|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases 1999-10-01
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20062C1901990-10-24024 October 1990 Advises That Commissioner Jr Curtiss Will Visit Plant on 901113 to Tour Facility & Meet W/Lilco Mgt & Operating Personnel to Review General Status of Activities at Plant. W/Certificate of Svc.Served on 901024 ML20244A5201989-05-16016 May 1989 Responds to Extending Invitation to Appear at 890518 Hearing.Economic Impact of Settlement Agreement Between Lilco & State of Ny Outside Jurisdiction of NRC ML20247A2001989-03-21021 March 1989 Responds to 890307 & 09 Ltrs Re Hearing to Consider Approval of Agreement Between Util & Long Island Power Authority to Transfer Plant to Long Island Power Authority ML20235U6211989-03-0202 March 1989 Responds to Requesting NRC Impose Moratorium on All Applications Submitted by Util & Thoroughly Review All Info Previously Submitted by Util to Determine Veracity, Accuracy & Authenticity ML20155H4811988-10-14014 October 1988 Advises That 881017 Meeting Between NRC & Lilco Not Cancelled as Result of ALAB-902.Supporting Documentation, Including Unexecuted Affidavit of Am Madsen & Certificate of Svc Encl ML20151C9181988-04-0707 April 1988 Responds to to L Zech Expressing Concern for Adequacy of Electric Energy Supply for Long Island,Ny & Questions Re Whether NRC Could Accelerate Licensing of Plant.Stated Info on Licensing Schedule Sent to Congress ML20148G8071988-03-22022 March 1988 Notifies That NRC Does Not Have Access to Compilations of Data or Comparison Surveys on Issue of Possible Role Conflicts of Util Employees as School Bus Drivers in Event of Emergency at Plant.Related Correspondence ML20150C7111988-03-14014 March 1988 Advises That Info Responsive to 880309 Interrogatories Re Hosp Evacuation Time Estimates Contained in Urbanik 880304 Deposition.Related Correspondence IA-87-869, Final Response to FOIA Request for Documents Re Nov 1987 Resignation of Judge Mb Margulies from Naslp.Forwards Apps B & C Documents Which Are Also Available in PDR1988-02-29029 February 1988 Final Response to FOIA Request for Documents Re Nov 1987 Resignation of Judge Mb Margulies from Naslp.Forwards Apps B & C Documents Which Are Also Available in PDR ML20196F7791988-02-29029 February 1988 Final Response to FOIA Request for Documents Re Nov 1987 Resignation of Judge Mb Margulies from Naslp.Forwards Apps B & C Documents Which Are Also Available in PDR ML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C ML20216H6991987-06-17017 June 1987 Forwards Guidelines for Accompaniment on Team Insp Reviewing Training & Qualification Per .Nrc Acknowledges Sholly as Designated Representative Accompanying NRC Inspectors to Observe Insp ML20215M0671987-05-0707 May 1987 Requests Addl Info Re Portion of Direct Testimony of Dt Hartgen & Rc Millspaugh in OL-3 Proceeding.Info Requested Includes Similar Info on Cars Re Traffic Assignment Model. Related Correspondence ML20206B4321987-04-0303 April 1987 Responds to Recipients Requesting NRC to Disqualify Itself from Participating in Facility Licensing Hearings & for Author to Appear at Suffolk County Special Session.Disagreements Already Discussed in 870323 Response ML20205L9101987-03-23023 March 1987 Responds to 870310 Joint Ltr Requesting Disqualification of Author & NRC from Participation as Party in Proceeding. Author Has No Authority to Disqualify Himself or NRC from Performing Public Duties ML20237C9261987-03-17017 March 1987 Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys (Erds).Daily Status Repts Cannot Be Provided Due to Limitations on NRC Computer Sys.Info on Status of SPDS for State Plants Encl ML20215G2071987-02-20020 February 1987 Responds to Expressing Concerns Re 870104 Newsday Article on Plant Emergency Plan.Given Unwillingness of State & Local Govts to Participate in Development of Plan,Approved Util Offsite Emergency Plan Only Such Plan Available ML20211C5251987-02-0606 February 1987 Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl ML20210B0181987-02-0303 February 