L-23-131, Readiness for Resumption of NRC Supplemental Inspection

From kanterella
Jump to navigation Jump to search
Readiness for Resumption of NRC Supplemental Inspection
ML23166A057
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/12/2023
From: Tony Brown
Energy Harbor Nuclear Corp
To: Jack Giessner
NRC/RGN-III
Shared Package
ML23166A094 List:
References
L-23-131
Download: ML23166A057 (1)


Text

111Ja energy

~

harbor Terry J. Brown.

Site Vice President, Davis-Besse Nuclear Davis-Besse Nuclear Powe,: Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 419-321-7676 SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 May 12, 2023 L-23-131 Mr. John Giessner Regional Administrator, Region Ill United States Nuclear Regulatory Commission 2443 Warrenville. Road, Suite 21 o Lisle, ll 60532--4352

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Readiness for Resumption of NRC Sups;,lemental Inspection In Letter EA-21-105 dated October 6, 202~ (reference NRC Supplemental lr,spection Interim Report No. 05000346/2022440), the NRC suspended the supplemental inspection being performed in accordance with Inspection* Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area" on Au~ust 25, 2022 at the Davis-Besse Nuclear Power Station (DBNPS).

The Energy Harbor Nuclear Corporation (Energy Harbor) has completed the actions delineated in the October 6, 2022 letter, and is ready to resume the supplemental.

inspection. These actions are detailed in the attachmentto this letter. Because the

  • attachment contains Security-Related Information, it is to be withheld from public disclosure pursuant to 10 CFR 2.390. When separated from the attachment, this cover letter may be. decontrolled. *..

There are no regulatory commitments contained in this letter. If there are any questions

  • or if additional information is required, please contact Mr. Robert W. Oesterle, Manager,

. Site Regulatory Compliance and Emergency Response, at (419) 321-'7462.:

GMW SECURITY-RELATED IN.FORMATION - WITHHOLD UNDER 10 CFR 2.390

Davis-Besse Nuclear Power Station, Unit 1 L-23-131 Page 2 of 2

Attachment:

Description of Completed Actions cc: NRC Document Control Desk NRC Senior Resident Inspector NRR Project Manager (w/o Attachment)

Utility Radiological Safety Board (w/o Attachment)