Responds to 781201 Request for List of Plant Mod Being Made to Implement the Fire Hazard Analysis Rept.Fire Extinguishers Being Added to 13 Rooms & Wet Sprinkler or Spray Sys Being Added or Upgraded
ML20062F409
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/12/1978
From: Roe L
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
TAC-10985, NUDOCS 7812180206
Download: ML20062F409 (2)


Text

.  %

/# }

i

/ MEDO Docket No. 50-346 N EDISON Operating 1;icense No. NPF-3 y/

LOWELL E. ROE Serial No. 473 l j'7llQ,,

14193 259-$242 December 12, 1978 Director of Nuclear Reactor Regulation

  • Attention: Mr. Robert W. Reid, Chief -

Operating Reactor Branch No. 4 Division of Operating Reactors U. S. Nuclear Regulatory Commission -

Washington, D. C. 20555

Dear Mr. Reid:

As requested by your Mr. Guy Vissing to our Mr. C. R. Domeck in a telephone conversation on December 1, 1978, below are listed the plant modifications being made at the Davis-Besse Nuclear Power Station Unit No. I to implement.the Fire Hazard Analysis Report:

1. Fire extinguishers are being added to 13 rooms and areas
2. Wet sprinkler or spray systems are being added and/or upgraded in 12 rooms and areas
3. Water curtains are being added in 3 rooms
4. Concrete curbing is being installed in 5 roo=s
5. Hose statiens are being installed in 8 areas
6. Alar =s are being added in 2 battery rooms
7. Door fire ratings are being upgraded in 5 places
8. Fire rated dampers are being added in 3 loc 2tions
9. Structura1 steel fire proofing is being added in 3 areas
10. Fire detection systems are being installed and/or modified in 60 areas
11. Portable radio co==unication is being added in 33 rooms or areas
12. Eight hour emergency battery pack lights are being added to 57 rooms and areas to Ob O THE TCLECO ED:SCN CCMPANY ECISCN PLAZA 300 MADISCN AVENUE TCLECO, CHIO 43S52 l 7812180SoG f ________

-. .= ~ .

-- a i

.t

13. Kaowool is being installed around conduit in 6 areas
14. - The hydrogen line through the componsat cooling water heat exchanger room is being relocated to an area not containing safety-related equipment. -

Yours very truly,

/