1987 Responds to Re Conference of Counsel.Aslb Has Not Determined That Conference of Counsel Necessary.Staff Response Not Due Until End of Day.Served on 870205 ML20215C9881986-12-0808 December 1986 Responds to RM Kessel Re Involvement in Upcoming Insp at Facility & Suffolk County 861128 Request for Similar Involvement.Meeting W/Util Suggested by State of Ny to Resolve Issues ML20213G9751986-11-14014 November 1986 Final Response to FOIA Request.App a Documents Encl & Being Placed in Pdr.No Records Available That Relate to Audit Rept Other than Documents Noted on Page 20 of Motion Re Insp Rept 50-322/86-10 ML20211D1721986-10-20020 October 1986 Informs That 861014 Motion Requesting Documents from Commission Does Not Relate to Any Issues Being Considered in Ongoing Adjudication.Request Referred to Staff for Appropriate Action.Served on 861020 ML20215C1871986-10-0707 October 1986 Responds to 861002 Request for Further Limited Appearance Session at Riverhead,Ny.Requests Denied,Since Comprehensive Record of Citizen Positions Obtained on 860905.Written Statements May Be Submitted to Board.Served on 861008 ML20209H9321986-09-10010 September 1986 Forwards Notice of Time & Location for Limited Appearance Statements in Response to .Limited Appearance Statements Will Be Heard at 860926 Session in Mineola,Ny ML20209H9131986-09-10010 September 1986 Forwards Notice of Time & Place for Limited Appearances Before Aslb.Session Will Be Held in Mineola,Ny on 860926 ML20203L1641986-08-21021 August 1986 Responds to Transmitting Two Resolutions of Nassau County Board of Supervisors Re Use of County Facilities,Including Nassau Veterans Memorial Coliseum,In Util Evacuation Plan.Served on 860822 ML20205F7001986-08-11011 August 1986 Responds to FOIA Request for Ofc of Investigations Repts 1-86-003 & 1-86-008 Re Facility.Final Repts Incomplete & Therefore Withheld (Ref FOIA Exemptions 5 & 7) IA-86-418, Responds to FOIA Request for Ofc of Investigations Repts 1-86-003 & 1-86-008 Re Facility.Final Repts Incomplete & Therefore Withheld (Ref FOIA Exemptions 5 & 7)1986-08-11011 August 1986 Responds to FOIA Request for Ofc of Investigations Repts 1-86-003 & 1-86-008 Re Facility.Final Repts Incomplete & Therefore Withheld (Ref FOIA Exemptions 5 & 7) ML20204F3831986-07-29029 July 1986 Approves 860722 Request for Permission to Make Limited Appearance in Proceeding to Explain Resolutions Re Use of Nassau County Facilities as Part of Evacuation Plan.Served on 860730 ML20202G0351986-07-11011 July 1986 Ack Receipt of 860626 Request for Increased NRC Emergency Planning Requirements for Low Power Licensing of Nuclear Power Reactors.Ltr Being Served on Parties to Licensing Proceeding.Commission Response Forthcoming.Served on 860711 ML20198K7551986-06-0202 June 1986 Notifies That State of Ny 860515 Motion Seeking Termination of Licensing Proceeding Served on Parties to Proceeding,Per Regulations Governing Ex Parte Communications.Nrc Response to Motion Withheld,Pending Filings of Other Parties ML20137M6411986-01-22022 January 1986 Advises That Suffolk County Local Law 2-86 Became Effective 860116.Law Obviously Designed to Apply to 860213 Scheduled Emergency Planning Exercise for Facility.Suffolk County Participation in Exercise Welcomed ML20132C0771985-09-25025 September 1985 Requests Future Ltrs Sent by Telecopier Have Followup Mailed Ltrs or Phone Notification,Per 850917 Telcon Re Forthcoming State of Ny 850926 Appeal from LBP-85-18.Related Correspondence ML20213F3811985-07-30030 July 1985 Responds to 850711 & 15 Requests for Suspension of Low Power Testing Program at Facility & Review of Training of Personnel & Condition of Equipment to Determine If Plant Safe to Test at Low Power.Plant Safely Operated by Util ML20133G1971985-07-25025 July 1985 Responds to Re Sixty Minutes 850324 Broadcast Alleging Poor Workmanship & Organized Crime Involvement in Facility Const.Program Identified No safety-related Concerns Not Previously Investigated or Under Investigation ML20127K6451985-06-26026 June 1985 Advises That If Representation