Integrated Inspection Report 05000482/2020003
ML20317A261
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/12/2020
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Reasoner C
Wolf Creek
References
EA-20-0089 IR 2020003
Preceding documents:
Download: ML20317A261 (42)


Text

November 12, 2020

SUBJECT:

WOLF CREEK GENERATING STATION - INTEGRATED INSPECTION REPORT 05000482/2020003

Dear Mr. Reasoner:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On October 5, 2020, the NRC inspectors discussed the results of this inspection with Mr. J. McCoy, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. Both of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Wolf Creek Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Neil F. O'Keefe, Chief Reactor Projects Br B Division of Reactor Projects

Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2020003

Enterprise Identifier: I-2020-003-0008

Licensee:

Wolf Creek Nuclear Operating Corporation

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

July 1, 2020, to September 30, 2020

Inspectors:

R. Alexander, Senior Emergency Preparedness Inspector

D. Antonangeli, Health Physicist

B. Baca, Health Physicist

D. Dodson, Senior Reactor Inspector

M. Doyle, Operations Engineer

N. Greene, Senior Health Physicist

M. Hayes, Senior Operations Engineer

C. Henderson, Senior Resident Inspector

J. Kirkland, Senior Operations Engineer

J. Mateychick, Senior Reactor Inspector

J. O'Donnell, Senior Health Physicist

E. Simpson, Health Physicist

J. Vera, Resident Inspector

Approved By:

Neil F. O'Keefe, Chief

Reactor Projects Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Properly Evaluate and Install Correct Fuse Size Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2020003-01 Open/Closed None (NPP)71111.04 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50), Appendix B,

Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements associated with the safety-related Class 1E air conditioning units were reviewed for suitability of application of materials, parts, equipment, and processes.

Specifically, the licensee failed to properly evaluate and install correctly sized fuses to prevent spurious trips of the safety-related Class 1E air condition units (SGK05A/B).

Failure to Identify and Correct a Condition Adverse to Quality for Safety-Related Air Conditioning Units Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2020003-02 Open/Closed

[H.6] - Design Margins 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to identify and correct conditions adverse to quality. Specifically, the licensee failed to identify and correct the cause of multiple failures of the copper sensing lines. The tubing was subjected to excessive bending (cold working) during installation, causing a preexisting flaw that became a through-wall crack due to cyclic stresses caused by normal vibration on multiple occasions. This condition created refrigerant leaks that resulted in inoperability of the safety-related air conditioning units for the control room (SGK04) and Class 1E electrical switchgear rooms (SGK05).

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000482/2020-002-00 Faulted Supply Fan Motor Causes Diesel Generator Inoperability Longer than Technical Specification Completion Time 71153 Closed

LER 05000482/2020-001-01 Plant Shutdown Due to Inoperable Containment Purge Isolation Valves 71153 Closed URI 05000482/2020002-03 Train B Emergency Diesel Generator Supply Fan Motor Failure (EA-20-0089)71153 Closed

PLANT STATUS

Wolf Creek Generating Station began the inspection period at full power. On September 10, 2020, power was lowered to 85 percent to perform main turbine valve surveillance testing. The unit was returned to full power on September 11, 2020, where it remained for the rest of the reporting period except for minor power reductions to support scheduled surveillances.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week and during that time, conducted plant status activities as described in IMC 2515, Appendix D; observed risk-significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and onsite. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) Potential severe weather and opening outside emergency diesel generator A and B missile doors on July 28, 2020

External Flooding Sample (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding for the following areas on July 12, 2020:

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Auxiliary feedwater system trains A and B on July 8, 2020
(2) Emergency diesel generator supply fan system train B on September 2, 2020
(3) Essential service water system train A during essential service water system train B maintenance window on July 30, 2020
(4) Powering safety-related 4160 volt AC bus NB01 or NB02 from station blackout diesels with the turbine-driven auxiliary feedwater pump unavailable on September 2, 2020
(5) Safety injection system train B on September 8, 2020

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Class 1E air condition unit system on August 24, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Engineering safety feature switchgear room train B, fire area C-10, on July 28, 2020
(2) Engineering safety feature switchgear room train A, fire area C-9 and control room air condition unit, on August 4, 2020
(3) North electrical penetration room, fire area A-18, on August 4, 2020
(4) Control room air conditioning and filtration units room 1512, fire area A-22, on August 4, 2020
(5) Reactor trip switchgear room 1403, fire area A-27, on August 4, 2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of the following:

(1) Review of sedimentation surveillance for ultimate heat sink reservoir and essential service water intake channel on July 31, 2020

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on June 8-July 31, 2020.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations

The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on June 17 and June 24, 2020.

Annual Requalification Operating Tests

The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test

The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security

The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations

The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions

The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator

The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution

The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during control rod operability and rod parking operations on July 23, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the licensed operator simulator evaluation scenarios on September 3 and 9, 2020

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Class 1E air conditioning unit train B on August 20, 2020
(2) Maintenance Rule 2020 50.65(a)(3) periodic evaluation on September 17, 2020

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Emergency diesel generator B air supply fan motor on September 15, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Essential service water and emergency diesel generator train B planned maintenance outage window on July 29, 2020
(2) Class 1E air conditioning unit train B emergent work and unplanned limited condition of operation entry due to fire damper failing closed on July 31, 2020
(3) Spray additive system emergent work and unplanned limiting condition for operation due to spray additive tank low-low alarm preventing EN HV-15 and 16 suction valves from opening on August 4, 2020
(4) Motor-driven auxiliary feedwater pump B planned maintenance outage window on August 5, 2020
(5) Containment spray system train A planned maintenance activities and associated flood barrier breached on August 26, 2020
(6) Turbine-driven auxiliary feedwater system planned maintenance activities on August 26, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Essential service water system train A obstruction impacting corrected differential pressure trending operability determination on July 26, 2020
(2) Residual heat removal room sump blockage impact on internal flooding operability determination on July 26, 2020
(3) Emergency core cooling system accumulator A, B, and C in leakage operability determination on August 7, 2020
(4) Residual heat removal train B boron concentration adjustment during an evacuation of the control room operability determination on August 7, 2020
(5) Class 1E air condition unit train B sensing line failure past operability determination on August 26, 2020
(6) Auxiliary system leakage and impact on ultimate heat sink operability determination on September 11, 2020
(7) Auxiliary feedwater rooms 1328 and 1330 degraded penetration P135W2195 high energy line break operability determination on September 25, 2020

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Security diesel temporary modification due to bypass transfer switch in indeterminate position on August 20, 2020
(2) Class 1E air condition unit cross-tie trains A and B permanent modification on August 24, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (11 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Safety injection pump train A preventive maintenance on July 15, 2020
(2) Essential service water system train B maintenance window on July 30, 2020
(3) Motor-driven auxiliary feedwater pump train B motor coupling maintenance on August 5, 2020
(4) Containment spray train A maintenance window on August 12, 2020
(5) Emergency diesel generator train B maintenance window on August 12, 2020
(6) Class 1E air conditioning unit train B to battery room switchgear room fire damper GKD0076 replacement due to failing closed on August 12, 2020
(7) Motor-driven auxiliary feedwater train B motor operated valve maintenance on August 25, 2020
(8) Turbine-driven auxiliary feedwater system valve maintenance window on August 26, 2020
(9) Essential service water system train B manhole inspections on September 3, 2020.
(10) Centrifugal charging pump A maintenance window on September 17, 2020
(11) Class 1E air conditioning unit train A sensing lining replacement to stainless steel braided tubing on September 25, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Safety injection pump train A surveillance testing on July 17, 2020
(2) Containment spray pump train A surveillance on August 11, 2020
(3) Motor-driven auxiliary feedwater pump train B surveillance testing on August 17, 2020
(4) Class 1E electrical system air conditioning train B air flow rate and essential service water flow surveillance testing on August 27, 2020
(5) Main turbine stop valve surveillance testing on September 14, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2018, and July 15, 2020. This evaluation included the implementation of Integrated Public Alert and Warning System (IPAWS) in 2Q/2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between September 1, 2018-July 15, 2020.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes, transmitted to the NRC on April 26, 2020:
  • Radiological Emergency Response Plan (RERP), Revision 21; issued on April 2, 2020 This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2018 and July 15, 2020.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)

The inspectors evaluated:

(1) Licensed operator requalification with drill and exercise performance indication opportunity on September 9, 2020
(2) Licensed operator requalification with drill and exercise performance indication opportunity on September 29,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (10 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) Area radiation monitors in the auxiliary and fuel buildings
(2) Portable Ludlum 9-4 ion chambers stored ready for use and/or during use in the plant
(3) Portable friskers used in the auxiliary building, fuel building, radwaste building, and at the radiologically controlled area (RCA) exit (4)iSolo Canberra counting systems in the count room
(5) MGP Telepole survey instruments in the auxiliary and fuel buildings
(6) Thermo Scientific Neutron Ball Meter ready for use at the egress of the containment building
(7) Gooseneck air sampler for upender maintenance job in spent fuel pool area
(8) Mirion Technologies Mowin personnel monitors at the RCA exit
(9) Canberra Gamma GEM-5 personnel monitors at the plant exit
(10) Small article monitors at the RCA exit

