ML12229A139

From kanterella
Revision as of 15:00, 30 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Davis-Besse, Unit 1, License Renewal Application Amendment 30 - Annual Update
ML12229A139
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/09/2012
From: Allen B S
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-12-262, TAC ME4640
Download: ML12229A139 (15)


Text

FENOCFirstEnergy Nuclear Operating Company5501 North State Route 2Oak Harbor. Ohio 43449Barry S. AllenVice President -Nuclear419-321-7676Fax: 419-321-7582August 9, 2012L-1 2-26210 CFR 54ATTN: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001SUBJECT:Davis-Besse Nuclear Power Station, Unit No. 1Docket No. 50-346, License Number NPF-3License Renewal Application Amendment No. 30 -Annual Update (TAC No. ME4640)By letter dated August 27, 2010 (Agencywide Documents Access and ManagementSystem (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear OperatingCompany (FENOC) submitted an application pursuant to Title 10 of the Code of FederalRegulations, Part 54 for renewal of Operating License NPF-3 for the Davis-BesseNuclear Power Station, Unit No. 1 (Davis-Besse). Each year following submittal of alicense renewal application (LRA) and at least 3 months before scheduled completion ofthe NRC review, 10 CFR 54.21(b) requires an amendment to the renewal application tobe submitted identifying any change to the current licensing basis (CLB) of the facilitythat materially affects the contents of the license renewal application, including the FinalSafety Analysis Report (FSAR) supplement.The Attachment provides a summary of the CLB changes that materially affect the LRA.Enclosure A provides Amendment No. 30 (Annual Update) to the DBNPS LRA as requiredby 10 CFR 54.21(b). Enclosure B provides new and revised LRA boundary drawings.There are no regulatory commitments contained in this letter. If there are any questionsor if additional information is required, please contact Mr. Clifford I. Custer, FleetLicense Renewal Project Manager, at 724-682-7139.I declare under penalty of perjury that the foregoing is true and correct. Executed onAugust __, 2012.Sincerely,Barry S. Allený' / ()5K19 XF--F-Davis-Besse Nuclear Power Station, Unit No. 1L-12-262Page 2Attachment:Current Licensing Basis (CLB) Changes that Materially Affect the Davis-BesseNuclear Power Station, Unit No. 1 (Davis-Besse), License Renewal Application (LRA)Enclosures:A. Amendment No. 30 (Annual Update) to the Davis-Besse License Renewal ApplicationB. New and Revised Davis-Besse License Renewal Application Boundary Drawingscc: NRC DLR Project ManagerNRC Region III Administratorcc: w/o Attachment or EnclosuresNRC DLR DirectorNRR DORL Project ManagerNRC Resident InspectorUtility Radiological Safety Board

Attachment

L-12-262Current Licensing Basis (CLB) Changes that Materially Affect theDavis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse),License Renewal Application (LRA),Page 1 of 1A review of Davis-Besse CLB document changes since submittal of the 2011License Renewal Application Annual Update provided by FENOC letter datedSeptember 30, 2011 (ML1 1276A078), identified two design changes that materiallyaffect the contents of the Davis-Besse License Renewal Application, as follows:1 .The Chemical Addition System was modified in March of 2012 to install a zincinjection skid. The components of the zinc injection skid satisfy the scoping criteriaof 10 CFR 54.4(a)(2), and are highlighted on new license renewal boundarydrawing LR-M045, Sheet 1. The aging management review results for the zincinjection skid are included in LRA Table 3.3.2-5, "Aging Management ReviewResults -Chemical Addition System."LRA Section 2.3.3.5, "Chemical Addition System," Table 2.3.3-5, "ChemicalAddition System Components Subject to Aging Management Review," Section3.3.2.1.5, "Chemical Addition System," and Table 3.3.2-5, "Aging ManagementReview Results -Chemical Addition System," are revised to account for theaddition of the zinc injection skid. New license renewal boundary drawingLR-M045, Sheet 1 is added to depict the evaluation boundary of the zinc injectionskid. Plant modifications associated with the addition of the zinc injection skid alsoresulted in changes to license renewal boundary drawings LR-MO10D Sheet 1,LR-M031A, LR-M037D and LR-M045.2. An articulating boom crane, known as the Containment Auxiliary Crane, wasinstalled as permanent plant equipment during the Cycle 17 refueling outage thatended on June 13, 2012. This crane is capable of handling heavy loads, andtherefore is subject to the requirements set forth in NUREG-0612, "Control ofLifting and Handling of Heavy Loads." The license renewal "Cranes and HoistsInspection Program" is credited with managing the aging effects applicable to thecrane structural components.LRA Sections A. 1.10 and B.2.10, both titled "Cranes and Hoists InspectionProgram," and Section A. 1.44, "References," are revised to include reference toAmerican National Standards Institute (ANSI) B30.22, "Articulating Boom Cranes."See Enclosure A to this letter for the revision to the Davis-Besse LRA.See Enclosure B to this letter for the new and revised LRA Boundary Drawings.