Controversy Unresolved by 850812,Appeal Board Will Require All Attys Purporting to Represent Suffolk County Before NRC to Provide Detailed Statement Re Measures Taken to Obtain Resolution ML20126E4841985-06-11011 June 1985 Responds to LC Lanpher 850322 Request for Clarification of Safeguards Info Requirements Re Facility Security Matters. NRC Will Review Protected Info to Determine Whether Protection Justified.Served on 850613 ML20125E5131985-06-10010 June 1985 Notifies That Aslab Assumes Mb Ashare Will File & Serve Submission Per 850603 Order.Briefs on cross-appeals from ASLB 850417 Partial Initial Decision Due on 850703 & 11 ML20128C9421985-05-13013 May 1985 Responds to Forwarding P Bower Allegations Re Design & Const Flaws.Summary of Investigation Encl ML20127C4611985-02-0404 February 1985 Discusses Status of NRC Analysis of Source Term Data & NRC Regulations Governing Emergency Planning Zone,In Response to 850104 Request.Studies by Ans,Aps,Idcor & Natl Labs Re Source Term Data Cited ML20062B6591982-07-14014 July 1982 Opposes County Funding for Complete Independent Physical Insp & Design Review of Critical Safety Sys & Request to Force Util to Open Plant for Insp.Pending Hearings on QA Contentions,No Independent Physical Insp Will Be Supported 1990-10-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20059J8101994-01-26026 January 1994 Responds to 930701 & 16 Ltrs Re Changes to Shoreham Nuclear Power Station Revised Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Identified as Rev 2. Changes Acceptable ML20058P2831993-12-0808 December 1993 Advises That Rev 2 to Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Pool Consistent W/ Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan W/Encl Exceptions.Exceptions Withheld Per 10CFR73.21 ML20058D1971993-11-22022 November 1993 Forwards Insp Rept 50-322/93-03 on 930801-1008.No Violations Noted.Weaknesses Were Identified in Initial Fuel Shipment at Shoreham Station ML20058K7301993-11-16016 November 1993 Informs That Case 93-4269,State of Nj Vs Long Island Power Authority Filed on 930921,seeking to Prevent Barge Shipments of Slightly Spent Fuel from Defunct Shoreham Nuclear Power Plant to Limerick Plant Dismissed on 931021 ML20062J7981993-11-0505 November 1993 Forwards EA & Finding of No Significant Impact in Response to 930706 Request for Exemption from Revised Requirements of 10CFR20 for Unit 1.Schedular Exemption Granted ML20059B2231993-10-22022 October 1993 Ack Receipt of 931008 Petition Filed W/Edo,Requesting That Commission Take Immediate Action to Halt Ongoing Shipments of Fuel ML20057F2071993-09-30030 September 1993 Forwards Exemption from Emergency Preparedness Requirements of 10CFR50.54(q),per 930126 Request & SER ML20057B7201993-09-14014 September 1993 Forwards EA & Finding of No Significant Impact in Response to 930126 Request for Exemption from Emergency Preparedness Requirements of 10CFR50.54(q).Informs That After EA & Fonsi Published in Fr,Exemption Can Be Granted ML20057D8981993-09-13013 September 1993 Forwards Enclosure (8) to SECY-93-166 Re Proposed Characteristics of Design Basis Vehicle.W/O Encl ML20056H1991993-08-26026 August 1993 Responds to Re Changes to Shoreham Nuclear Power Station Guard Training & Qualification Plan Identified as Rev 6.Rev Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan ML20056H5131993-08-26026 August 1993 Accepts Changes to Safeguards Contingency Plan Identified as Rev 6.Changes Consistent w/10CFR50.54(p) IR 05000322/19930021993-08-16016 August 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-322/93-02 ML20056C7151993-07-14014 July 1993 Forwards Amend 10 to License NPF-82 & Se.Amend Revises Defueled TS by Deleting Requirement That Radioactive Effluent Release Rept Be Submitted on Semiannual Basis & Eliminates Requirements for Ac Sources ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20128G6271993-02-0202 February 1993 Forwards Insp Rept 50-322/92-05 on 921013-1231.No Violations Noted.One Unresolved Item Described.Decommissioning Activities Generally Well Managed