Calibration and Testing Program (IP Section 03.02) (14 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Area Radiation Monitors: SDRE0033, Control Room (Work Order 19-448472-000);

SDRE0034, Cask Handling Area (Work Order 20-458022-000); SDRE0035, New Fuel Storage Area (Work Order 18-444565-000); SDRE0043, Technical Support Center (Work Order 19-450398-001); SDRE0047, PASS Sampling Room (Work Order 19-448319-000)

(2) Canberra GEM-5: WC09668, WC096670
(3) Canberra ISOLO: WC093661
(4) Containment High Range Monitors: GTRE0059 (Work Orders 18-442035-000, 18-442403-000, and 18-442403-001) and GTRE0060 (Work Orders 18-442032-000 and 18-442432-000)
(5) Continuous Air Monitors: GK-RE-04/05, Control Room Air Supply Monitors (Work Orders 19-449788-000 and 19-453037-000); GT-RE-31/32, Containment Atmosphere Monitors (Work Orders 19-438876-000, 19-439399-000,19-454646-000 and 19-454660-000); GT-RE-22/33, Containment Purge System Monitors (Work Orders 18-442005-000 and 18-446248-000)
(6) Eberline AMS-4: WC011409, WC11427
(7) High Purity Germanium Detector: Detector #9 (WC01527)
(8) Ludlum 177 and 2200 count ratemeters: WC011266, WC011275, WC011321, WC011324
(9) Ludlum 9-4: WC095062, WC95223
(10) Mirion Technologies, Inc. (MGPI) DMC-2000/DMC-3000/DMC-3000N Serial Numbers: 000A5C, 000A60, 000A65, 01A03D0F, 01A03DE5, 01A03E4B, 01A03EEE, 029106, 030768, 689806, 0009B0, 911606, 930865, 954310, 954182
(11) MGPI Telepole: WC010178, WC092743
(12) ORTEC WBC-200-DS8530 High Purity Germanium Based Chair: WC10066
(13) Thermo Fisher Scientific PM-12: WC095921
(14) Thermo Fisher Scientific SAM-11: WC093361, WC095941

Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (3 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) GH-RE-10A/B Radwaste Building Exhaust Monitor (Work Orders 19-447754-000, 19-449764-000, and 20-461276-002)
(2) GT-RE-21A/B Plant Unit Vent Monitor (Work Orders 18-443989-000 and 18-446400-000)
(3) Liquid Effluent Monitors: HB-RE-18 Liquid Radwaste Discharge Monitor (Work Order 18-441833-000) and LE-RE-59 Turbine Building Drain Monitor (Work Order 19-452744-000)

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Auxiliary building ventilation system discharge to main plant vent stack
(2) Steam generator blowdown effluent liquid monitor
(3) Fuel handling building exhaust ventilation system
(4) Radwaste vent effluent monitor

Sampling and Analysis (IP Section 03.02) (3 Samples)

The inspectors evaluated the following sampling and analyses:

(1) Liquid effluent sampling and analyses for liquid release permits:

2019-044, 2019-066, 2019-071, and 2020-013

(2) Gaseous effluent sampling and analyses for gaseous release permits:

2018-136, 2019-003, 2019-052, 2019-119, 2020-034, 2020-043, and 2020-065

(3) Compensatory sampling for GTRE21B on June 11, 2020

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) Doses to members of the public associated with liquid effluent release permits:

2019-044, 2019-066, 2019-071, and 2020-013

(2) Doses to members of the public associated with gaseous effluent sampling and analyses for gaseous release permits:

2018-136, 2019-003, 2019-052, 2019-119, 2020-034, 2020-043, and 2020-065

Abnormal Discharges (IP Section 03.04)

There were no abnormal discharges during the monitoring period.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01)

(1) Inspectors evaluated the licensees performance in controlling, labelling, and securing radioactive materials.
(2) Inspectors evaluated the following sealed sources:
(3) Inspectors evaluated the following radioactive material storage areas:
  • Radiologically controlled area yard
  • Spent fuel pool
  • Low level drum storage area

Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

(1) Inspectors walked down accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality.
(2) Inspectors also walked down the following areas:
  • Spent resin tank corridor and dewatering skid
  • Waste management control room

Waste Characterization and Classification (IP Section 03.03) (2 Samples)

(1) The inspectors evaluated the licensees characterization and classification of radioactive waste.
(2) The inspectors evaluated waste characterizations for the following types of packages:
  • Dry active waste
  • Filters
  • Spent resin

Shipment Preparation (IP Section 03.04) (1 Partial)

The inspectors were unable to observe preparation of a shipment containing radioactive material according to requirements.

(1)

(Partial)

The inspectors reviewed documents relative to shipments containing radioactive material to ensure each shipment was prepared according to requirements (20R19 and 20R20)

Shipping Records (IP Section 03.05) (5 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1)18R05; UN3321, RAM, LSA-II, 7, Fissile-Excepted, RQ; Spent Resin; 03/13/2018 (2)19R03; UN3321, RAM, LSA-II, 7; Spent Resin; 02/07/2019 (3)19R07; UN3321, RAM, LSA-II, 7, Fissile-Excepted, RQ; Spent Resin; 03/12/2019 (4)19R32; UN3321, RAM, LSA-II, 7, Fissile-Excepted, RQ; Spent Resin; 10/30/2019 (5)19R35; UN3321, RAM, LSA-II, 7, Fissile-Excepted, RQ; RW Filters; 09/14/2019

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) October 1, 2019-June 30, 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) October 1, 2019-June 30, 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) October 1, 2019-June 30, 2020

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (1 Sample)

(1) July 1, 2019-June 30, 2020

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

(1) July 1, 2019-June 30, 2020

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Class 1E and control room air conditioning unit sensing line failures corrective actions and extent of condition on August 13, 2020
(2) Emergency diesel generator train B supply fan motor failure on September 16, 2020

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 05000482/2020-001-01, "Plant Shutdown Due to Inoperable Containment Purge Isolation Valves" (ADAMS Accession No. ML20188A257). The inspectors reviewed the updated LER submittal. The previous LER submittal was reviewed in Inspection Report 0500482/2020002.
(2) LER 0500482/2020-002-00, "Faulted Supply Fan Motor Causes Diesel Generator Inoperability Longer than Technical Specification Completion Time" (ADAMS Accession No. ML20240A232). The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency was identified. The inspectors did not identify a violation of NRC requirements.

INSPECTION RESULTS

Failure to Properly Evaluate and Install Correct Fuse Size Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000482/2020003-01 Open/Closed None (NPP)71111.04 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50), Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the safety-related Class 1E air conditioning units, were reviewed for suitability of application of materials, parts, equipment, and processes.

Specifically, the licensee failed to properly evaluate and install correctly sized fuses to prevent spurious trips of the safety-related Class 1E air condition units (SGK05A/B).

Description:

On October 30, 2019, the licensee was performing undervoltage testing in accordance with surveillance Procedure STS KJ-001A, Integrated D/G and Safeguards Actuation Test - Train A, Revision 65, when the Class 1E air conditioning unit train A (SKG05A) tripped following restart. This was caused by a blown 20-amp fuse on one of the phases to the air handling unit blower motor for SKG05A. The licensee replaced the fuse and SKG05A was retested satisfactorily in accordance with Procedure STS KJ-001A. The licensee determined they did not properly evaluate and install correct sized fuses to prevent spurious trips of SKG05A/B during the implementation of Change Package 09879, Replace SGK04A/B and SGK05A/B Air Conditioning Units, Revision 31, in June 2004 and July 2004.

The licensee implemented Design Change Package 020350, SGK05A/B Fuse Replacement, Revision 0, as a corrective action to determine the correct fuse size to be installed for the air handling unit blower motor for SKG05A/B. The licensee determined that 30-amp fuses, instead of the previously installed 20-amp fuses, were required to be installed to prevent spurious trips of SGK05A/B. The licensee replaced the 20-amp fuses for SGK05A/B air handling units in accordance with Work Orders 19-455924-001 and 19-455924-002. The licensee entered this issue into corrective action program as Condition Reports CR-38017, CR-138036, and CR-138042.

The inspectors reviewed the above information and concluded the licensee failed to properly evaluate and install the correct sized fuses for the SGK05A/B air handling unit replacement during the implementation of Change Package 09879 in June 2004 and July 2004.

Specifically, the licensee did not consider the requirements of Institute of Electrical and Electronics Engineers (IEEE) 603-1991 to prevent spurious trips of SGK05A/B. The purpose of the fuse in this design application was to protect the wiring downstream of the fuses and not the air handling motor. The wiring downstream of the fuses has a full load rating of 40 amps, which would have required a fuse of 30 amps. Therefore, the licensee corrective actions to install 30-amp fuses for the SGK05A/B air handling unit in accordance with Design Change Package 020350 was appropriate.

