MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 IR 05000346/20234022023-12-19019 December 2023 Cyber Security Inspection Report 05000346/2023402 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000346/20220062023-03-0101 March 2023 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2022006) IR 05000346/20220912023-02-10010 February 2023 NRC Inspection Report 05000346/2022091 and Apparent Violation IR 05000346/20220042023-02-0909 February 2023 Integrated Inspection Report 05000346/2022004 and 07200014/2022001 IR 05000346/20224042023-02-0808 February 2023 Material Control and Accounting Program Inspection Report 05000346/2022404 IR 05000346/20224032023-01-23023 January 2023 Security Baseline Inspection Report 05000346/2022403 IR 05000346/20220112023-01-0505 January 2023 Triennial Fire Protection Inspection Report 05000346/2022011 IR 05000346/20220032022-11-10010 November 2022 Integrated Inspection Report 05000346/2022003 IR 05000346/20220402022-11-10010 November 2022 95001 Supplemental Inspection Report 05000346/2022040 and Follow-Up Assessment Letter IR 05000346/20220102022-11-0202 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000346/2022010 IR 05000346/20224402022-10-0404 October 2022 NRC Supplemental Inspection (95001) Interim Report 05000346/2022440 IR 05000346/20220052022-08-25025 August 2022 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2022005) IR 05000346/20220022022-08-11011 August 2022 Integrated Inspection Report 05000346/2022002 ML22208A0652022-07-27027 July 2022 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 IR 05000346/20220122022-06-30030 June 2022 Phase III 71003 License Renewal Report 05000346/2022012 IR 05000346/20224012022-05-17017 May 2022 Security Baseline Inspection Report 05000346/2022401 IR 05000346/20220012022-05-12012 May 2022 Integrated Inspection Report 05000346/2022001 IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 IR 05000346/20210062022-03-0202 March 2022 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2021006) IR 05000346/20210922022-03-0101 March 2022 EA-21-155 Davis Besse - Final Significance Determination of White Finding, Notice of Violation and Assessment Follow Up Letter, NRC Inspection Report 50000346/2021092 IR 05000346/20210042022-02-0909 February 2022 Integrated Inspection Report 05000346/2021004 and Exercise of Enforcement Discretion ML22032A3142022-02-0101 February 2022 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000346/2022010 IR 05000346/20210122022-01-31031 January 2022 Temporary Instruction 2515/194 Inspection Report 05000346/2021012 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding ML21340A2212021-12-0909 December 2021 NRC Inspection Report (05000346/2021090) Preliminary White Finding IR 05000346/20214042021-12-0909 December 2021 Security Baseline Inspection Report 05000346/2021404 IR 05000346/20210502021-11-19019 November 2021 Special Inspection Reactive Report 05000346/2021050 and Apparent Violation IR 05000346/20210032021-11-10010 November 2021 Integrated Inspection Report 05000346/2021003 IR 05000346/20210112021-11-0101 November 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000346/2021011 2024-09-27
[Table view] Category:Letter
MONTHYEARML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure 2024-09-06
[Table view] |
Text
May 9, 2023
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000346/2023010
Dear Terry Brown:
On April 21, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with Chris Jackson, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Stoedter, Karla on 05/09/23 Karla K. Stoedter, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000346 License No. NPF-3
Enclosure:
As stated
Inspection Report
Docket Number: 05000346 License Number: NPF-3 Report Number: 05000346/2023010 Enterprise Identifier: I-2023-010-0037 Licensee: Energy Harbor Nuclear Corp.
