Notification of Post Approval Site Inspection for License Renewal and Request for Information
ML24352A032
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/17/2024
From: James Drake
NRC/RGN-IV/DORS/EB2
To: Reasoner C
Wolf Creek
References
IR 2025010
Download: ML24352A032 (1)


Text

December 17, 2024 Cleve Reasoner, Chief Executive Officer and Chief Nuclear Officer Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839

SUBJECT:

WOLF CREEK - NOTIFICATION OF POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL AND REQUEST FOR INFORMATION (05000482/2025010)

Dear Cleve Reasoner:

During the weeks of January 20 and February 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval License Renewal Phase 2 Site Inspection, Phase 2, for License Renewal for your facility. Five inspectors will perform this two-week inspection in accordance with the NRC Inspection Procedure 71003. This inspection focuses on activities associated with license renewal: implementation of aging management programs, regulatory commitments, as well as any tests or inspections of structures, systems, or components.

To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all these documents are up to date and complete to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

Please provide this information electronically to the lead inspector. The information request has two groups:

The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection.

This information should be provided to the lead inspector by January 13, 2025.

The second group includes additional information required for the team to review the selected activities. This information should be available to the team on January 20, 2025. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

C. Reasoner 2

The schedule for the inspection is as follows:

Offsite Preparation Week: January 13 - 17, 2025 Onsite Inspection Weeks: January 20 - 24 & February 3 - 7, 2025 PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: T6 A10M, the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jim Drake, Senior Reactor Inspector Engineering Branch 2 Division of Operating Reactor Safety Docket No. 50-482 License No. NPF-42

Enclosure:

1.

License Renewal Phase 2 Document Request cc w/ encl: Distribution via LISTSERV Smith, Chris signing on behalf of Drake, James on 12/17/24

ML24352A032 X SUNSI Review ADAMS:

Non-Publicly Available X Non-Sensitive By: WCS2 X Yes No X Publicly Available Sensitive OFFICE SRI:DORS:EB2 NAME JDrake SIGNATURE

/WCS2/

DATE 12/17/24

Enclosure License Renewal Phase 2 Document Requests Inspection Report: 05000482/2025-010 Onsite Inspection Dates:

January 20 - 24, 2025; and February 3 - August 7, 2025 Inspection Procedure:

IP 71003 Post-Approval Site Inspection for License Renewal Phase 2 The documents and information requested below should generally be made available to the inspection team for the team's use both on-site and off-site. Electronic format is the preferred media, preferably in a searchable format. Electronic media should contain descriptive names and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology. If electronic media is made available via an internet based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's office. Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such, this document request is not meant to imply that any specific plant is required to have all of the listed documents. In addition, your plant specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below.

As discussed in our November teleconference in preparation for this inspection, the station has Aging Management (AMP) Notebooks as a matter of course, and are being updated. Note that the following AMPs and associated commitments were closed in a prior NRC inspection, and that information need not be provided: Buried Piping and Tanks Inspections, Flux Thimble Tube Inspection, Electrical Cables and Connections Used in Instrument Circuits, and Electrical Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements.

A.

Documents requested by January 13, 2025 (prior to on-site inspection) 1.

Provide an excel spreadsheet list of your license renewal commitments. Include the completion status of each. For those not yet complete, please provide an estimated completion date. If a commitment is not associated with an aging management program, please leave that field blank.

2.

Provide an excel spreadsheet list of your aging management programs. Include the completion status of each. For incomplete programs, please provide an estimated completion date. For ongoing/recurring programs, please provide the most recent inspection results.

3.

Provide copies of the AMP/TLAA program basis document notebooks for each aging management program, and a listing with status of the tracking items for each. This information should contain your license renewal commitments, associated aging management programs, closure documentation, implementing documents/procedures,

2 and CRs. For those activities not yet complete, please provide an estimated completion date.

4.

Provide current electronic copies of Chapter 18, Appendix A, of the Updated Safety Analysis Report (USAR) Supplement, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual (TRM). Please have the entire USAR available upon request.

5.

Provide copies of any internal/external self-assessments, gap analyses, and associated corrective action documents generated in preparation for the inspection.

6.

A list of USAR updates performed since the last license renewal inspection (performed in October 2022).

7.

A list of License Amendment Requests submitted since the last license renewal inspection (performed in October 2022).

8.

A list of license renewal commitment changes, or Regulatory Commitment Management System (RCMS), since the last license renewal inspection (performed in October 2022).

9.

A list of any documents associated with 10 CFR 54.37(b), if unique from requests #3 -

  1. 5 above.

B.

Documents requested for on-site inspection 1.

Contact information for selected inspection samples to facilitate inspector observations and questions.

C.

Documents requested through the inspection 1.

Copies of any corrective action documents generated because of the teams questions or queries during this inspection. Please make this a separate folder in IMS Certrec.

2.

Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

3 Inspector Contact Information:

Jim Drake (Lead)

Senior Reactor Inspector 817-200-1558 james.drake@nrc.gov Sam Graves Senior Reactor Inspector 817-200-1102 samuel.graves@nrc.gov Chris Smith Reactor Inspector 817-200-1095 chris.smith@nrc.gov James Mejia Josh Talavera Mailing Address:

Reactor Inspector 817-200-1589 james.mejia@nrc.gov Reactor Inspector 817-200-1435 joshua.talavera@nrc.gov U.S. NRC, Region IV Attn: Jim Drake 1600 East Lamar Blvd.

Arlington, TX 76011-4511