Corrective Actions: The licensee implemented Design Change Package 020350, SGK05A/B Fuse Replacement, Revision 0, to determine the current sized fuses to be installed for the air handling unit blower motor for SKG05A/B. The correct fuses were installed in accordance with Work Orders 19-455924-001 and 19-455924-002.

Corrective Action References: Condition Reports CR-138017, CR-138036, and CR-138042

Performance Assessment:

Performance Deficiency: The licensees failure to properly evaluate and install correctly sized fuses to prevent spurious trips of Class 1E air conditioning units was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, failure to properly evaluate and install correct sized fuses resulted in a spurious trip of SGK05A and impacted the reliability of this equipment needed to provide cooling to electric power distribution systems for safety-related mitigating systems.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was determined to be very low safety significance (Green) because it:

(1) was not a design deficiency,
(2) did not represent a loss of system and/or function,
(3) did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time,
(4) did not represent a loss of the probabilistic risk analysis function of two separate technical specification systems for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
(5) did not represent a loss of probabilistic risk analysis system and/or function for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
(6) did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-Cutting Aspect: Not Present Performance. No cross-cutting aspect was assigned to this finding because the inspectors determined the finding did not reflect present licensee performance. Specifically, the performance deficiency occurred in 2004 during replacement of the SKG05A/B air handling units.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, states, in part, that measures shall be established to assure that applicable regulatory requirements and the design basis, as defined in 10 CFR 50.2 and as specified in the licensee application, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions. Measures shall also be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems, and components.

Contrary to the above, from June 2004 to January 2020, the licensee failed to establish measures to assure that applicable regulatory requirements and the design basis, as defined in 10 CFR 50.2 and as specified in the licensee application for the safety-related Class 1E air condition units to which this appendix applies, were correctly translated into specifications, drawings, procedures, and instructions. The licensee further failed to establish measures to assure the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems, and components for the safety-related Class 1E air conditioning units. Specifically, the licensee failed to properly evaluate and install correctly sized fuses to prevent spurious trips of the safety-related Class 1E air condition units in accordance with IEEE 603-1991.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Identify and Correct a Condition Adverse to Quality for Safety-Related Air Conditioning Units Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000482/2020003-02 Open/Closed

[H.6] - Design Margins 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to identify and correct conditions adverse to quality. Specifically, the licensee failed to identify and correct the cause of multiple failures of the copper sensing lines. The tubing was subjected to excessive bending (cold working) during installation, causing a preexisting flaw that became a through wall crack due to cyclic stresses caused by normal vibration on multiple occasions. This condition created refrigerant leaks that resulted in inoperability of the safety-related air conditioning units for the control room (SGK04) and Class 1E electrical switchgear rooms (SGK05).

Description:

The inspectors reviewed the failure history of four identical safety-related air conditioning system chillers following a recent failure. The licensee has four safety-related trains of air conditioning units used to cool the control room (SGK04A and B) and Class 1E electrical switchgear rooms (SGK05A and B). The chiller units have repeatedly developed refrigerant leaks in small-diameter copper tubing that rendered the associated unit inoperable. The inspectors learned that these tubes were being bent into a suitable shape in the field during installation in order to connect it at each terminus point. This bending activity has been performed by hand using skill of the craft rather than proscribing a method that would limit the bend radius, resulting in excessive bending that created conditions conducive to eventual fatigue failure.

The inspectors reviewed the equipment performance evaluation (EPE) documented in Condition Report CR-141891, operating experience associated SGK05 and SGK04 units, and the copper sensing line hardware failure analyses performed in May 2020 and February 2014, and noted the following:

  • On October 10, 2013, the licensee identified a refrigerant leak on the train B control room air condition unit (SGK04B) copper sensing line. The licensee declared SGK04B inoperable and replaced the copper sensing line. As part of corrective action in Condition Report CR-76409, the licensee performed a basic cause evaluation. A vendor-performed hardware failure analysis, completed in February 2014, and concluded the failure was due to low stress/high cycle fatigue which resulted from excessive bending of the copper tubing. The proposed corrective action to change the sensing line from rigid copper tubing to flexible braided stainless steel tubing was presented to the plant health committee in November 2014. Instead, the licensee decided to replace the copper sensing lines with identical parts every 5 years.
  • On April 15, 2018, the licensee identified a refringent leak from SGK04As copper sensing line during a maintenance window which was replaced prior to restoring SGK04A to operable. The licensee determined that the failure of the copper sensing line was caused by excessive bending and cyclic stress caused by normal vibration. The failed copper sensing line was last replaced on January 6, 2016, per Work Order 16-410209-000 due to an identified leak.
  • On May 4, 2018, during system engineering walkdowns the copper sensing line on SGK05B was identified as bent and was replaced during compressor replacement prior to a failure occurring. The replacement of the copper tubing was based on the operating experience of SGK04 and SKG05 copper tubing failures.
  • On April 10, 2020, the copper sensing line connected to the Class 1E air conditioning unit train B (SGK05B) developed a refrigerant leak. The licensee declared SGK05B inoperable to replace the copper sensing line. The copper sensing line had previously been installed on December 11, 2019, and excessive bending of the copper tubing occurred during the installation. The license entered this issue into their corrective action program as Condition Report CR-141891 and performed an equipment performance evaluation. A vendor-performed failure analysis concluded the copper sensing line cracked due to outside diameter-initiated fatigue. The microstructure of the copper sensing line revealed indications of cold working, such as from bending, which may have contributed to the reduced fatigue life of the copper sensing line.

The inspectors noted that since implementing the 5-year replacement plan, the licensee continued to experience the same type of failure, indicating that the corrective action was not effective. Specifically, the licensee failed to address the following attributes that contributed to the failures:

  • The installation process for field bending the tubing was not changed to avoid creating stress concentration points or flaws.
  • The tubing material was not changed to a material or geometry that is resistant to fatigue failure.
  • Selecting an appropriate replacement interval to avoid failures would require a detailed knowledge of the flaw, which was effectively not possible. The above failures since instituting a 5-year replacement interval occurred prior to the intended replacement date.

From the above information, the inspectors concluded that the licensee failed to recognize that the condition adverse to quality associated with the SGK04 and SGK05 copper sensing line failures was the existence of stress concentrations or flaws in the tubing caused by the failure to ensure that a quality-controlled process was used to bend and install the tubing during installation. Therefore, the licensees corrective action to implement a 5-year preventative maintenance replacement of the copper sensing line did not correct the condition adverse to quality associated with their failures. This resulted in a long-standing equipment issue of copper sensing line failures that impacted SGK04 and SGK05 reliability, availability, and capability to respond to initiating events.

Corrective Actions: The licensee identified a replacement part that was much less susceptible to fatigue failure. The licensee scheduled work orders to replace the cooper sensing lines with stainless steel braided flexible tubing in the next available maintenance windows for SGK05A, SGK05B, SGK04A, and SGK04B.

Corrective Action References: Condition Report CR-141891

Performance Assessment:

Performance Deficiency: The licensees failure to correct a condition adverse to quality associated with the safety-related air conditioning units copper sensing line caused by inadequate quality control process for bending the tubes was a performance deficiency.

Specifically, by allowing hand-bending in the field, the tubes were made more susceptible to fatigue failure and failures occurred on multiple occasions.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, failure to correct the conditions which resulted in multiple copper sensing line failures and inoperability of SGK05 and SGK04.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was determined to be of very low safety significance (Green) because it:

(1) was not a design deficiency,
(2) did not represent a loss of system and/or function,
(3) did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time,
(4) did not represent a loss of the probabilistic risk assessment (PRA)function of two separate technical specification systems for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
(5) did not represent a loss of a PRA system and/or function for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
(6) did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-Cutting Aspect: H.6 - Design Margins: The organization operates and maintains equipment within design margins. Margins are carefully guarded and changed only through a systematic and rigorous process. Special attention is placed on maintaining fission product barriers, defense-in-depth, and safety related equipment. Specifically, the licensee failed to implement corrective actions to minimizing long-standing equipment issues associated with SGK05 and SGK04 units copper sensing line failures.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, states, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.

Contrary to the above, between November 2014 to April 2020, the licensee failed to identify and correct a condition adverse to quality associated with the SGK04 and SGK05 copper sensing lines. Specifically, the licensee failed recognize that the installation process created a condition adverse to quality in the copper sensing lines by creating stress concentrations or flaws in the tubing because of the failure to ensure that a quality-controlled process was used to bend and install the tubing during installation. This condition resulted in multiple instances of inoperability of the safety-related air conditioning units for the control room (SGK04) and Class 1E electrical switchgear rooms (SGK05).

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Unresolved Item (Closed)

Train B Emergency Diesel Generator Supply Fan Motor Failure (EA-20-0089)

URI 05000482/2020002-03 71153

Description:

At 1:48 p.m., on June 25, 2020, control room operators noticed indicating lights were no longer lit for the train B emergency diesel generator supply fan. The licensee investigated the condition and found the supply breaker for the supply fan open and tripped. The train B emergency diesel generator and supply fan were declared inoperable at 2:00 p.m. Subsequently, the licensee performed troubleshooting and determined that the breaker trip was most likely the result of a fault in the fan motor.