ML20128H2951993-01-29029 January 1993 Informs That NRC Has Reviewed & Approved Licensees Ltr LSNRC-2019 Dtd 921230,requesting Change to Shoreham Decommissioning Plan in Accordance W/Condition 4 for Decommissioning Order ML20126G9351992-12-22022 December 1992 Submits Results of Review of 921204 & 14 Requests for Approval of Changes to Decommissioning Plan Covering Decommissioning of Existing Liquid Radwaste Redundant Sys. Removal of Redundant Sys Approved ML20126F9431992-12-16016 December 1992 Provides Interim Response to Re Transnuclear Inc Application for License to Export Irradiated Fuel from Facility in New York to Cogema in France ML20126G9231992-12-16016 December 1992 Forwards Comments Per Review of Rev 0 to Decommissioning Project Termination Survey Plan,Submitted Via . Addl Info Needed to Complete Review of Proposal to Exclude Fe-55 from Consideration W/Surface Contamination Limits ML20128E1061992-12-0202 December 1992 Forwards Insp Rept 50-322/92-04 on 920627-1012 & Notice of Violation ML20133N0981991-08-27027 August 1991 Forwards Viewgraphs Used by Long Island Lighting Power Assoc During Meeting W/Nrc on 910816 ML20058J0591990-11-19019 November 1990 Forwards NRC Public Notice of 901108 License Amend Request Re Shipment of Fuel Support Pieces to Low Level Radwaste Disposal Repository at Barnwell,Sc ML20058H8091990-11-14014 November 1990 Responds to Indicating Desire to Ship 137 Fuel Support Castings & 12 Peripheral Pieces to Low Level Radwaste Repository ML20062F4301990-11-0808 November 1990 Advises That Ofc of General Counsel Designated to Review & Resolve Six Petitions Filed by Scientists & Engineers for Secure Energy & Stated School District Re Amends to Ol. W/Certificate of Svc.Served on 901109 ML20062C1901990-10-24024 October 1990 Advises That Commissioner Jr Curtiss Will Visit Plant on 901113 to Tour Facility & Meet W/Lilco Mgt & Operating Personnel to Review General Status of Activities at Plant. W/Certificate of Svc.Served on 901024 ML20058G4471990-10-18018 October 1990 Forwards Sept 1990 Rept to Commission on Implementation of TMI Action Plan Items,Per 900320 Commitment.W/O Encl.Review Concluded for All But Two Units ML20062B6631990-10-12012 October 1990 Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support ML20059M7901990-09-27027 September 1990 Advises That 880708 Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss Acceptable ML20059M4991990-09-20020 September 1990 Forwards Insp Rept 50-322/90-02 on 900606-0825.No Violations Noted ML20056B4481990-08-21021 August 1990 Forwards Exemption from fitness-for-duty Requirements Re 10CFR26,per .Exemption Requested to Limit Scope of Program to Persons W/Unescorted Access to Area Containing Equipment Necessary to Support & Maintain Storage of Fuel ML20059A6491990-08-16016 August 1990 Grants Waiver of Compliance from Limiting Condition for Operation 3.7.1.2.b.3 of Tech Spec on Plant Svc Water Sys, Per 900810 & 15 Ltrs.Waiver Allows Performance of Underwater Radiation Survey & Physical Insp of Selected Fuel Elements ML20059A6351990-08-15015 August 1990 Forwards Notice of Consideration of Issuance of Amend to License NPF-82 & Proposed NSHC Determination & Opportunity for Hearing Re 900105 Application ML20059A7151990-08-14014 August 1990 Expresses Appreciation for Remarks on Status & Schedules During drop-in Visit at Region I on 900731.Summary of Discussion Encl ML20058N8391990-08-13013 August 1990 Forwards Environ Assessment & Finding of No Significant Impact Re 900315 Request for Exemption from Full Scope of Fitness for Duty Requirements of 10CFR26 ML20058P1921990-08-0707 August 1990 Forwards Insp Rept 50-322/90-03 on 900710-13.No Violations Noted.One Unresolved Item Noted ML20058M5951990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Licensees Establishment of Engineering Mgrs Forum to Foster Disciplined & Coordinated Approach to Initiatives ML20056A1971990-07-31031 July 1990 Forwards Amend 6 to License NPF-82,safety Evaluation,Notice of Issuance & Exemption Re Defueled Emergency Preparedness License Condition.Proposed Changes Would Allow Util to Cease Offsite Emergency Preparedness Activities ML20055G5691990-07-19019 July 1990 Grants Util 15-day Extension of 900619 Waiver of Compliance Re OL Paragraph 2.C.