IR 05000346/2023010

From kanterella
Jump to navigation Jump to search
Commercial Grade Dedication Inspection Report 05000346/2023010
ML23128A277
Person / Time
Site: Davis Besse 
Issue date: 05/09/2023
From: Karla Stoedter
NRC/RGN-III/DORS/RPB2
To: Tony Brown
Energy Harbor Nuclear Corp
References
IR 2023010
Download: ML23128A277 (1)


Text

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000346/2023010

Dear Terry Brown:

On April 21, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with Chris Jackson, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Karla K. Stoedter, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2023010

Enterprise Identifier:

I-2023-010-0037

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

April 03, 2023 to April 21, 2023

Inspectors:

T. Briley, Senior Project Engineer

B. Jose, Senior Reactor Inspector

L. Rodriguez, Senior Reactor Inspector

Approved By:

Karla K. Stoedter, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Commercial Grade Dedication Inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)

The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items (CGI) and services as basic components and for procuring safety-related (SR) structures, systems, and components for the following samples:

(1)100117392 - Capacitor: 1500 µF, 35 V, Electrolytic, Radial (CGI Dedication)

(2)100140710 - Assembly: Reactor Coolant Pump (RCP) Seal Cartridge (CGI Dedication - Inter-Utility Transfer)

(3)100140819 - Switch: Limit, 125 VAC/DC, 250 VAC/DC (CGI Dedication - Inter-Utility Transfer)

(4)24008906 - Kit: Latch, Door, Motor Control Center (MCC) (CGI Dedication)

(5)30244406 - Elbow: Male, 1/4" Tube to Male National Pipe Thread (NPT), 90, Brass (CGI Dedication)

(6)36974906 - Connector: Sleeve, Butt Splice, Copper (CGI Dedication)

(7)75111806 - Diode: Rectifier, 4 Amp Max Current, 100 V Reverse Voltage (CGI Dedication)

(8)84002601 - Coupling: Mechanical, Jaw, 5/8", 1/2", 5/8", 1" (CGI Dedication)

(9)86018406 - O-Ring: 5-3/4", 5-1/2",1/8", Fluorocarbon (CGI Dedication)

(10)100070851 - Coupling: Split Ring-Line Shaft, Nitronic 50 (SR Procurement)

(11)100045989 - Fuse: Parts Quality Initiative (PQI), 0.5, 4160 VAC, 4.16 kV Switchgear (SR Procurement)

(12)84615206 - Bearing: Angular Contact Ball, Single Row (SR Procurement)

(13)89560606 - Pump: Soakback, Oil, 7 GPM, 1200 RPM, With Female NPT (SR Procurement)

(14)35340306 - Contactor: PQI, Motor, Full Voltage (FV), Non-Reversing (NR), Size 1 (SR Procurement)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 21, 2023, the inspectors presented the Commercial Grade Dedication Inspection results to Chris Jackson, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2008-45060

MS-C-08-07-16, Missing Information on Procurement

Package

08/20/2008

CR-2019-08976

EDG 2 Soak Back Pump Oil Leak

10/27/2019

CR-2019-09453

Track Situational Refurbishment Preventive Maintenance

(PM) for AFW Control Boards

2/05/2019

CR-2020-03950

New SW Pump Shafts Are out of Tolerance for Runout

05/04/2020

CR-2021-06832

As Found Replacement Parts for EDG Found to Be

Degraded

09/10/2021

CR-2021-06908

As Found Condition of Replacement Parts Are Not in

Acceptable Condition

09/14/2021

CR-2021-07364

Oil Leak Identified on the Discharge Union for the Soak

Back Pump (P147-2)

10/01/2021

CR-2022-01935

Main Steam Line Isolation Valve DB-ZS101C Failed

Functional Check

03/09/2022

CR-2022-03501

Incorrect Documentation Identified During Reconciliation

of the RRP for Reactor Coolant Pump Seal Replacement

04/21/2022

CR-2022-04807

Entered DB-OP-02515 Reactor Coolant Pump and Motor

Abnormal Operation Due to RCP 1-2 Third Stage Seal

Pressure Lowering and Brining in Computer Point P814

06/12/2022

CR-2022-05563

EDG 2 AC Circ Oil Pump (Soakback Pump) Has Shaft

Leakage

08/12/2022

Corrective Action

Documents

CR-2023-00476

Preliminary Inspection of RCP 1-2 Removed Seal at

Flowserve (Serial Number 199222)

01/23/2023

CR-2023-02615

Receipt Inspection Report Filled Out Incorrectly

04/04/2023

CR-2023-02737

HV5261, Control Rom Emergency Ventilation System 1

Outside Air Inlet Damper, Motor Disengagement Handle Is

Resting on an Angle Iron Support

04/07/2023

CR-2023-03183

Parts Not Returned Properly

04/18/2023

CR-2023-03234

Part Not Returned Properly

04/19/2023

CR-2023-03274

Stock O-Ring Was Found to Have the Incorrect Shelf-Life

on the Tag

04/20/2023

71111.21N.03

Corrective Action

Documents

Resulting from

Inspection

CR-2023-03275

23 NRC Commercial Grade Dedication Inspection -

04/20/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Control of Parts Process

CR-2023-03283

NRC Commercial Grade Dedication Inspection: S/C

24008906 Door Latch Kit Dimensions Not Verified

04/20/2023

Drawings

M-045-00002

Model VITX-SD Service Water Pump

Engineering

Changes

19-0041-001

Service Water Pump Refurbishment Upgrades

Engineering

Evaluations

600975527

Supplier Deviation Notification Engine Systems Inc.