Facility: Davis-Besse Nuclear Power Station Location: Oak Harbor, OH Inspection Dates: April 03, 2023 to April 21, 2023 Inspectors: T. Briley, Senior Project Engineer B. Jose, Senior Reactor Inspector L. Rodriguez, Senior Reactor Inspector Approved By: Karla K. Stoedter, Chief Engineering Branch 1 Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Commercial Grade Dedication Inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
Main article: IP 71111.21
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items (CGI) and services as basic components and for procuring safety-related (SR) structures, systems, and components for the following samples:
- (1) 100117392 - Capacitor: 1500 µF, 35 V, Electrolytic, Radial (CGI Dedication)
- (2) 100140710 - Assembly: Reactor Coolant Pump (RCP) Seal Cartridge (CGI Dedication - Inter-Utility Transfer)
- (3) 100140819 - Switch: Limit, 125 VAC/DC, 250 VAC/DC (CGI Dedication - Inter-Utility Transfer)
- (4) 24008906 - Kit: Latch, Door, Motor Control Center (MCC) (CGI Dedication)
- (5) 30244406 - Elbow: Male, 1/4" Tube to Male National Pipe Thread (NPT), 90, Brass (CGI Dedication)
- (6) 36974906 - Connector: Sleeve, Butt Splice, Copper (CGI Dedication)
- (7) 75111806 - Diode: Rectifier, 4 Amp Max Current, 100 V Reverse Voltage (CGI Dedication)
- (8) 84002601 - Coupling: Mechanical, Jaw, 5/8", 1/2", 5/8", 1" (CGI Dedication)
- (9) 86018406 - O-Ring: 5-3/4", 5-1/2",1/8", Fluorocarbon (CGI Dedication)
- (10) 100070851 - Coupling: Split Ring-Line Shaft, Nitronic 50 (SR Procurement)
- (11) 100045989 - Fuse: Parts Quality Initiative (PQI), 0.5, 4160 VAC, 4.16 kV Switchgear (SR Procurement)
- (12) 84615206 - Bearing: Angular Contact Ball, Single Row (SR Procurement)
- (13) 89560606 - Pump: Soakback, Oil, 7 GPM, 1200 RPM, With Female NPT (SR Procurement)
- (14) 35340306 - Contactor: PQI, Motor, Full Voltage (FV), Non-Reversing (NR), Size 1 (SR Procurement)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 21, 2023, the inspectors presented the Commercial Grade Dedication Inspection results to Chris Jackson, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.03 Corrective Action CR-2008-45060 MS-C-08-07-16, Missing Information on Procurement 08/20/2008
Documents Package
CR-2019-08976 EDG 2 Soak Back Pump Oil Leak 10/27/2019
CR-2019-09453 Track Situational Refurbishment Preventive Maintenance 12/05/2019
(PM) for AFW Control Boards
CR-2020-03950 New SW Pump Shafts Are out of Tolerance for Runout 05/04/2020
CR-2021-06832 As Found Replacement Parts for EDG Found to Be 09/10/2021
Degraded
CR-2021-06908 As Found Condition of Replacement Parts Are Not in 09/14/2021
Acceptable Condition
CR-2021-07364 Oil Leak Identified on the Discharge Union for the Soak 10/01/2021
Back Pump (P147-2)
CR-2022-01935 Main Steam Line Isolation Valve DB-ZS101C Failed 03/09/2022
Functional Check
CR-2022-03501 Incorrect Documentation Identified During Reconciliation 04/21/2022
of the RRP for Reactor Coolant Pump Seal Replacement
CR-2022-04807 Entered DB-OP-02515 Reactor Coolant Pump and Motor 06/12/2022
Abnormal Operation Due to RCP 1-2 Third Stage Seal
Pressure Lowering and Brining in Computer Point P814
CR-2022-05563 EDG 2 AC Circ Oil Pump (Soakback Pump) Has Shaft 08/12/2022
Leakage
CR-2023-00476 Preliminary Inspection of RCP 1-2 Removed Seal at 01/23/2023
Flowserve (Serial Number 199222)
Corrective Action CR-2023-02615 Receipt Inspection Report Filled Out Incorrectly 04/04/2023
Documents CR-2023-02737 HV5261, Control Rom Emergency Ventilation System 1 04/07/2023
Resulting from Outside Air Inlet Damper, Motor Disengagement Handle Is
Inspection Resting on an Angle Iron Support
CR-2023-03183 Parts Not Returned Properly 04/18/2023
CR-2023-03234 Part Not Returned Properly 04/19/2023
CR-2023-03274 Stock O-Ring Was Found to Have the Incorrect Shelf-Life 04/20/2023
on the Tag
CR-2023-03275 2023 NRC Commercial Grade Dedication Inspection - 04/20/2023
Inspection Type Designation Description or Title Revision or
Procedure Date
Control of Parts Process
CR-2023-03283 NRC Commercial Grade Dedication Inspection: S/C 04/20/2023
24008906 Door Latch Kit Dimensions Not Verified
Drawings M-045-00002 Model VITX-SD Service Water Pump 11
Engineering 19-0041-001 Service Water Pump Refurbishment Upgrades 0
Changes
Engineering 600975527 Supplier Deviation Notification Engine Systems Inc. 06/15/2015
Evaluations
Miscellaneous 100070851 Procurement Package - Coupling: Split Ring-Line Shaft, 4
Nitronic
100140710 Procurement Package - RCP Seal Cartridge 2
24008906 Procurement Package - Westinghouse MCC Door Kit 1
(E0000049)
24974 NUPIC Joint Commercial Grade Survey of Swagelok 03/05/2021
Company
244406 Procurement Package - Elbow 1
45394929 Purchase Order - O-ring (Stock Code 86028406) 05/30/2012
45394929 POQA for Purchase Order 45394929 - O-ring 0
45473622 POQA for Purchase Order 45473622 - Coupling 1
45473622 Purchase Order - Coupling (Stock Code 100070851) 05/08/2015
45488278 Purchase Order - MCC Door Latch Kit 01/29/2016
45550104 POQA for 45550104 - EDG Soakback Pump, Fuel Oil 0
Pump Coupling
45559619 POQA Angular Contact Single Row Ball Bearing 0
45656978 Purchase Order - O-ring (Stock Code 86018406) 02/10/2021
45656978 POQA for PO 45656978 - O-ring 0
45661759 Purchase Order - Fuse (Stock Code 100045989) 06/22/2021
45668570 Purchase Order - Reactor Coolant Pump Seal Cartridge 1
45669086 POQA for Purchase Order 45669086 - Switch 0
45669086 Purchase Order - Switch (Stock Code 100140819) 02/03/2022
47577072 Purchase Order - O-ring (Stock Code 86018406) 03/24/2015
47634175 POQA for Purchase Order 47634175 - Elbow 1
47634175 Purchase Order - Elbow (Stock Code 30244406) 01/05/2016
Inspection Type Designation Description or Title Revision or
Procedure Date
55126424 Purchase Order - Gould's Model VITX-SD 20X 28 BHC, 2 8
Stage Service Water Pump
55140964 POQA for 55140964 - RCP Seal [PROPRIETARY] 2
55140964 Purchase Order - RCP Seal Reassembly and Rebuild 01/21/2022
601348687 Notification - SCN 86901006 Switch Limit: 125 VAC/DC, 02/01/2022
250 VAC/DC, 1EA. is Required on 1R22 Work Order
200823432
601403962 Notification - It Was Found During NRC CGD Inspection, 04/20/2023
Shelf Life for SCN 86018406 PO 45656978
Batch # 0000329304 Was Found to Have the Wrong
Shelf-Life.