(13) Quarterly Drills License Condition. Extension Will Allow NRC to Complete Review of Associated Request to Cease Offsite Emergency Preparedness Activities ML20055D2911990-06-27027 June 1990 Forwards Review of Util 900105 Request to Amend Tech Specs to Reflect Plant Protracted Defueled Condition.Meeting Should Be Scheduled at Site on 900719 & 20 to Discuss Finalizing Plant Defueled Tech Specs ML20055E3591990-06-25025 June 1990 Forwards Amend 5 to License NPF-82 & Safety Evaluation.Amend Changes Administrative Section of Tech Specs & Moves Procedural Details Involving Radioactive Effluent Monitoring Instrumentation & Equipment Requirements to ODCM ML20055C8281990-06-19019 June 1990 Grants 900530 Request for Waiver of Compliance from License NPF-82,Paragraph 2.C.(13) Re Quarterly Drills License Condition,Pending NRC Action on 891215 Request to Cease Offsite Emergency Preparedness Activities ML20248C0531989-09-26026 September 1989 Forwards Amend 4 to Indemnity Agreement B-87,reflecting Changes to 10CFR140.Amend Reflect Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248G9331989-09-25025 September 1989 Forwards Safeguards Insp Rept 50-322/89-08 on 890821-24.No Violations Noted 1999-10-01
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _
f MAY I 3 1985 Docket No. 50-322 Mr. Richard M. Kessel Chairman and Executive Director New York State Consumer Protection Board Room 1725 250 Broadway New York, NY 10007
Dear Mr. Kessel:
I have been asked to respond to your March 12, 1985 letter to the Nuclear Regulatory Commissions' Secretary, Samuel J. Chilk. Since issuance of a construction permit in 1973 for the Shoreham facility, this office has been conducting inspections and investigations relative to design, manufacturing, construction and management systems affecting the construction and safe opera-tion of the facility. Over the years, numerous problems have been identified by both the NRC and the mandated utility audit program. Consequently, many problems have been identified and we have required that deficiencies be fixed and appropriate remedial measures taken. The record at Shoreham over the years shows that problems have been properly addressed and required corrective actions were taken. This type of situation is not uncommon in the construction of a complex facility such as a nuclear power plant. Your letter forwarded a letter from Ms. Patricia Bower that contained allegations regarding design and construction flaws and other issues apparently provided to her by instrumen-tation and control technicians at the Long Island Lighting Company's Shoreham Nuclear Power Station. I believe your letter raised four concerns that I will respond to directly.
The first concern is that NRC should consider in the Shoreham hearings before the Atomic Safety and Licensing Board (ASLB) the information contained in Ms. Bower's letter. As you noted, Ms. Bower's letter contains a number of allegations of which we previously were aware. We informed the Shoreham ASLB on August 16, 1983 of those allegations. Ms. Bower's recent letter also contains new allegations. The Region I staff has recently conducted an inspec-tion related to these allegations. A report of our inspection findings should be available in the near future and will be forwarded to you and Ms. Bower.
Based on the nature of these findings, appropriate steps will be taken.
The second concern is that the allegations appear to seriously affect the prospects for safe operation of the Shoreham plant. The NRC follows up on each allegation received to determine if it could affect the safe operation of a plant. As discussed in more detail in the enclosure, each of Ms. Bower's previously identified concerns was addressed. Based on the findings of the extensive technical investigations, wo were unable to identify any adverse impact or effect on safety or safety systems.