06/15/2015

100070851

Procurement Package - Coupling: Split Ring-Line Shaft,

Nitronic

100140710

Procurement Package - RCP Seal Cartridge

24008906

Procurement Package - Westinghouse MCC Door Kit

(E0000049)

24974

NUPIC Joint Commercial Grade Survey of Swagelok

Company

03/05/2021

244406

Procurement Package - Elbow

45394929

Purchase Order - O-ring (Stock Code 86028406)

05/30/2012

45394929

POQA for Purchase Order 45394929 - O-ring

45473622

POQA for Purchase Order 45473622 - Coupling

45473622

Purchase Order - Coupling (Stock Code 100070851)

05/08/2015

45488278

Purchase Order - MCC Door Latch Kit

01/29/2016

45550104

POQA for 45550104 - EDG Soakback Pump, Fuel Oil

Pump Coupling

45559619

POQA Angular Contact Single Row Ball Bearing

45656978

Purchase Order - O-ring (Stock Code 86018406)

2/10/2021

45656978

POQA for PO 45656978 - O-ring

45661759

Purchase Order - Fuse (Stock Code 100045989)

06/22/2021

45668570

Purchase Order - Reactor Coolant Pump Seal Cartridge

45669086

POQA for Purchase Order 45669086 - Switch

45669086

Purchase Order - Switch (Stock Code 100140819)

2/03/2022

47577072

Purchase Order - O-ring (Stock Code 86018406)

03/24/2015

47634175

POQA for Purchase Order 47634175 - Elbow

Miscellaneous

47634175

Purchase Order - Elbow (Stock Code 30244406)

01/05/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

55126424

Purchase Order - Gould's Model VITX-SD 20X 28 BHC, 2

Stage Service Water Pump

55140964

POQA for 55140964 - RCP Seal [PROPRIETARY]

55140964

Purchase Order - RCP Seal Reassembly and Rebuild

01/21/2022

601348687

Notification - SCN 86901006 Switch Limit: 125 VAC/DC,

250 VAC/DC, 1EA. is Required on 1R22 Work Order 200823432

2/01/2022

601403962

Notification - It Was Found During NRC CGD Inspection,

Shelf Life for SCN 86018406 PO 45656978

Batch # 0000329304 Was Found to Have the Wrong

Shelf-Life.

04/20/2023

601404030

Notification - The NRC CGD Inspection Asked Two

Questions with Respect to Interutility Transfer of

s/c 100140819, PO 45669086 (ATL-2023-0298)

04/20/2023

601404032

Notification - Move Inventory From PO 45515963

a/c 24008906 to Blocked Stock

04/20/2023

601404175

Notification - During the NRC CGD Inspection, the

Inspector Asked (ATL 2023-0298-ATA-44) if the Shelf Life

NOBP-CC-7004 Section 4.1.3 Needed Revised.

04/21/2023

84002601

Procurement Package - Coupling-Mechanical Jaw

84615206

Procurement Package - Bearing

86018406

Procurement Package - O-ring

CC-049-PR

20002198-1

Certificate of Conformance/Compliance for Non-Reversing

Size 1 Contactor

CC0220547 PO

55141457

Flowserve As Found Condition Report and Repair Plan

Revision 1 [PROPRIETARY]

2/15/2023

CGD1702055-01-

Commercial Grade Dedication Package for Size 1 Starter

Contactors

E-008-00154

Instruction and Maintenance Manual for Motor Control

Centers 44692-IMM-0

E0000001

Procurement Package - Insulated, Uninsulated

Indent/Compression Electrical Terminations, Lugs,

Splices, End Caps and Ferrules

G0000010006

Procurement Package - Electrolytic Capacitors

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

G0000010008

Procurement Package - Fittings, Swagelok (Non ASME III)

- Elbow

and 13

G0000010252

Procurement Package - Switch

G0000010262

Procurement Package - Bearings

G0000010278

Procurement Package - Small Signal Diodes

G0000010288

Procurement Package - O-ring

M-508-00087

Vendor Manual Byron Jackson N-9000 Seal Cartridge

09/17/2015

M0000009

Procurement Package - Elbow

NOBP-CC-7001

Procurement Packages

NOBP-CC-7004

Shelf Life Evaluation

NOBP-MS-2005

Nuclear Warehousing

NOP-CC-7002

Procurement Engineering

NOP-LP-2020

Quality Control Receipt Inspection

NOP-MS-4001

Warehousing

Procedures

NOP-OP-1012

Material Readiness and Housekeeping Inspection

Program

200574481

PM 0924 P3-3 Rebuild/Install SW Pump 3

10/06/2021

200663016

Replace the E/P Converter, FYDH13B, for the Decay Heat

Cooler 1-1 Bypass Flow Control Valve (i.e., DB-DH13B)

05/02/2019

200688146

PM 2305 BF11C ME09100 Clean MCC F11C 1R20

03/27/2018

200741132

PM 1349 K5-2 Insp-Rplc EDG #2

10/17/2019

200796393

PM 0724 K5-2 24 Mo Ck EDG #2

09/30/2021

200822903

Replace Circuit Boards for Auxiliary Feedwater (AFW)

Pump 1-1 Discharge Control Valve

03/20/2022

200822975

Replace Circuit Board for AFW Pump 1-2 Discharge

Control Valve

04/08/2022

200823050

Remove and Replace RCP Mechanical Seal in

Accordance with DB-MM-09012

04/26/2022

200823050

PM 2415 Seal Repair and Replace RCP 1-2

05/10/2022

Work Orders

200823432

PM 11928 MS101 Limit Switch Func. Check

04/06/2022