During a June 28, 2020, teleconference, the licensee requested the NRC to exercise enforcement discretion for an unanticipated temporary noncompliance with Technical Specification 3.8.1 in order to avoid an unnecessary plant transient. The licensee presented the timeline to complete repairs and testing of the fan motor to restore the emergency diesel generator to operable status, demonstrating that the necessary work and testing could not be completed within the 72-hour completion time of Required Action B.4.1 of Technical Specification 3.8.1, which would otherwise have expired at 2:00 p.m. on June 28, 2020.

On June 28, 2020, the staff verbally approved a request by the licensee to allow an additional 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> to complete repairs and testing for the faulted supply fan motor and restore the train B emergency diesel generator to operable status by 12:00 p.m. on June 29, 2020. The train B emergency diesel generator and supply fan were declared operable at 4:25 a.m. on June 29, 2020. Subsequently, the licensee submitted its written request for enforcement discretion in Letter WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating, dated June 30, 2020 (ADAMS Accession Number ML20182A428). The Notice of Enforcement Discretion approval letter from the NRC staff was sent to the licensee on July 1, 2020 (ADAMS Accession Number ML20183A431).

The inspectors reviewed the licensees equipment performance evaluation and hardware failure analysis, documented in Condition Report CR 143388, for the EDG B supply fan motor failure and noted the following:

  • The likely cause of the fault was a breakdown of a Nomex phase insulation strip located between adjacent phase groups on one of the stator winding end-turns.

Photographs showed a very localized area wherein the damage could be observed.

This was attributed to Nomex insulation being improperly trimmed upon motor assembly because several improperly trimmed strips were identified during the motor inspection. Inspectors noted that the visual evidence showed the fault was very small in size, and no additional factors were identified that could have caused the short between the phases.

  • A careful inspection of the coils was performed to assess if the windings operated at excessive temperature prior to the motor trip. Additionally, allowing for the carbon contamination created during the fault, the condition of the strand coating appeared to be normal and not indicative of windings that have operated at excessive temperature.

The inspectors reviewed the preventive maintenance records available for the fan and the Electric Power Research Institute (EPRI) Electric Motor Predictive and Preventive Maintenance Guide, NP-7502. The preventive maintenance measures the condition of the motor through winding analysis and megger. The preventive maintenance records showed satisfactory results for the last winding analysis performed in October of 2018. The EPRI Electric Motor Predictive and Preventive Maintenance Guide, NP-7502, did indicate some maintenance activities that could have potentially identified the incorrectly trimmed Nomex strips (e.g., motor disassembly and inspection). However, these inspections were not listed as part of the recommended tests for the type of motor for the EDG B supply fan.

Additionally, the inspectors reviewed the vendor technical manual to assess whether any recommended maintenance would have addressed or prevented the fault from occurrence.

The manual did not outline any maintenance requirement directly tied to the stator windings which could reasonably have prevented the short from occurring.

The inspectors concluded that the failure was not within the ability of the licensee to foresee and correct given the established parameters for preventive maintenance for the fan motors, the previous preventive maintenance results, and the failure uniquely occurring after more than 30 years of equipment service. Therefore, no performance deficiency was identified for the failure of EDG B supply fan motor. This disposition closes URI 05000482/2020002-03.

Corrective Action Reference(s): Condition Report CR-143388

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 13, 2020, the inspectors presented the Public Radiation Safety - Remote inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.
  • On July 30, 2020, the inspectors presented the biennial operator requalification inspection results to Mr. A. Servaes, Requalification Training Lead Instructor, and other members of the licensee staff.
  • On August 13, 2020, the inspectors presented the Emergency Preparedness Program inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.
  • On September 24, 2020, the inspectors presented the Public Radiation Safety - Onsite inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.
  • On October 5, 2020, the inspectors presented the integrated inspection results to Mr. J. McCoy, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

Condition Reports 144319

71111.01

Drawings

C-K209

E.S.W.S Electrical Manholes Plans Sections and Details

71111.01

Miscellaneous

14-5262 F-02

Local Intense Precipitation FLO-2D Model Refinement

71111.01

Miscellaneous

69461-C-001

Probable Maximum Precipitation Calculation

71111.01

Miscellaneous

69461-C-002

Peak Discharge Calculation

71111.01

Miscellaneous

69461-C-003

Water Surface Elevation Calculation

71111.01

Miscellaneous

Breach

Authorization

Permit

BAP-20-0143, BAP-20-0144

71111.01

Miscellaneous

WCRE-35

Boundary Matrix

71111.01

Procedures

AI 14-006

Severe Weather

71111.01

Procedures

AP 10-104

Breach Authorization

71111.01

Procedures

AP 26C-004

Operability Determination and Functionality Assessment

71111.01

Procedures

OFN SG-003

Natural Events

71111.01

Procedures

OFN SG-048

Flash Flood Warning

71111.04

Calculations

AN-02-010

Gothic Model of EDG Room Temperature

0, CN 1,

CN 2, CN 3

71111.04

Calculations

GK-370

Battery Room Hydrogen Concentration

71111.04

Calculations

GK-M-001

Cooling and Heating Load Calculation for Control Room

HVAC System Capabilities during Normal Plant Operation

and Accident Conditions

4, CN 1

71111.04

Calculations

GK-M-014

Cooling and Heating Load for Control Building Class 1E

Electrical Equipment Areas during Action Conditions - Train

A

0, CN 7

71111.04

Calculations

GK-M-015

Cooling and Heating Load for Control Building Class 1E

Electrical Equipment Areas during Action Conditions - Train

B

0, CN 6

71111.04

Calculations

XX-E-006

AC System Analysis

71111.04

Corrective Action

Documents

Condition Reports 144296, 138402, 138017, 138036, 138056, 2004-1444,

28399, 032129

71111.04

Corrective Action

Condition Reports 144827

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Resulting from

Inspection

71111.04

Drawings

E-1F9915

Design Basis Document for OFN RP-017, Control Room

Evacuation

71111.04

Drawings

KD-7496

One Line Diagram

71111.04

Drawings

M-12GM01

Piping and Instrumentation Diagram Diesel Generators

Building HVAC

71111.04

Engineering

Changes

CP 020350

SGK05A/B Fuse Replacement

71111.04

Engineering

Changes

CP 09879

Replace SGK04A/B and SGK05A/B Air Conditioning Units

71111.04

Procedures

AP 15C-004

Preparation, Review and Approval of Procedures,

Instructions and Forms

53A

71111.04

Procedures

CKL AL-120

Auxiliary Feedwater Normal Lineup

71111.04

Procedures

CKL EF-120

Essential Service Water Valve, Breaker and Switch Lineup

55A

71111.04

Procedures

CKL EM-120

Safety Injection System Lineup Checklists

71111.04

Procedures

EMG C-0

Loss of All AC Power

71111.04

Procedures

OFN NB-030

Loss of AC Emergency Bus NB01 (NB02)