The third concern is that NRC inspectors have failed to uncover or order correc-tion of the alleged deficiencies. In the record of all allegations received to-date and evaluated on Shoreham, in our opinion, no pattern has been established or exists which would suggest such a programmatic problem at Shoreham. Followup 050520 463 050513 PDR A K 05000322 H PDR f g l
.? o' .
Mr. Richard M. Kessel 2 by this office has found the licensee's records to be well maintained, complete, and accurate, their staff cooperative, knowledgeable, and qualified and the s
construction and testing of Shoreham equipment and systems to be in compliance with our regulations. As can be seen in the inspection findings to-date, correc-tive actions were taken when problems were identified either by the licensee or the NRC. The effectiveness of these corrective actions has also been examined.
The fourth concern is that NRC should take appropriate steps to investigate these allegations. As discussed above and in more detail in the enclosure, we either have vigorously pursued each allegation raised on Shoreham or we are in the process of doing'so for the recently expressed concerns. Upon completing our efforts, we do publish our findings. In this regard, you requested that we inform you of our findings. The enclosures to this letter are a partial response and we will forward the results of our ongoing efforts when they are completed.
~
I hope that this response adequately addresses your letter. If I may be of further assistance or if you require any other documents referred to in this letter, please feel free to contact me.
Sincerely, Original kigned by 2homas E. Murley, Thomas E. Murley Regional Administrator
Enclosures:
- 1. Summary of Region I Activities Related to Allegations of Ms. Patricia Bower Related to Shoreham
- 2. March 10, 1983 Transcript of Meeting -
With Pat Bower
- 3. NRC Inspection Report No. 50-322/84-04 dated May 1, 1984
- 4. NRC Inspection Report No. 50-322/85-10 dated February 19, 1985
- 5. NRC Inspection Report No. 50-322/83-26 dated August 30, 1983
- 6. NRC Inspection Report No. 50-322/83-36 dated December 5, 1983
- 7. NRC Inspection Report No. 50-322/83-39 dated December 14, 1983
- 8. NRC Inspection Report No. 50-322/83-34 dated December 21, 1983
- 9. NRC Inspection Report No. 50-322/83-41 dated July 11, 1984
- 10. NRC Inspection Report No. 50-322/83-33 dated November 20, 1984 cc(w/ Attachment 3):
Ms. Patricia Bower P. O. Box 207 St. James, New York 11780
p' E Mr. Richard M. Kessel 3 4
Distribution (w/o. enclosures):
W. Dircks J. Roe T. Rehm V. Stello G. Cunningham H. Denton J. Taylor OI EDO 000467 SECY.No.85-244 J.-Allan
. R. Starostecki W. Kane H. Kister Docket No. 50-322 Public Document Room Local Public Document Room Region I Docket Room i
R RI:RA Kister/grm/dmg Kane St u tecki Alla! / Mur ey 5/01/85 $ Il 5 ff
- See previous concurrence page. l, OFFICIAL RECORD COPY 218 KANE - 0003.0.0 04/26/85 L-
y b .
.Mr. Richard M. Kessel 2
--The fourth concern is that NRC should take' appropriate steps to investigate these allegations. As discussed above and in more detail in the enclosure, we either have vigorously pursued each allegation raised on Shoreham or we are in the' process of doing so for the recently expressed concerns. Upon completing our efforts, we do publish our findings. In this regard, you requested that we inform you of our findings. The enclosures to this letter are a partial response and we will forward the results of our ongoing efforts when they are completed.
I hope that.this response adequately addresses your letter. If-I may be of further assistance or if you require any other documents referred to in this letter, please feel. free to contact me.
