IR 05000346/2023403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000346/2023403
ML23306A130
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/02/2023
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Tony Brown
Energy Harbor Nuclear Corp
References
IR 2023403
Download: ML23306A130 (1)


Text

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000346/2023403

Dear Terry Brown:

On September 28, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with Jim Pry, Site Performance Improvement Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2023403

Enterprise Identifier:

I-2023-403-0028

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

August 28, 2023 to September 28, 2023

Inspectors:

N. Egan, Sr. Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a, d; 02.07 a; 02.08 d-h
  • Tier III: 02.10 a

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) September 1, 2022 through July 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 28, 2023, the inspectors presented the security baseline inspection results to Jim Pry, Site Performance Improvement Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DBBP-LP-1202

Owner Controlled Area Access Control

DBBP-LP-1207

Material Search at Security Warehouse

NOP-LP-1102

Protection of Safeguards Information

NOP-LP-1104

Security-Related Access Control Devices

NOP-LP-1202

Vehicle and Material Access Control

NOP-LP-1203

Security Badge Control

NOP-LP-1204

Primary Access Facility Controls

Procedures

NOP-LP-1205

Visitor Control to Protected and Vital Areas

71130.02

Self-Assessments

ATA-2023-10148

Analysis of Access Control Program - 71130.02

08/22/2023

71151

Miscellaneous

Select Performance Indicator Data from September 1, 2022

through July 31, 2023

00