71111.04

Procedures

OFN RP-017

Control Room Evacuation

71111.04

Procedures

SYS AP-122

Non-Safety Aux Feed Pump Operation

71111.04

Procedures

SYS GK-123

Control Building A/C Units Startup and Shutdown

71111.04

Procedures

SYS KU-121

Energizing NB01 from Station Blackout Diesel Generators

71111.04

Procedures

SYS KU-122

Energizing NB02 from Station Blackout Diesel Generators

71111.04

Procedures

SYS KU-124

SBO Generator Local or Manual Operations

71111.04

Work Orders

19-455924-001, 19-455924-002, 12-355289-000, 12-

258879-002, 16-414781-208, 16-414781-160, 16-417277-

000

71111.05

Procedures

AP 10-106

Fire Preplans

71111.05

Procedures

AP-10-100

Fire Protection Program

71111.05

Procedures

OFN KC-016

Fire Response

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.07A

Miscellaneous

Final Report containing the results of the May 2020

Hydrographic Survey and the Engineering Report for the

Wolf Creek Generating Station UHS Reservoir & ESWS

Intake Channel

06/19/2020

71111.07A

Procedures

STN MT-005

Ultimate Heat Sink Reservoir and Essential Service Water

Intake Channel Sedimentation Surveillance

71111.11B

Miscellaneous

Week 1 and 2 Written Examinations

71111.11B

Miscellaneous

Week 1, 2, 3, and 4 Operating Examinations

71111.11B

Miscellaneous

Simulator BOL, MOL, and EOL Testing

Cycle 23

71111.11B

Miscellaneous

Simulator Transient Tests

Cycle 23

71111.11B

Miscellaneous

Operator Medical Records

71111.11B

Miscellaneous

Simulator Discrepancy Report for Open and Closed Items

71111.11B

Miscellaneous

Operator Remediation Plans

71111.11B

Procedures

AI 30B-015

Licensed Operator Requalification Guidelines

71111.11Q Procedures

STN SF-001

Control Rod Parking

21A

71111.11Q Procedures

STS SF-001

Control and Shutdown Rod Operability Verification

71111.12

Corrective Action

Documents

Condition Reports 141819, 76409, 103937, 139229, 122880, 74985, 132268,

29008, 138017, 132693, 132824, 133046

71111.12

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 144115

71111.12

Drawings

E-13GK13A

Schematic Diagram Class 1E Electrical Equipment A/C Unit

71111.12

Drawings

M-622.1A-00001

SKG05A SKG05B Air Conditioner Refrigeration Schematic

71111.12

Engineering

Changes

CCP 09561

Eval of Replacement Parts f/Capacitor Tower, and

Transformers

71111.12

Engineering

Changes

CCP 09898

Rodent Proof No. 7 Transformer

71111.12

Miscellaneous

PIR 1999-1886, 2000-2462

71111.12

Miscellaneous

13-0635-TR-001

Failure Analysis of a Control Room Refrigerant Sensing Line

71111.12

Miscellaneous

QH-2020-2054

20 Maintenance Rule Program (a)(3) Assessment Report

at Wolf Creek Generating Station

71111.12

Miscellaneous

RER 2015-012

Pre-planned Reactor Trip to Start RF20

71111.12

Miscellaneous

WCNOC-19-0030

Transformer Wildlife Cover Replacement

1/28/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Procedures

AI 28B-005

Evidence and Action Matrix

71111.12

Procedures

AP 23M-001

WCGS Maintenance Rule Program

71111.12

Procedures

GEN 00-004

Power Operation

94A

71111.12

Procedures

GEN 00-005

Minimum Load to Hot Standby

71111.12

Procedures

MPE GK-003

Control Room and Class 1E A/C Units Preventive

Maintenance Activity

71111.12

Work Orders

19-448848-008, 19-451912-000, 19-451913-000,

19-451914-000

71111.13

Corrective Action

Documents

Condition Reports 144171, 144198, 144497

71111.13

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 144118

71111.13

Drawings

J-12EN03

Control Logic Diagram

71111.13

Miscellaneous

WCRE-34

Fourth 10-year Interval Inservice Testing Basis Document

71111.13

Miscellaneous

WCRE-35

Boundary Matrix

71111.13

Procedures

AI 22C-013

Protected Equipment Program

71111.13

Procedures

ALR 00-048B

Spray Additive Tank Level Low

71111.13

Procedures

AP 10-104

Breach Authorization

71111.13

Procedures

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

71111.13

Procedures

AP 22C-008

Qualitative Risk Management

71111.13

Procedures

EMG C-0

Loss of All AC Power

71111.13

Procedures

SYS AP-122

Non-Safety Aux Feed Pump Operation

71111.13

Procedures

SYS GK-201

Mitigating Actions for Inoperable SKG05 Train

71111.13

Procedures

SYS KU-124

SBO Generator Local or Manual Operations

71111.13

Work Orders

20-464389-000

71111.15

Calculations

EF-M-014

UHS Thermal Analysis-Review for Power Rerate

71111.15

Calculations

EF-M-046

UHS Analysis with Initial Lake Temperature Up to 94 F

71111.15

Calculations

FL-13

Auxiliary Building Area 5 Flooding

71111.15

Calculations

LE-M-002

Flood Level in Auxiliary Building Rooms 1206 and 1207 due

to Pipe Break

71111.15

Calculations

NAI-1878-001

Wolf Creek HELB Analysis

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Corrective Action

Documents

Condition Reports 144060, 144061, 144115, 144147, 114645, 067162, 143726,

24822, 131739, 145251

71111.15

Corrective Action

Documents

Resulting from

Inspection

CR

145034, 145210

71111.15

Drawings

E-1F9915

Design Basis Document for OFN RP-017, Control Room

Evacuation

71111.15

Drawings

E-1F9920

Design Basis Document for OFN RP-017A, Hot Standby to

Cold Shutdown From Outside the Control Room Due to Fire

71111.15

Drawings

M-12AL01

Piping and Instrumentation Diagram Auxiliary Feedwater

System

71111.15

Drawings

M-12AP01

Piping and Instrumentation Diagram Condensate Storage

and Transfer System

71111.15

Drawings

M-12EP01

Piping and Instrumentation Diagram Accumulator Safety

Injection

71111.15

Engineering

Changes

DCP 07225

Emergency Makeup Water Requirement for AFW from

ESW/UHS

71111.15

Miscellaneous

BAP-20-0229

Breach Authorization Permit

71111.15

Miscellaneous

EQSD-I

Equipment Qualification Basis Document

71111.15

Miscellaneous

WCRE-35

Boundary Matrix

71111.15

Operability

Evaluations

RER 2020-016

RER to Evaluate the Condition Identified in CR 141891

71111.15

Procedures

ALR 00-127B

ESW VLV to AFW Opening

71111.15

Procedures

AP 15C-003

Procedure Users Guide for Abnormal Plant Conditions

71111.15

Procedures

AP 26A-001

Reportable Events - Evaluation and Documentation

71111.15

Procedures

AP 26C-004

Operability Determination and Functionality Assessment

71111.15

Procedures

GEN 00-006

Hot Standby to Cold

103

71111.15

Procedures

OFN EF-033

Loss of Essential Service Water

71111.15

Procedures

OFN RP-017A

Hot Standby to Cold Shutdown from Outside the Control Due

to Fire

71111.15

Procedures

OFN SG-003

Natural Events

71111.15

Procedures

STS PE-019E

RCS Isolation Check Valve Leak Test

71111.15

Procedures

SYS EJ-120

Startup of a Residual Heat Removal Train

2A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Work Orders

18-442260-000

71111.18

Calculations

DCP 14269

SKG05 Permanent Compensatory Modifications

71111.18

Calculations

GK-M-016

Wolf Creek Control Building Loss of Class 1E A/C Gothic

Room Heat Up Analysis with Installed Crosstie Fans and

Louvers

3, CN 1

71111.18

Corrective Action

Documents

Condition Reports 144171, 122147

71111.18

Miscellaneous

EQSD-I

Equipment Qualification Design Basis Document

71111.18

Procedures

AI 21-016

Operator Time Critical Actions Validation

71111.18

Procedures

ALR 00-019F

ESF SWR RM A Temp HI

71111.18

Procedures

ALR 00-022F

ESF SWR RM B Temp HI

71111.18

Procedures

STN GK-001A

Class 1E Recirculation System Train A Functional Test

71111.18

Procedures

STN GK-001B

Class 1E Recirculation System Train B Functional Test

71111.18

Procedures

SYS Gk-201

SYS Gk-201, Mitigating Actions for Inoperable SGK05 Train

71111.18

Work Orders

16-414781-327, 18-436787-001, 18-436787-000,

16-414781-140, 16-414781-139

71111.19

Corrective Action

Documents

Condition Reports 144224, 144234

71111.19

Miscellaneous

Package Number

057-P0005

Swgelok Stainless Steel Flex Hose

71111.19

Miscellaneous

Package Number

064-P0006

Swagelok Clamp Support

71111.19

Procedures

AP 16E-002

Post Maintenance Testing Development

20A

71111.19

Procedures

AP 24G-001

Dedication of Commercial Grade Items

71111.19

Procedures

AP 29B-002

ASME Code Testing of Pumps and Valves

71111.19

Procedures

MPE GK-003

Control Room and Class 1E A/C Units Preventative

Maintenance Activity

71111.19

Procedures

MPE GK-004

GK Unit Preparation for Work

71111.19

Procedures

MPM EF-001

ESW Pumps Preventive Maintenance Activity

3B

71111.19

Procedures

STN BG-202

Chemical & Volume Control System Valve Test

71111.19

Procedures

STS AL-102

MDAFW Pump B Inservice Pump Test

46A

71111.19

Procedures

STS BG-100A

Centrifugal Charging System A Train Inservice Pump Test

49A

71111.19

Procedures

STS GK-004A

Class 1E A/C Unit Train A Operability Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Procedures