Sincerely, Thomas E. Murley Regional Administrator
Enclosures:
- 1. Summary of Region I Activities Related to Allegations of Ms. Patricia Bower Related to Shoreham
- 2. March 10,-1983 Transcript of Meeting With Pat Bower
- 3. NRC Inspection Report No. 50-322/84-04 dated May 1, 1984
- 4. NRC Inspection Report No. 50-322/85-10 dated February 19, 1985
- 5. NRC Inspection Report No. 50-322/83-26 dated August 30, 1983
- 6. NRC Inspection Report No. 50-322/83-36 dated December 5, 1983
- 7. NRC Inspection Report No. 50-322/83-39 dated December 14, 1983
- 8. NRC Inspection Report No. 50-322/83-34 dated December 21, 1983
- 9. NRC Inspection Report No. 50-322/83-41 dated July 11, 1984
- 10. NRC Inspection Report No. 50-322/83-33 dated November 20, 1984 cc(w/Att'achment3):
Ms. Patricia Bower P. O. Box 207 St. James, New York 11780
- RI:DRP *RI:DRP RI D r$ 1 RI:DRA RI:RA
, Kister/grm/dmg Kane Star Allan Murley 5/01/85 i h 0FFICIAL RECORD COPY 218 KANE - 0002.0.0 04/26/85 L . _ -_ - _ __. _ _ - _ _ _ _
. l ENCLOSURE
SUMMARY
OF REGION I ACTIVITIES RELATED TO ALLEGATIONS OF MS. PATRICIA B0WER RELATED TO SHOREHAM On January 14, 1983, NRC Region I received allegations from Ms. Patricia Bower in.a letter dated January 3,1983, relative to design and construction quality assurance concerns related to the Shoreham facility. Based on a preliminary review by Region I, the concerns expressed in the January 3 letter were developed into 38 separate allegations. Most, if not all, of these allegations were lacking in detail and in need of further specificity before a determina-tion could be made relative to the appropriate inspection effort, i f any ,
required to resolve these concerns. As a result, the staff acknowledged Ms.
Bower's submittal in a letter to her dated February 1,1983, advising her of our need for additional information to allow appropriate followup activity.
In a February 6,1983 letter to Region I, Ms. Bower transmitted an update of allegations with additional information. After these concerns were discussed with Ms. Bower by telephone and in person on a number of occasions in February and March 1983, an investigator and an engineer from the NRC went to Long Island on March 10, 1983, to interview her with the objective of formulating an inspection plan. A copy of the transcript from the March 10 meeting was provided to Ms. Bower by letter dated April 1, 1983.
During this interview, it became apparent that Ms. Bower had no first-hand information relative to her concerns. Further, she would not disclose her sourcess. She did provide a March 9,1983 document which contained a listing of 37 allegations received from a steam . fitter. This document later was formally provided to Region I as an attachment to an April 21, 1983 letter from Ms. Bower, which also included an allegation (diagram) related to reactor building floor drains which had been informally handed to two different NRC representatives at a Congressional hearing on April 18, 1983, in Seldon, New York. Subsequently, an individual (Mr. John W. Huber) with more specific information did voluntarily contact Region I and, based on his detailed comments obtained during an interview in July 1983, a detailed inspection plan was developed. Follow-up inspections were documented in a series of reports over a two year period, reflecting the numerous inspections that were conducted to' assess the extent to which, if any, they had on plant safety. Although Mr.
Huber's concerns were sufficiently detailed, the nature of the problems iden-tified were not adversely affecting critical safety systems. However, such a perspective may not be readily obtained and it is only after extensive investi-gative effort that we reached this conclusion. Details of events a.ssociated with the. follow-up to Mr. Huber's concerns are described below:
On June 14, 1983, Region I received a handwritten note from Mr. John W. Huber, dated June 9,1983, requesting a meeting and stating that he was one of the individuals (a steam fitter) who provided Ms. Bower with the 37 allegations contained in the the -March 9 document. Based on telephone calls in mid June 1983, a meeting date of July 13 was established. During telephone discussions on June 23 and June 24, 1983, Mr. Huber provided an additional allegation related to fuel handling.
L
2 On July 13, 1983, Mr.' Huber, accompanied by his attorney, Robert Gottlieb, Esq., met with the NRC senior. resident inspector, an NRC supervisor and the Region 'I Counsel, in order.to provide Mr. Huber an opportunity to more fully express and clarify his concerns to the NRC and to give the Region I technical staff. a chance to obtain more specific information upon which to base . .an inspection. Two more allegations (in addition to his original 37 plus the one related to fuel handling) were identified during this meeting.
As a result of the interview with Mr. Huber on July 13, 1983, the allegations initially raised by Ms. Bower, which lacked the . requisite specificity to initiate meaningful field inspections, were described in more detail.
