Security Baseline Inspection Report 05000482/2024402
ML24338A271
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/05/2024
From: Jesse Rollins
NRC/RGN-IV/DRSS/PSB
To: Mccoy J
Wolf Creek
Jewett C
References
EPID I-2024-402-0012 IR 2024402
Download: ML24338A271 (1)


Text

December 05, 2024

SUBJECT:

WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2024402

Dear Jaime McCoy:

On November 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2024402

Enterprise Identifier:

I-2024-402-0012

Licensee:

Wolf Creek Nuclear Operating Corporation

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

November 18, 2024, to November 21, 2024

Inspectors:

C. Jewett, Sr Physical Security Inspector

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee did not complete all actions associated with a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP at the time of this inspection.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) January 01, 2023, through November 21,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On November 21, 2024, the inspector presented the security baseline inspection results to Jaime McCoy and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

10022769;

10025375;

10028442;

10029344;

10029461;

10030321;

10031475;

10031585;

10033836;

10034565

Corrective Action

Documents

Resulting from

Inspection

10038041;

10038043;

10038044;

10038091;

10038092;

10038103

Miscellaneous

Physical Security Plan

AI 27-006

Safety/Security Interface

AP 27-004

Controlling Safeguards Information

SEC 01-202A

Personnel Access to the Protected Area

SEC 01-204A

Badge Preparation and Maintenance

SEC 01-206A

Lock and Key Control

SEC 01-207

Vehicle Access Control

SEC 01-208A

Security System Performance Testing

Procedures

SEC 50-020A

Insider Threat

71130.02

Self-Assessments

QH-2024-2708

NRC Security Baseline Inspection readiness Assessment

Checklist IP 71130.02, Access Control

08/15/2024