STS KJ-005B

Manual/Auto Start, SYNC and Loading of EDG NE02,

Rev. 65A

71111.19

Procedures

SYS GK-123

Control Building A/C Units Startup and Shutdown

71111.19

Work Orders

18-44961-00, 18-445142-001, 20-460208-000,

18-444957-000, 18-444964-000, 20-462227-001,

20-462230-000, 20-462739-004, 20-462739-006

71111.22

Calculations

EF-M-014

UHS Thermal Analysis-Review for Power Rerate

71111.22

Calculations

GK-M-014

Cooling and Heating Load for Control Building Class 1E

Electrical Equipment Areas during Accident

Conditions - Train A

0, CCN 7

71111.22

Corrective Action

Documents

Condition Reports 131739, 144501

71111.22

Drawings

M-12AL01

Piping and Instrumentation Diagram Auxiliary Feedwater

System

71111.22

Drawings

M-12EF01

Piping and Instrumentation Diagram Essential SVC Water

System

71111.22

Drawings

M-12GK03

Piping and Instrumentation Diagram Control Building

H.V.A.C

71111.22

Drawings

M-1H3311

Heating Ventilating and Air Cond. Control Building

EL. 2000-0 Area 1

71111.22

Drawings

M-1H3411

Heating Ventilating and Air Cond. Control Building

EL. 2016-0

71111.22

Miscellaneous

WCRE-34

Fourth 10-year Interval Inservice Testing Basis Document

71111.22

Procedures

AP 29B-002

ASME Code Testing of Pumps and Valves

71111.22

Procedures

STN PE-037B

ESW Train B Heat Exchanger Flow and DP Trending

2A

71111.22

Procedures

STS AC-001

Main Turbine Valve Cycle Test

71111.22

Procedures

STS AL-102

MDAFW Pump B Inservice Pump Test

46A

71111.22

Procedures

STS EN-100A

Containment Spray Pump A Inservice Pump Test

71111.22

Procedures

STS PE-016A

A Train Class 1E Electrical System A/C Flow Rate

Verification

71111.22

Procedures

SYS EF-200

Operation of the ESW System

71111.22

Procedures

WCOP-02

Inservice Testing Program for Pumps, Valves, and Snubbers

71111.22

Work Orders

19-454589-000, 20-457795-000, 20-464389-001,

20-464289-000, 12-355289-000, 12-258879-002,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

18-442380-000, 17-422888-000, 15-403132-000,

18-447320-000, 20-457635-000, 19-451425-000,

18-447320-000, 18-440206-000, 17-433842-000,

14-383719-047, 20-457806-001, 20-458485-000

71114.02

Corrective Action

Documents

Condition Reports 126533, 132774, 133122, 133901, 141297, 141817, 141938

71114.02

Miscellaneous

IPAWS Design Report Submission

08/06/2019

71114.02

Procedures

EPF 06-019-01

ANS Siren Semi-Annual Maintenance

71114.02

Procedures

EPP 06-019

Alert and Notification System Sirens

9B

71114.02

Procedures

EPP 06-022

Tone Alert Radio Maintenance/Compensating Measures

71114.02

Procedures

EPP 06-024

Alert and Notification System (IPAWS)

71114.02

Procedures

Tool Kit-017

IPAWS Audit Documentation Report

06/22/2020

71114.02

Procedures

Tool Kit-024

Tone Alert Radio Audit (2019)

2/05/2019

71114.02

Procedures

Tool Kit-024

Tone Alert Radio Audit (2018)

2/06/2018

71114.02

Work Orders

18-435973-000, 18-443918-000, 19-449079-000,

19-451013-000, 19-453716-000, 20-461056-000,

20-461057-000

71114.03

Corrective Action

Documents

Condition Reports 133969, 134981, 135448, 136067, 136079, 138061, 138364,

138374, 142423, 142567, 142630, 143612

71114.03

Miscellaneous

Quarterly Callout Test Reports (3Q/2018 through 2Q/2020)

71114.03

Miscellaneous

RA 12-0130

Wolf Creek On-Shift Staffing Analysis Report

2/12/2012

71114.03

Miscellaneous

RA 19-0092

Shift Staffing Analysis, Revision 1

09/17/2019

71114.03

Procedures

AP 17C-028

Emergency Response Duties and Responsibilities

71114.03

Procedures

EPP 06-015

Emergency Response Organization Callout

71114.03

Procedures

Tool Kit-011

Callout Drill Guidance

03/2020

71114.04

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 144455

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: AP 06-002 IPAWS, Rev. 21 01/22/2020

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: AP 06-002 Woodson

County Reception Center, Rev. 21

01/08/2020

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: AP 06-002 KDHE/PAGs,

Rev. 21

2/12/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: AP 06-002 Wolf Creek

Joint Media Center, Rev. 21

2/12/2020

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: AP 17C-024 Changes

05/04/2020

71114.04

Miscellaneous

E-Plan Effectiveness Evaluation: EPP 06-024, Rev 0 &

EP 06-022 (Rev 7 - Cancellation)

06/08/2020

71114.04

Procedures

AI 26A-003

Regulatory Evaluations (Other than 10 CFR 50.59)

71114.04

Procedures

AIF 26A-003-02

E-Plan Screening

71114.04

Procedures

AIF 26A-003-03

E-Plan Effectiveness Evaluation

71114.04

Procedures

AP 06-002

Radiological Emergency Response Plan

71114.04

Procedures

AP 06-002

Radiological Emergency Response Plan

71114.04

Procedures

EPP 06-004

Public Information Organization

71114.05

Corrective Action

Documents

Condition Reports 127102, 131852, 132693, 133280, 133576, 134125, 143506,

143512, 144201

71114.05

Corrective Action

Documents

Resulting from

Inspection

Condition Reports 144448, 144452, 144458, 144468

71114.05

Miscellaneous

18-05-EP

Quality Assurance Audit Report: Emergency Preparedness

(EP)

06/20/2018

71114.05

Miscellaneous

18-SA-02

Semi-Annual Drill Report (10-30-2018)

11/15/2018

71114.05

Miscellaneous

19-03-EP

Quality Assurance Audit Report: Emergency Preparedness

06/24/2019

71114.05

Miscellaneous

19-PRE-01

Plume Phase Drill Report (04-24-2019)

05/07/2019

71114.05

Miscellaneous

19-SA-01

Semi-Annual Drill Report (Team B/A, 02/21/2019)

2/25/2019

71114.05

Miscellaneous

20-05-EP

Quality Assurance Audit Report (Emergency Preparedness)

06/17/2020

71114.05

Miscellaneous

GE1135665

20 HP-01 Semi-Annual HP Drill

06/22/2020

71114.05

Miscellaneous

RA 12-0126

Evacuation Time Estimates for Wolf Creek Generating

Station

2/19/2012

71114.05

Miscellaneous

RA 19-0096

Letters of Agreement (2019 Updates for Emergency Plan)

09/22/2019

71114.05

Procedures

ALR 00-062B

Alarm Response Procedure: Area Rad Hi

11A

71114.05

Procedures

AP 06-004

Equipment Important to Emergency Response

8, 10

71114.05

Procedures

AP 17C-024

Emergency Planning Responsibilities

71114.05

Procedures

AP 20A-003

QA Audit Requirements, Frequencies and Scheduling

29, 32

71114.05

Procedures

AP 26C-004

Operability Determination and Functionality Assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Procedures

APF 06-002-02

Emergency Action Levels Technical Bases

0B

71114.05

Procedures

APF 06-002-03

EAL Classification Matrix

0B

71114.05

Procedures

EPF 06-018-11

Technical Support Center Inventory Checklist

3Q/2019

71114.05

Procedures

EPF 06-018-12

Emergency Operations Facility Inventory Checklist

2Q/2019

71114.05

Procedures

EPF 06-018-22

Emergency Planning Decontamination Kit Inventory

Checklist

2Q/2020

71114.05

Procedures

EPF 06-18-01

Wolf Creek Joint Media Center Inventory Checklist

1Q/2020

71114.05

Procedures

EPP 06-002

Technical Support Center Operations

71114.05

Procedures

EPP 06-003

Emergency Operations Facility Operation

71114.05

Procedures

EPP 06-006

Protective Action Recommendations

71114.05

Procedures

EPP 06-009

Drill and Exercise Requirements

11A

71114.05

Procedures

Tool Kit-025

Tracking Letters of Agreement

03/19/2020

71114.05

Procedures

Tool Kit-041

Evacuation Time Estimate Update (for 2018)

2/14/2018

71114.05

Procedures

Tool Kit-041

Evacuation Time Estimate Update (for 2019)

2/14/2019

71114.05

Self-Assessments QH-2018-1775

Diablo Canyon BDB Scenario [Benchmark Trip]

01/08/2019

71114.05

Self-Assessments QH-2019-1788

Wolf Creek EP Exercise Readiness Assessment

11/06/2019

71114.05

Self-Assessments QH-2020-1976

ADS Audit

2/19/2020

71114.05

Work Orders

WO 20-452882-

000

VTAHUC-1 Repair Refrigerant Leaks

07/29/2020

71114.05

Work Orders

WO 20-461282-

000

Troubleshoot SDRE0033 Control Room High Radiation

Monitor

04/01/2020

71114.05

Work Orders

WO 20-463701-

000

Meteorological Tower - 60 meter RTD Probe A

06/25/2020

71114.06

Corrective Action

Documents

AP 06-002

Radiological Emergency Response Plan

71114.06

Procedures

AP 06-003

Severe Accident Management

71114.06

Procedures

APF 06-002-02

Emergency Action Levels Technical Bases

0B

71124.05

Calibration

Records

Detector 1

Activity, Channel, and FWHM for 122, 778, and 1408 keV

07/09/2020

71124.05

Calibration

Records

Detector 1

Background

07/09/2020

71124.05

Calibration

Records

Detector 5

Activity, Channel, and FWHM for 122, 778, and 1408 keV

07/09/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.05

Calibration

Records

Detector 5

Background

07/09/2020

71124.05

Calibration

Records

iSOLO

Alpha Efficiency Control Chart

07/09/2020

71124.05

Calibration

Records

LSC 1604

HIDEX 300SL Unquenched and C-14 Control Charts

07/09/2020

71124.05

Calibration

Records

Purchase Order

Number 544358

Sorrento Electronics Certification of Calibration-

Rework/Repair Certificate of Conformance (Sales Order

Number 2955357, Packing Slip Number 5660)

11/07/1991

71124.05

Calibration

Records

WC 011075

J.L. SHEPHERD Calibrator (Model 89) Calibration/Source

Verification

2/18/2019

71124.05

Calibration

Records

WO 18-441590-

000

Channel Calibration Steam Generator 'D' Radiation Monitor

ABRE0111 (Electronics Portion)

08/05/2019

71124.05

Calibration

Records

WO 18-441913-

000

Radwaste Exhaust Particulate Radiation Monitor GHRE0022

2/212019

71124.05

Calibration

Records

WO 18-443187-

000

Channel Calibration Containment Building Area Radiation

Monitor SDRE0042.