Enclosure

ADavis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse)Letter L-1 2-262Amendment No. 30 (Annual Update) to theDavis-Besse License Renewal ApplicationPage 1 of 10License Renewal ApplicationSections AffectedSection 2.3.3.5Table 2.3.3-5Section 3.3.2.1.5Table 3.3.2-5Section A. 1.10Section A. 1.44Section B.2.10The Enclosure identifies the change to the License Renewal Application (LRA) byAffected LRA Section, LRA Page No., and Affected Paragraph and Sentence. Thecount for the affected paragraph, sentence, bullet, etc. starts at the beginning of theaffected Section or at the top of the affected page, as appropriate. Below each sectionthe reason for the change is identified, and the sentence affected is printed in italics withdeleted text fined-e and added text underlined.

Enclosure

AL-12-262Page 2 of 10Affected LRA Section LRA Page No. Affected Paragraph and Sentence2.3.3.5 Pages 2.3-62 Description, 2nd paragraph and newand 2.3-63 5th paragraph;License Renewal Drawings, newdrawing; and,Components Subject to AMR,3rd paragraph, bulleted itemBased on the installation of the new Zinc Injection System, the 2nd paragraph isrevised and a new 5th paragraph is added to the "Description" of LRA Section2.3.3.5, "Chemical Addition System." Additionally, a new license renewalboundary drawing number is added to the list of "License Renewal Drawings,"and the bulleted item under the 3rd paragraph of "Components Subject to AMR,"is revised. LRA Section 2.3.3.5 is revised to read as follows:2nd Paragraph revision:The Chemical Addition System provides a boric acid solution to the Boric AcidAddition System, and provides lithium hydroxide, hydrazine, ammonia, and otherchemical amines to control pH and oxygen in the plant systems fed by theReactor Coolant Chemical Addition System and Steam Generator Wet LayupChemical Addition System. In addition, the Chemical Addition System injects zincacetate into the RCS to reduce the radiation source term and for mitigation ofprimary water stress corrosion cracking (PWSCC) of Alloy 600 components.New 5th Paragraph:Zinc acetate is mixed into the Zinc Iniection Mix Tank (DB-T99) with a mixer.Demineralized water is supplied from the Demineralized Water System. Thesolution is transferred from the Zinc Injection Mix Tank by one of two ZincInjection Pumps (DB-P295-1 and DB-P295-2) that are capable of independentoperation. The Chemical Addition System injects zinc acetate into the RCS toreduce the radiation source term and for mitigation of primary water stresscorrosion crackina (PWSCC) of Alloy 600 components

Enclosure

AL-12-262Page 3 of 10License Renewal DrawingsThe following license renewal drawings depict the evaluation boundaries for thesystem components within the scope of license renewal:LR-M035, LR-M037D, LR-M039A, LR-M039B, LR-M045, LR-M045 Sheet IComponents Subject to AMRIn addition to those components specifically excluded in 10 CFR 54.21(a)(1)(i),such as instruments, the following components are within the scope of licenserenewal but are not subject to AMR:The internals (screens) for the lithium hydroxide mix tank dischargestrainer (DB-S334), the and-hydrazine pump suction strainer (DB-S335).the zinc iniection pumps suction strainer (DB-S463) and the zinc injectionpumps discharge strainer (DB-S464) are not subject to AMR becausethese strainers are in scope only for potential leakage and sprayconsiderations in accordance with 10 CFR 54.4(a) (2), and serve only astructural integrity function.