601404030 Notification - The NRC CGD Inspection Asked Two 04/20/2023
Questions with Respect to Interutility Transfer of
s/c 100140819, PO 45669086 (ATL-2023-0298)
601404032 Notification - Move Inventory From PO 45515963 04/20/2023
a/c 24008906 to Blocked Stock
601404175 Notification - During the NRC CGD Inspection, the 04/21/2023
Inspector Asked (ATL 2023-0298-ATA-44) if the Shelf Life
NOBP-CC-7004 Section 4.1.3 Needed Revised.
84002601 Procurement Package - Coupling-Mechanical Jaw 4
84615206 Procurement Package - Bearing 5
86018406 Procurement Package - O-ring 8
CC-049-PR Certificate of Conformance/Compliance for Non-Reversing 0
20002198-1 Size 1 Contactor
CC0220547 PO Flowserve As Found Condition Report and Repair Plan 02/15/2023
55141457 Revision 1 [PROPRIETARY]
CGD1702055-01- Commercial Grade Dedication Package for Size 1 Starter 0
Contactors
E-008-00154 Instruction and Maintenance Manual for Motor Control 7
Centers 44692-IMM-0
E0000001 Procurement Package - Insulated, Uninsulated 9
Indent/Compression Electrical Terminations, Lugs,
Splices, End Caps and Ferrules
G0000010006 Procurement Package - Electrolytic Capacitors 2
Inspection Type Designation Description or Title Revision or
Procedure Date
G0000010008 Procurement Package - Fittings, Swagelok (Non ASME III) 12 and 13
- Elbow
G0000010252 Procurement Package - Switch 3
G0000010262 Procurement Package - Bearings 0
G0000010278 Procurement Package - Small Signal Diodes 1
G0000010288 Procurement Package - O-ring 3
M-508-00087 Vendor Manual Byron Jackson N-9000 Seal Cartridge 09/17/2015
M0000009 Procurement Package - Elbow 7
Procedures NOBP-CC-7001 Procurement Packages 22
NOBP-CC-7004 Shelf Life Evaluation 2
NOBP-MS-2005 Nuclear Warehousing 11
NOP-CC-7002 Procurement Engineering 14
NOP-LP-2020 Quality Control Receipt Inspection 22
NOP-MS-4001 Warehousing 13
NOP-OP-1012 Material Readiness and Housekeeping Inspection 13
Program
Work Orders 200574481 PM 0924 P3-3 Rebuild/Install SW Pump 3 10/06/2021
200663016 Replace the E/P Converter, FYDH13B, for the Decay Heat 05/02/2019
Cooler 1-1 Bypass Flow Control Valve (i.e., DB-DH13B)
200688146 PM 2305 BF11C ME09100 Clean MCC F11C 1R20 03/27/2018
200741132 PM 1349 K5-2 Insp-Rplc EDG #2 10/17/2019
200796393 PM 0724 K5-2 24 Mo Ck EDG #2 09/30/2021
200822903 Replace Circuit Boards for Auxiliary Feedwater (AFW) 03/20/2022
Pump 1-1 Discharge Control Valve
200822975 Replace Circuit Board for AFW Pump 1-2 Discharge 04/08/2022
Control Valve
200823050 Remove and Replace RCP Mechanical Seal in 04/26/2022
Accordance with DB-MM-09012
200823050 PM 2415 Seal Repair and Replace RCP 1-2 05/10/2022
200823432 PM 11928 MS101 Limit Switch Func. Check 04/06/2022