08/27/2019

71124.05

Calibration

Records

WO 18-445146-

000

Channel Calibration Steam Generator 'D' Radiation Monitor

ABRE0111 (Calibration Source Drop)

09/28/2019

71124.05

Calibration

Records

WO 18-447055-

000

Channel Calibration Spent Fuel Pool Criticality Monitor Area

Radiation Monitor SDRE0038.

07/25/2019

71124.05

Corrective Action

Documents

Condition Reports 126075, 126110, 126847, 127077, 127450, 127693, 127946,

28062, 129280, 129444, 131150, 131481, 131481, 132346,

2680, 133314, 134482, 134554, 134714, 135455, 137616,

138082, 138565, 139461, 139500, 139868, 139956, 139978,

140048, 140416, 140667, 140667, 140716, 141982, 143534

71124.05

Miscellaneous

2019 Results of Radiochemistry Cross Check Program

05/10/2019

71124.05

Miscellaneous

20 Results of Radiochemistry Cross Check Program

05/08/2020

71124.05

Miscellaneous

2018 Results of Radiochemistry Cross Check Program

05/11/2018

71124.05

Miscellaneous

2-HPE-002

Eckert & Ziegler Certificate of Calibration - Standard

Reference Source: Americium-241, Source Number AC-

9019

09/05/2013

71124.05

Miscellaneous

17-CHL-001

Eckert & Ziegler Certificate of Calibration - Standard

Reference Source: 47 mm Diameter Simulated Filter in Snap

04/01/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Falcon Petri, Source Number 105767