Enclosure

AL-12-262Page 4 of 10Affected LRA SectionLRA Page No.Page 2.3-64Affected Paragraph and SentenceTable 2.3.3-53 new rowsBased on the installation of the new Zinc Injection System, LRA Table 2.3.3-5,"Chemical Addition System Components Subject to Aging Management Review,"is revised to include 3 new rows, to read as follows:Component Type Intended FunctionST(as defined in Table 2.0-1)Pump Casinq -Zinc iniection pumps Structural integrity(DB-P295-1 & 2)Sight glass Structural integrityTank -Zinc iniection mix tank (DB-T99) Structural integrity

Enclosure

AL-12-262Page 5 of 10Affected LRA SectionLRA Page No.Affected Paragraph and Sentence"Materials" subsection, new material;3.3.2.1.5Page 3.3-9Based on the installation of the new Zinc Injection System, the "Materials"subsection of Section 3.3.2.1.5, "Chemical Addition System," is revised to readas follows:MaterialsThe materials of construction for subject mechanical components of theChemical Addition System are:0 Glass0 Stainless steel

Enclosure

AL-12-262Page 6 of 10Affected LRA SectionLRA Page No.Page 3.3-230Affected Paragraph and SentenceTable 3.3.2-512 New RowsBased on the installation of the new Zinc Injection System, LRA Table 3.3.2-5, "Aging Management ReviewResults -Chemical Addition System," is revised to include 12 new rows as follows:Table 3.3.2-5 Aging Management Review Results -Chemical Addition SystemdAging Effect NUREG-Row Component Intended Material Environment Requiring Aging Management 1801, Table NotesNo. Type Function(s) Management Program Volume 2 ItemItemPump Casing Air with-Zinc Air w athIniection Structural Stainless borated water None None VII.J-16 3.3.1-99 APump (DB- integritx Steel leakal)geP295-1 & 2) (External)Pump Casing-inc Structural Stainless Air-indoorInjection Structu Stanle uncontrolled None None VII.J-15 3.3.1-94 APump (DB- i Steel (External)P295-1 & 2)Pump Casing-ZincInjection Structural Stainless Treated water Loss ofPump (DB- integrity Steel (Internal) material One-Time Insection VII.E3-15 3.3.1-24 AP295-1 & 2)

Enclosure

AL-12-262Page 7 of 10Table 3.3.2-5 Aging Management Review Results -Chemical Addition SystemdAging Effect NUREG-Row Component Intended Material Environment Requiring Aging Management 1801, Table 1 NotesNo. Type Function(s) Management Program Volume 2 ItemItemPump Casing-Zinc Structural Stainless Treated water Loss of PWR Water-- Injection VIIE315 3.31-4_Pump (DB- integrit Steel (Internal) material Chemistry V. E3-15 3.3.1-24 AP295-1 & 2)Sight qlass Structural Glass Moist air None None VII.J-13 3.3.1-93 Aintegrit (Internal)-Sight glass Structural Glass Treated water None None VIIJ-13 3.3.1-93 Ainte.grity (Internal)Air with-Sight glass Structural Glass borated water None None N/A N/A Gintegrity leakage _N/ NA_(External)Structural Air-indoorSight glass Glass uncontrolled None None VII.J-8 3.3.1-93 Ai(External)