With . regard to Ms. Bower's claim that the NRC dismissed 70 worker allegations she provided, they were investigated during the period August 1983 through
, February 1984, and the results of those inspections were provided to the various licensing Boards hearing the Shoreham case, as well as all the parties to that proceeding. - The results of the inspections are contained in seven-separate public reports; six addressed the allegation of a former Shoreham
. steam fitter, Mr.~ John Huber; and one report addressed Ms. Bower's separate concerns. Regarding Mr. Huber's allegations, the staff identified 40 distinct allegations from the July 13, 1983 interview with him, which were subsequently found to be unsubstantiated . as violations of NRC regulations or as public health or safety problems. Copies of all six of the inspection reports were provided to Mr. ' Huber's attorney, as agreed to in the interview with him.
Copies of those reports are also available in the NRC's . Local Public Document Room, which is- located at the Wading River High School on Route 25A near the Shoreham site.
All of Ms. Bower's technical concerns were addressed by an inspection conducted by the Region I office in February 1984. The results of that inspection were documented in Report No. 50-322/84-04, published on May 1, 1984. The staff concluded that there was no ' safety. substance to any of her alleged conditions.
While Mr. Huber had not requested anonymity, .Ms. Bower did. request that her name not be revealed so as not to compromise her sources. Although this office initially honored her request, her inputs indicated that she had subsequently openly ~ discussed her concerns, and we informed the Shoreham Licensing Board of the status of these issues on August 16, 1983. Region I has had no further contact with Ms. Bower in~ almost two years, even though Inspection No. 50-322/
84-04 was made public (as well as provided to all parties involved in the Shoreham hearings) almost one year ago.
Regarding the new items identified by Ms. Bower to you (namely, the -four items in the;second paragraph of the first page and the instrumentation allegations on the enclosed sheet), on-site inspections were conducted in April 1985, and the results are currently being evaluated. A report of these inspection findings will be issued.
With respect to Ms. Bower's reference to the statements made by two former Quality Assurance inspectors at Shoreham before the Suffolk County Legislature, NRC Region I representatives have been 'in contact with these individuals. The c
.R .~
3 NRC staff was-initially made aware of their concerns through articles published '
-in Long Island newspapers in January 1985. After initial attempts to interview with Mr. George Henry, the person cited in the first newspaper article, were unsuccessful, a preliminary inspection was performed based solely on the state-ments made in the article. Mr. Henry was a former QC inspector for two years at Shoreham. Subsequently, interviews were conducted on February 19 and 27, 1985. --The report of the .on-site inspection, No. ' 50-322/85-10, was issued on February: 19, 1985, and the preliminary findings were that, based on the available information in the newspaper and upon the NRC inspection, none of Mr.
Henry's allegations could be substantiated as violations or safety problems.
The transcripts of the interviews are being evaluated by other regional staff; however, based on the reviews performed to-date, no new information has been
~
identified hat would affect the preliminary findings.
While Mr. Henry described problems or events which did occur, inspection
. records indicate that these matters were previously identified by LILCo in the normal conduct of their quality assurance program. Records indicate that these issues were properly evaluated by LILCo Startup and Engineering personnel, and received acceptable technical disposition. Further, none of the technical
. issues described were .found to represent a serious operational or design problem. The other individual, Mr. Ronald Stanchfield, a former employee (but not a QC inspector) of -two subcontractors at Shoreham for a period of approxi-mately four. months total, was interviewed on February 4, 1985, by the staff.
Transcripts.of these interviews have been evaluated by Region I management, and an inspection of those concerns resulting from that review was cor. ducted during
, April 1985. A report of these inspection findings will be issued.
. .> g i
r b
- Mr._ Richard M. Kessel- 3
- Distribution (w/o enclosures):
. W.~0ircks J. Roe T. Rehm
. V. Stello G. Cunningham -
.H. Denton J. Ta'y lor
'0I~ ~
EDO 000467'
'SECY No.85-244 J.'Allan
' R. Starostecki lW. Kane
- H. Kister-Docket No. 50-322-Public Document Room
' Local Public Document Room
, Region I Docket Room 7
8
-a