Forwards Revised Inservice Insp Pump & Valve Program, Reflecting Results Discussed at 830329 Meeting
ML20073S268
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/29/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20073S270 List:
References
939, TAC-10985, TAC-11316, NUDOCS 8305060519
Download: ML20073S268 (2)


Text

e n.

.k 9

A Docket No. 50-346 yotsoo License No. NPF-3 RicHAR P. Cnoust Serial No. 939 Vce Presdent

% clear April 29, 1983 PRhbChk[ STAFF RA ENF D/RA SCS A/RA RAD DPRP SLO Director of Nuclear Reactor Regulation DRMA 4C h06uz0 Attention:

Mr. John F. Stolz oRxse Operating Reactor Branch No. 4 g +-j yi 1

Division of Operating Reactors O

ML United States Nuclear Regulatory Commission OL l FI LI7E Washington, D.'C.

20555 Gentlemen:

This letter is to transmit a revision to the Inservice Inspection Pump and Valve Program for the Davis-Besse Nuclear Power Station Unit No. 1, which was submitted by letter on May 15, 1980 (Serial No. 616).

Please find attached five (5) copies of the revised pages of the Inservice Inspection Pump and Valve Program. The changes made in this revision reflect the results of the review meetings between The Toledo Edison Company and the United States Nuclear Regulatory Commission Region III held on March 29, 1983, at Glen Ellyn, Illinois.

As agreed to during the review meeting, Toledo Edison is submitting only those specific Relief Requests which needed revision.

See Enclosure One (1) for a synopsis of the changes being made to Relief Requests, Enclosure Two (2) for copies of the Relief Requests that were changed, Enclosure Three (3) for copies of the specific changes to the Pump and Valve Test Program, and Enclosure Four (4) for additions to Test Code Frequencies, t

Any additions that become necessary, due to modifications and changes to this program during the course of the remainder of the 120 month interval, which do not meet the code testing requirements, will be implemented as needed. A fully documented notification to the NRC will be placed on the docket subsequent to the implementation of approved changes.

Very truly yours, sf W RPC:RFP:JDE:nlf encl.

cc: DB-1 NRC Resident Inspector Pete Wohld, NRC Region III

_ A DO n t y 830$060519 830429

""*"U PDR ADOCK 05000 M

(gg THE TOLEDO ED! SON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. CHIO 43652 l

t

_ ___..___ _._.. _.. _ _ _ _ =

l-ENCLOSURE 1 J

O i

i k

1, i

3 i

a I

i k

I 1

I i

5 l

h 6

-...