Enclosure

AL-12-262Page 8 of 10Table 3.3.2-5 Aging Management Review Results -Chemical Addition SystemAging Effect NUREG-Row Component Intended Material Environment Requiring Aging Management 1801, Table 1 NotesNo. Type Function(s) Management Program Volume 2 ItemItemTank -ZincInjection Mix Structural Stainless Treated water Loss ofTank integrity Steel (Internal) material(DB- T99)Tank- ZincIniection Mix Structural Stainless Treated water Loss of PWR Water V11.E3-15 3.3.1-24 CTank integrty Steel (Internal) material Chemistry(DB-T99)Tank -Zinc Air withIniection Mix Structural Stainless borated water None None VIIJ-16 3.3.1-99 CTank integrity Steel leakage(DB-T99) (External)Tank -Zinc Air-indoorIniection Structural Stainless uncontrolled None None VII. J- 15 3.3.1-94 CTank integrity Steel (External)(DB-T99)

Enclosure

AL-12-262Page 9 of 10Affected LRA SectionLRA Page No.Affected Paragraph and SentenceA.1.10Page A-122nd ParagraphBased on the installation of the new Containment Auxiliary Crane, the 2ndparagraph of LRA Section A.1.10, "Cranes and Hoists Inspection Program,"previously revised by FENOC letter dated May 24, 2011 (ML1 1 151A090), isrevised to read as follows:The Cranes and Hoists Inspection Program is based on guidance contained inANSI B30.2 [Reference A. 1-5] for overhead and gantry cranes, ANSI B30. 11[Reference A. 1-6] for monorail systems and underhung cranes, ad-ANSI B30.16[Reference A. 1-7] for overhead hoists and ANSI B30.22 for articulating boomcranes [Reference A. 1-221. The program includes a review of the number andmagnitude of lifts made by a crane, monorail or hoist.Affected LRA SectionLRA Page No.Affected Paragraph and SentenceA.1.44Page A-27New reference listingBased on the installation of the new Containment Auxiliary Crane, a newreference listing is added to LRA Section A. 1.44, "References," previouslyrenumbered from A.1.43 to A.1.44 by FENOC letter dated April 5, 2012(ML12097A520), and the section is revised to read as follows:A.1.44 REFERENCESA. 1-22 ANSI B30.22, "Articulatinq Boom Cranes," 2010

Enclosure

AL- 12-262Page 10 of 10Affected LRA Section LRA Page No. Affected Paragraph and SentenceB.2.10 Page B-52 Description, 2nd ParagraphBased on the installation of the new Containment Auxiliary Crane, the2nd paragraph of LRA Section B.2.10, "Cranes and Hoists Inspection Program,"previously revised by FENOC letter dated May 24, 2011 (ML1 1 151A090), isrevised to read as follows:The Cranes and Hoists Inspection Program is a condition monitoring programthat is based on guidance contained in American National Standards Institute(ANSI) B30.2 for overhead and gantry cranes, ANSI B30. 11 for monorail systemsand underhung cranes, and-ANSI B30.16 for overhead hoists and ANSI B30.22for articulating boom cranes. The inspections monitor structural members forsigns of corrosion and wear and bolted connections for loose bolts and missingor loose nuts. The inspections are performed periodically for installed cranes andhoists. The program includes a review of the number and magnitude of lifts madeby a crane, monorail or hoist.

Enclosure

BDavis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse)Letter L-12-262New and Revised Davis-Besse License Renewal Application Boundary Drawings5 pages followThe following License Renewal Application Boundary Drawingis new and is enclosed:LR Drawing LR-M045 Sheet I Revision 0The following License Renewal Application Boundary Drawingsare revised and are enclosed:LR Drawing LR-MOIOD Sheet I Revision 4LR Drawing LR-M031A Revision 3LR Drawing LR-M037D Revision 5LR Drawing LR-M045 Revision 3 THE FOLLOWING 5DRAWINGSSPECIFICALLYREFERENCEDENCLOSURE BDAVIS-BESSE NUCLEARSTATION,UNIT NO. 1DOI TO D05X