SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION-INTEGRATED INSPECTION REPORT 05000346/2023002

Dear Terry Brown:

On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station. On July 25, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Karla K. Stoedter, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2023002

Enterprise Identifier:

I2023002-0052

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

April 01, 2023 to June 30, 2023

Inspectors:

K. Barclay, Senior Reactor Inspector

T. Briley, Senior Project Engineer

R. Cassara, Acting Senior Resident Inspector

R. Elliott, Senior Project Engineer

D. Mills, Technical Assistant

R. Ng, Senior Project Engineer

Approved By:

Karla K. Stoedter, Chief

Reactor Projects Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000346/202105006 Potential Adverse Changes During 2006 Emergency Diesel Generator Modifications 71111.21M Discussed

PLANT STATUS

The unit began the inspection period at rated thermal power. On May 31, 2023, the unit was down powered to 95 percent to perform control rod drive and turbine valve testing. The unit was returned to rated thermal power on June 1, 2023, and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for mayfly seasonal preparations for the following systems:

service water system

emergency diesel generator (EDG)

control room emergency ventilation system

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Emergency ventilation system train 2 while train 1 was inoperable during the week ending May 27, 2023
(2) Auxiliary feedwater train 2 during surveillance on train 1 during the week ending June 17, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the decay heat system during the week ending June 30, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Emergency core cooling system pump room 11, room 105, fire area AB01, during the week ending May 27, 2023
(2) Station blackout diesel generator and associated electrical equipment and fuel oil storage tank rooms during the week ending May 27, 2023
(3) Radwaste exhaust equipment and main station exhaust fan room, radwaste and fuel handling areas air supply equipment area, purge exhaust equipment room, rooms 501 and 501DC, 500, and 515, fire area EE, during the week ending May 27, 2023
(4) Main feedwater pump room, room 252, fire area II, during maintenance on auxiliary feed train 1 with motor driven feed pump protected during the week ending June 17, 2023
(5) Makeup pump room and vestibule, room 225 and 226A, fire area AB during the week ending June 30, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on May 6, 2023

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the: emergency feedwater facility and manhole 3005 inspection during the week ending May 27, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during an observation during power reduction and feedwater loop demands in hand for delta cold leg temperature integrated controller system module replacement during the week ending April 29, 2023
(2) The inspectors observed and evaluated licensed operator performance in the control room during power reduction, control rod drive testing, and turbine stop valve testing during the week ending June 3, 2023

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Structural integrity of watertight door used to maintain operability of service water system during the week ending April 29, 2023
(2) Station vent normal radiation monitor train 2 pump and pressure transmitter replacement during the week ending May 6, 2023
(3) Diesel fire pump scheduled maintenance outage during the week ending June 24, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Weekly elevated risk during multiple planned half trip conditions during the week ending April 15, 2023
(2) Risk assessment for station air compressor 2 outage during the week ending May 13, 2023
(3) Anticipatory reactor trip system channel 4 isolation card not locked in properly during the week ending May 20, 2023
(4) Safety features actuation system (SFAS) channel 2 issue during the week ending May 27, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Radiation element RE 4596BA low flow sample test failure operability determination during the week ending May 6, 2023
(2) SFAS channel 2 power supply failure, CR 202304281 during the week ending May 27, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (9 Samples)

(1) Motor driven feed pump lube oil cooler during the week ending April 15, 2023
(2) Station air compressor 2 after scheduled maintenance during the week ending May 13, 2023
(3) Control room emergency ventilation system after scheduled maintenance during the week ending May 20, 2023
(4) SFAS channel 2 after power supply replacement during the week ending May 27, 2023
(5) Boric acid flow transmitter after replacement during the week ending May 27, 2023
(6) Station blackout diesel generator after scheduled maintenance during the week ending June 17, 2023
(7) Steam feed rupture control system channel 2 after replacing signal monitor during the week ending June 24, 2023
(8) EDG 1 after scheduled maintenance during the week ending June 24, 2023
(9) Diesel fire pump following scheduled maintenance during the week ending June 30, 2023

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) Steam and feedwater rupture control system steam generator level input channel functional test and device calibration, April 10, 2023
(2) EDG 1 monthly test during the week ending April 29, 2023
(3) Auxiliary feedwater train 2 quarterly test during the week ending May 6, 2023
(4) Station blackout diesel generator monthly tests during the week ending June 17, 2023

Inservice Testing (IST) (IP Section 03.01) (2 Samples)

(1) Motor driven feed pump quarterly test during the week ending April 15, 2023
(2) Containment isolation valve 2001 clean and inspect and inservice testing during the week ending May 20, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) Quarterly functional test of turbo-marine diesel FLEX generators during the week ending May 13,

INSPECTION RESULTS

URI (Discussed)

Potential Adverse Changes During 2006 Emergency Diesel Generator Modifications URI 05000346/202105006 71111.21M

Description:

The NRC continues to evaluate an unresolved item documented in inspection report 202105006 (ADAMS Accession Number ML21348A767). Generally, the staff is assessing the adequacy of the sites modification associated with the installation of the EDG field flash selector switches.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 25, 2023, the inspectors presented the integrated inspection results to T. Brown, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