71124.05

Miscellaneous

17-CHL-004

Eckert & Ziegler Certificate of Calibration - Standard

Reference Source: Face Loaded Low Metal F&J Charcoal

Cartridge, Source Number 105764A

04/01/2017

71124.05

Miscellaneous

19-CHL-011

Eckert & Ziegler Certificate of Calibration - Standard

Reference Source: Simulated Gas in 130G GA-MA Gas

Beaker, Source Number 112298

04/01/2019

71124.05

Miscellaneous

19-CHL-013

Eckert & Ziegler Certificate of Calibration - Standard

Reference Source: Face Loaded F&J Low Metal Charcoal

Cartridge, Source Number 112300

04/01/2019

71124.05

Procedures

AP 23M-001

WCGS Maintenance Rule Program

71124.05

Procedures

EDI 23M-010

Engineering Desktop Instruction: Determination of

Structures, Systems and Components Within the Scope of

the Maintenance Rule

71124.05

Procedures

EDI 23M-020

Engineering Desktop Instruction: Determining the Safety

Significance of Structures, Systems and Components Within

the Scope of the Maintenance Rule

71124.05

Procedures

EDI 23M-050

Equipment Evaluation for Maintenance Rule

71124.05

Procedures

RPP 01-405

RP Instrument Program

35A

71124.05

Procedures

RPP 06-103

Ludlum 9-4 Calibration

71124.05

Procedures

RPP 06-113

Mirion Telepole Calibration

71124.05

Procedures

RPP 06-121

Ludlum 177 Calibration

71124.05

Procedures

RPP 06-319

SAM11 Calibration

71124.05

Procedures

RPP 06-707

Calibration of WBC Detectors Using ORTEC Renaissance

Software

71124.06

Corrective Action

Documents

Condition Reports 127292, 127659, 127812, 128430, 132237, 136969, 137397,

138456, 138964, 143150

71124.06

Miscellaneous

2019 Land Use Census

01/15/2020

71124.06

Miscellaneous

2018-136

Containment Purge Release Permit

10/10/2018

71124.06

Miscellaneous

2019-003

Gas Decay Tank Release Permit - GDT-7

01/03/2019

71124.06

Miscellaneous

2019-044

Steam Generator Blowdown to the Lake Release Permit

09/10/2019

71124.06

Miscellaneous

2019-052

Unit Vent Gas Release Permit

04/16/2019

71124.06

Miscellaneous

2019-066

Turbine Building Sump to Oily Waste Release Permit

11/4/2019

71124.06

Miscellaneous

2019-071

THF04A Release Permit

11/20/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.06

Miscellaneous

2019-119

Radwaste Vent Gas Release Permit

09/19/2019

71124.06

Miscellaneous20-013

THF04B Release Permit

03/16/2020

71124.06

Miscellaneous20-034

Unit Vent Gas Release Permit

03/10/2020

71124.06

Miscellaneous20-043

Containment Purge Release Permit

03/28/2020

71124.06

Miscellaneous20-065

Radwaste Vent Gas Release Permit

05/14/2020

71124.06

Miscellaneous

APF 02-007-20-

Primary to Secondary LEAKAGE Detection Instrumentation

NONFUNCTIONAL

2/02/2019

71124.06

Miscellaneous

APF 02-007-22-0

Condenser Air Removal System Discharge to Turbine

Building

2/02/2019

71124.06

Miscellaneous

RA 19-0051

2018 Annual Radioactive Effluent Release Report

04/30/2019

71124.06

Miscellaneous

RA 20-0040

2019 Annual Radioactive Effluent Release Report

04/26/2020

71124.06

Procedures

AI 07B-032

Chemistry Radioactive Release Reports

7A

71124.06

Procedures

AI 07B-036

Liquid Release Permits Using RADEAS

71124.06

Procedures

AI 07B-037

Unit and Radwaste Vent Permits Using RADEAS

71124.06

Procedures

AI 07B-038

Containment Purge Permits Using RADEAS

71124.06

Procedures

AI 07B-039

Gas Decay Tank Permits Using RADEAS

71124.06

Procedures

AP 02-008

Verification of Analytical Performance

71124.06

Procedures

AP 07B-001

Radioactive Releases

23A

71124.06

Procedures

AP 07B-003

Offsite Dose Calculation Manual

71124.06

Procedures

CHA RC-001

Gross Alpha Measurement

7A

71124.06

Procedures

CHA RC-004

Gamma Isotopic, Total Curie Content and Dose Equivalent

Iodine Determination

71124.06

Procedures

CHS AX-G01

Unit Vent Sampling and/or Exchange of Filters

71124.06

Procedures

CHS RW-G01

Sampling Of The Waste Gas Decay Tanks

71124.06

Procedures

CHS RW-G02

Radwaste Vent Sampling and/or Exchange of Filters

71124.06

Procedures

STN CH-024

Quarterly/Yearly Dose Projections

71124.06

Procedures

STN CH-025

Monthly Composites

71124.06

Work Orders

20000924

Radwaste Vent Sampling and Filter Changeout

09/24/2020

71124.06

Work Orders

200924

Radwaste Vent Sampling and Filter Changeout

09/24/2020

71124.07

Calibration

Records

23

Air Sampler Calibration

06/18/2020

71124.07

Calibration

Records

8366

Air Sampler Calibration

06/29/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Calibration

Records

8404

Air Sampler Calibration

06/29/2020

71124.07

Calibration

Records

8405

Air Sampler Calibration

06/18/2020

71124.07

Calibration

Records

8406

Air Sampler Calibration

06/29/2020

71124.07

Calibration

Records

8411

Air Sampler Calibration

06/18/2020

71124.07

Calibration

Records

WO 19-447849-

000

STS-IC-890A Channel Calibration of Wind Speed

Meteorological Instrumentation

09/10/2019

71124.07

Calibration

Records

WO 19-447856-

000

STS-IC-890B Channel Calibration of Wind Direction

Meteorological Instrumentation

09/12/2019

71124.07

Calibration

Records

WO 19-447862-

000

STS-IC-890C Channel Calibration of 60M 10M Temperature

Instrumentation

09/11/2019

71124.07

Calibration

Records

WO 19-447872-

000

STS-IC-890D Channel Calibration of Sonic Wind Speed

Direction Deviation Meteorological Instrumentation

09/11/2019

71124.07

Calibration

Records

WO 19-453065-

000

STS-IC-890A Channel Calibration of Wind Speed

Meteorological Instrumentation

03/12/2020

71124.07

Calibration

Records

WO 19-453078-

000

STS-IC-890D Channel Calibration of Sonic Wind Speed

Direction Deviation Meteorological Instrumentation

03/12/2020

71124.07

Calibration

Records

WO 19-453086-

000

STS-IC-890C Channel Calibration of 60M 10M Temperature

Instrumentation

03/26/2020

71124.07

Calibration

Records

WO 19-453093-

000

STS-IC-890B Channel Calibration of Wind Direction

Meteorological Instrumentation

03/11/2020

71124.07

Corrective Action

Documents

Condition Reports 126115, 131756, 126077, 128355, 130415, 131943, 134834,

140561, 141427, 141671, 142656

71124.07

Miscellaneous

2018

2018 Annual Radiological Environmental Operating Report,

Appendix A - Interlaboratory Comparison Program Results

04/10/2019

71124.07

Miscellaneous

2018

Annual Radioactive Effluent Release Report, Appendix C,

Onsite Groundwater Protection Program Monitoring

04/30/2019

71124.07

Miscellaneous

2018

2018 Annual Radiological Environmental Operating Report

04/10/2019

71124.07

Miscellaneous

2018

Land Use Census

10/04/2018

71124.07

Miscellaneous

2019

Land Use Census, Revision 1

01/15/2020

71124.07

Miscellaneous

2019

Annual Radioactive Effluent Release Report, Appendix C,

04/26/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Onsite Groundwater Protection Program Monitoring

71124.07

Miscellaneous

2019

2019 Annual Radiological Environmental Operating Report,

Appendix A - Interlaboratory Comparison Program Results

03/26/2020

71124.07

Miscellaneous

2019

2019 Annual Radiological Environmental Operating Report

03/26/2020

71124.07

Procedures

AI 07-007

Onsite Groundwater Protection Program Monitoring

71124.07

Procedures

AI 07B-004

Reporting Requirements of the Radiological Environmental

Monitoring Program

71124.07

Procedures

AI 07B-005

Radiological Environmental Monitoring Program

Implementation

71124.07

Procedures

AI 07B-015

Land Use Census

71124.07

Procedures

AI 07B-033

Annual Radiological Environmental Operating Report

Generation

71124.07

Procedures

AI 07B-034

Radiological Environmental Monitoring Program Air

Sampling

71124.07

Procedures

AP 07B-004

Offsite Dose Calculation Manual (Radiological Environmental

Monitoring Program)

71124.07

Procedures

AP 07B-005

Ground Water Protection Program

71124.07

Procedures

AP 07E-001

Validation of Meteorological Data

71124.07

Procedures

AP 14B-003

Spill and Release Reporting

71124.07

Self-Assessments 20-03-ENV

Quality Assurance Audit Report, Environmental Management 04/22/2020

71124.07

Self-Assessments QH-2019-1854

REMP Review of 2016 through 2018 Wind Direction

06/18/2019

71124.07

Self-Assessments QH-2020-2062

REMP Review of 2017 through 2019 Wind Directions

06/10/2020

71124.08

Corrective Action

Documents

Condition Reports 126106, 127571, 128131, 128132, 128135, 128952, 131721,

2087, 133440, 133445, 136435, 136720, 137239, 138456,

138643, 138857, 139199, 140682, 140683, 140684, 140757,

141279, 141994, 141995, 143223, 143541

71124.08

Corrective Action

Documents

Resulting from

Inspection

Condition Report

145332

71124.08

Miscellaneous

Radioactive Shipment Log: 2018, 2019, 2020

20

71124.08

Miscellaneous

Wolf Creek Sealed Source Surveillance Test

01/13/2020

71124.08

Miscellaneous

Wolf Creek Sealed Source Surveillance Test

07/15/2019

71124.08

Miscellaneous

Wolf Creek Safety Analysis Report - Chapter 11 and 12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.08

Miscellaneous

503910003

Database Update Comparison Report: SFP Filters

01/29/2020

71124.08

Miscellaneous

No. 42

2018 Annual Radioactive Effluent Release Report

04/30/2019

71124.08

Miscellaneous

No. 43

2019 Annual Radioactive Effluent Release Report

04/26/2020

71124.08

Procedures

AP-31A-100

Solid Radwaste Process Control Program

71124.08

Procedures

RPP 02-210

Radiation Survey Methods

49B

71124.08

Procedures

RPP 05-825

J.L. Shepherd Multi-Source Calibration System Operation

71124.08

Procedures

RPP 06-825

J.L. Shepherd Multi-Source Calibration System Calibration

71124.08

Procedures

RPP 07-101

Control of Radioactive Material Management Software and

Data Bases

71124.08

Procedures

RPP 07-110

Solid Radwaste Packaging

71124.08

Procedures

RPP 07-112

Processing Cartridge Filters

71124.08

Procedures

RPP 07-123

Preparation and Shipment of Radioactive Waste and

Material

9A

71124.08

Procedures

RPP 07-124

Physical Security and Transportation Notification

Requirements For Category 1 and 2 Radioactive Material

3A

71124.08

Procedures

RPP 07-140

Mixed Waste Handling, Inspection, and Storage

71124.08

Procedures

RPP 07-212

Requirements of Radioactive Materials Stored Outdoors

71124.08

Procedures

SEC 50-152

Protection of Category 1 and 2 Quantities of Radioactive

Materials

71124.08

Radiation

Surveys

M-20200520-3

Monthly Day 21 - Block Rooms and NRW Storage

05/20/2020

71124.08

Radiation

Surveys

M-20200528-5

Primary RCA Yard

05/28/2020

71124.08

Radiation

Surveys

M-20200529-2

Monthly RCA Yard Survey

05/29/2020

71124.08

Radiation

Surveys

M-20200924-4

Survey of J.L. Shepherd Model 89 Source

09/24/2020

71124.08

Self-Assessments 20-01-RP/PC

QA Audit Report: QA Radiological Protection & Process

Controls Program Audit

03/02/2020

71124.08

Self-Assessments 2020

Quick Hit Assessment: NRC Inspection Procedure 71124.08,

Radioactive Solid Waste Processing and Radioactive

Material Handling, Storage, and Transportation

20

71124.08

Shipping Records 18R05

UN3321, RAM, LSA-II, Class 7, Fissile-Excepted, RQ -

Spent Resin

03/13/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.08

Shipping Records 18R13

UN3321, RAM, LSA-II, Class 7, Fissile-Excepted, RQ -

Concentrates

04/04/2018

71124.08

Shipping Records 19R03

UN3321, RAM, LSA-II, Class 7 - Mixed Bed Resin

2/07/2019

71124.08

Shipping Records 19R07

UN3321, RAM, LSA-II, Class 7, Fissile-Excepted - Spent

Resin

03/02/2019

71124.08

Shipping Records 19R32

UN3321, RAM, LSA-II, Class 7, Fissile-Excepted - Spent

Resin

10/30/2019

71124.08

Shipping Records 19R35

UN3321, RAM, LSA-II, Class 7 - Cartridge Filters

09/14/2019

71124.08

Shipping Records 20R19

UN2910, Radioactive material, excepted package - limited

quantity of material, Class 7

09/22/2020

71151

Calculations

AN-02-010

Gothic Model of EDG Room Temperature

0, CN 1,

CN2, CN3

71151

Corrective Action

Documents

Condition Reports 143388, 144394, 144395

71151

Miscellaneous

DEP & ERO Participation Records for 19-Q4 (19-PRE-EX-03

Team C & 19-IPX Team C)

4Q/2019

71151

Miscellaneous

DEP & ERO Participation Records for 20-Q1 (LO0035801

Rev 2, Performance Evaluation Summary for DEP

Opportunity; 2/12/20220, 2/16/2020, & 2/19/2020)

1Q/2020

71151

Miscellaneous

DEP & ERO Participation Records for 20-2Q (LR464001 - 8

different sessions 3/31/2020 - 5/19/2020; GE1135662 E-

Plan Command & Control Table-Top on 6/10/2020)

2Q/2020

71151

Miscellaneous

EPF 06-019-02

ANS Siren Test Reports (7 Biweekly Tests)

4Q/2019

71151

Miscellaneous

EPF 06-019-02

ANS Siren Test Reports (7 Biweekly Tests)

1Q/2020

71151

Miscellaneous

EPF 06-019-02

ANS Siren Test Reports (6 Biweekly Tests)

2Q/2020

71151

Miscellaneous

WCNOC-163

Mitigating System Performance Index Basis Document

71151

Procedures

AI 26A-004

Emergency Preparedness Performance Indicators

8A

71152

Corrective Action

Documents

Condition Reports 76409, 103937, 121792, 122880, 139229, 141819, 143225,

143227, 143228, 144130

71152

Miscellaneous

13-0635-TR-001

Failure Analysis of a Control Room Refrigerant Sensing Line

71152

Miscellaneous

DECP 020406

Cooper Sensing Line Replacement

71152

Work Orders

20-463555-000, 20-463859-000, 20-463553-000, 20-

463552-00, 20-462739-011, 20-462739-014, 20-462739-

004, 20-462739-007

39