT IDCODE/NAME PD1-1PDCOPIESRECIPIENT LTTRENCL-.IDCODE/NAME 11VISSING,G.

COPIESLTTRENCL11INTERNAL:

AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:

LITCOBRYCE,JHNRCPDR11111111RGN1NOAC111111DNNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR9ENCL9 0~S

~~ROCHESTER GASANDELECTRICCORPORATION 89EASTAVENIJE, ROCHESTER, N.Y.14649-000'REA CODE716-546-2700 October9,1998USNuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProject,Directorate I-1Washington, DC20555

Subject:

MonthlyReportforSeptember, 1998Operating StatusInformation R.E:GinnaNuclearPowerPlantDocketNo.50-244

DearMr.Vissing:

PursuanttoGinnaImprovedTechnical Specifications Section5.6.4,attachedisthemonthlyoperating statusreportforGinnaStationforthemonthofSeptember, 1998.xc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14B2)ProjectDirectorate l-1Washington, D.C.20555.Verytrulyyours,Q..dsehA.WidayPlantManagerU.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector Attachments 98i0190325 980930PDRADOCK05000244RPDR

~~T OPERPlNGDATAREPORTCOMPLETED BY:50-244October9,1998f.UJohnV.WaldenTELEPHONE (716)771-3588OPERATING STATUS4801.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:Setember,19983.DesignElectricRating(NetMWe):4704.MaximumDependable Capacity(NetMWe):Notes:ThisMonthYr.-to-Date Cumulative**

5.NumberofhoursReactorWasCritical6.HoursGenerator On-line7.UnitReserveShutdownHours8.NetElectrical EnergyGenerated (MWH)720.0720.00.0345907.06551.06551.00.03219003.0 204510.2201489.78.5*90760519.4

    • CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 7CFQJl DOCKETNO:50-244UNITNAME:R.E.GINNANUCLEARPOWERPLANTDATE:October91998COMPLETED BY:JohnV.WaldenUNITSHUTDOWNREPORTING PERIOD:Setember1998(Month/Year)

NO.DATETYPEF:FORCEDS:SCHEDULED DURATION(HOURS)REASON"'ETHOD OFSHUTTINGDOWN'"CAUSE/CORRECTIVE ACTIONSCOMMENTSSUMMARY:Apowerreduction occurredonSeptember 5,1998at2120.Powerwasreducedto45%foroff-sitecircuitrepairsandturbinecontrolmaintenance.

Fullpoweroperation resumedonSeptember 6,1998at1410.Theunitoperatedatfullpowerfortheremainder ofthemonthofSeptember.

(1)Reason(2)MethodA-Equipment Failure(Explain)

B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining/License Examination F-Administrative G-Operational Error(Explain)

H-Other(Explain) 1-Manual2-ManualTrip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other(Explain) 0