DBOP06913

Seasonal Plant Preparation Checklist

Drawings

OS0004

Decay Heat Removal/ Low-Pressure Injection System

DBOP06012

Decay Heat and Low-Pressure Injection System Operating

Procedure

DBOP06233

Auxiliary Feedwater System

DBOP06504

Emergency Ventilation System

71111.04

Procedures

DBSP03162

Auxiliary Feedwater Train 2 Monthly Valve Verification

PFP-AB105

ECCS Pump Room 101, Rooms 105, Fire Area AB01

PFP-AB225

Makeup Pump Room and Vestibule Room 225 and 226A Fire

Area AB

PFP-AB500

Radwaste and Fuel Handling Areas Air Supply Equipment

Area - Room 500, Fire Area EE

PFP-AB501

Radwaste Exhaust Equipment and Main Station Exhaust Fan

Room - Room 501 and 501DC, Fire Area EE

PFP-AB515

Purge Exhaust Equipment Room - Room 515, Fire Area EE

PFP-S60000

Service Building 6, Laydown Area, Station Blackout Diesel

Fire Plans

PFP-TB252

Main Feedwater Pump Room (West Condenser Pit) Room 252

Fire Area II

71111.05

Procedures

NGDB00302

DBNPS Fire Protection Program

201810082

Emergency Feedwater Building Leak

11/12/2018

71111.06

Corrective Action

Documents

2200870

Water Leak from Emergency Feedwater Ductwork

2/05/2022

Corrective Action

Documents

2303533

Course RCS Tave Control with FW Demand in Manual

Miscellaneous

System Status

DBOP6902 - Small Power Reduction to Support Controller

Work

04/25/2023

200856520

Main Turbine Stop Valves Periodic Test

05/31/2023

200856520

Main Turbine Stop Valves Periodic Test

05/31/2023

200856521

Main Turbine Control Valve

05/31/2023

200856522

Main Turbine CIV Test

05/31/2023

71111.11Q

Work Orders

200901017

CRD Exercise Test

05/31/2023

71111.12

Procedures

DBMI03417

Channel Calibration of RE4598BA Station Vent Normal Range

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Radiation Monitor Channel 2

200730894

Doors and Hatches, Top and Bottom Latches are Worn

04/22/2023

200848410

PM 1378 1 Year Inspection Diesel Fire Pump 11

04/27/2023

Work Orders

200913869

Station Vent Radiation Monitoring

05/04/2023

Miscellaneous

83C-ISLSP9AB

String Work Package Cover Sheet

2, 23, 24

Procedures

DBMI03246

Channel Functional Test and Device Calibration of SFRCS

Steam Generator Level Inputs 83C-ISLSP9A8, A9, B6 and B7

to Actuation Channel 2

200848840

SFRCS ACH 2 SG Level Functional Test

04/10/2023

200914582

ARTS Channel 4 Isolation Card in C5784D

05/12/2023

71111.13

Work Orders

200915830

Unexpected Computer Alarms for SFAS Chanel 2 Q932,

Q852, Q952, Q916, Q904, Q912, Q908, Q956, Q936, Q924

05/23/2023

2303683

RIC4598BAC Operate LED Failed to Extinguish During Low

Flow Test

Corrective Action

Documents

2304281

SFAS Channel 2 Output Modules Tripped

05/22/2023

E16 SH. 2

SFAS Signal Diagram

Drawings

E6 SH. 1

SFAS Logic Diagram

Miscellaneous

NOP-ER3001

Simple Troubleshooting Plan

71111.15

Procedures

DBOP06405

SFAS Procedure

71111.21M

Engineering

Changes

ECR 050095-00

EDG Loading Improvements

Drawings

M0060

Auxiliary Feedwater System

83C-ISLSP989

String Work Package

2/22/2021

83C-ISLSP9A6

String Work Package

2/22/2021

83C-ISLSP9A7

String Work Package

2/22/2021

83C-ISLSP9B8

String Work Package

2/22/2021

Miscellaneous

LYSP9A7

Steam Generator 2 Startup Level Signal Monitor

DBMI03245

Channel Functional Test and Device Calibration of SFRCS

Steam Generator Level Inputs 83C-ISLSP9A6, A7, B8 and B9

to Actuation Channel 1

Procedures

DBSS03091

Motor Driven Feed Pump Quarterly Test

200669088

Replace SAIC Signal Monitors

05/22/2023

71111.24

Work Orders

200713508

PM 0747 MV2001 RPS/SFAS Channel 2

05/15/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

200731257

PM 11824 SAC2 8000 Hour Maintenance

05/26/2023

200757790

PM 11743 SAC2 4000 Hour Maintenance

05/26/2023

200844093

MDFP Lube Oil Cooler Lean and Inspect MDFP Coolers

04/11/2023

200844588

FLEX Diesel Run

05/12/2023

200845278

Motor Driven Feed Pump Motor Testing

04/11/2023

200847222

Lube Oil Sample, Diesel Fire Pump Test

04/12/2023

200848410

Diesel Fire Pump

04/27/2023

200848816

SBODG Monthly Test

04/15/2023

200848870

Motor Driven Feed Pump Quarterly Test

04/11/2023

200850881

HVAC Control Room

05/15/2023

200851366

EDG Monthly Test

04/27/2023

200851371

RE4598BA Functional Test

05/04/2023

200851426

AFP 2 Quarterly Test

05/02/2023

200852327

CTRM EVS Train 1

05/15/2023

200856879

SBODG Monthly Test

06/05/2023

200857600

SFRCS ACH 1 SG level Functional Test

06/20/2023

200900547

Makeup and Letdown System

05/24/2023

200915631

Remove Insulation and Heat Trace from FTMU39A

05/23/2023

200915830

SFAS Channel 2

05/23/2023

200918226

EDG 1 184 Day Test