Forwards Viewgraphs Used by Long Island Lighting Power Assoc During Meeting W/Nrc on 910816
ML20133N098
Person / Time
Site: Shoreham, 05000300
Issue date: 08/27/1991
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgranery J
MCGRANERY, J.P., JR.
References
NUDOCS 9701230161
Download: ML20133N098 (51)


Text

,

yU(L-l-Adu m Gyf

. .,a.

d ';

4109 t A M

  • UNITED STATES $D 3 hd ~ ~

f {ty g NUCLEAR REGULATORY COMMISSION S 'E 475 ALLEN ALE ROAD M

...../ KING OF PRUSSIA, PENNSYLVANIA 19406-1415

  • Ibd t AUG 2 7 199 (

Mr. James McGranery, Esquire 1255 23rd Street, N.W.

Suite 500 Washington, D.C. 20037 ,

l

Dear Mr. McGranery:

Per your request, I have enclosed a copy of the view graphs used by the Long Island Lighting Company and the long Island Power Association during the meeting with the NRC

,, on August 16, 1991.

1 \

is ~ For your information, these view graphs, attached to a meeting summary, as well as the transcript of the meeting will be placed in the Public Document Room in the near future.

If you have any further questions, please contact me at (215) 337-5378.

Sincerely, h I2wrence T. Doerflein, Chief Reactor Projects Section No. 2B

Enclosure:

As stated g cc: 3

( )

v' Public Document Room d i Local Public Document Room C j' 8 x

\

\

,4 230006 9701230161 910827 PDR ADOCK 05000322 p PDR

7 i

V.P. NUCLEAR

  • LILCO Staff, in conjunction with LIPA, has I been preparing for the POL for months in advance.

O

  • POL Procedures prepared & put "On Shelf" for implementation.
  • One-Line POL Implementation Schedule was developed. l O
  • Site Personnel are Trained & Qualified
  • Management Meetings held for all Site Personnel, including LIPA & Contractors to discuss POL Content & implementation.

i

1 1
V.P. NUCLEAR i

1 I

  • Staff is working with LIPA to ensure a
smooth transition of POL Requirements at License Transfer. ,

1 O

<

  • A meeting with LIPA was recently held to
discuss & prepare work Schedule for future
activities in the upcoming months.

e integration of LILCO & LIPA Staff Personnel will be occurring in the near future.

O

i 1

i.

i i

i t

! NUCLEAR ENGl\ LEERING

) DEPARTMENT i

t i

!O l l 1

1 i

POST POL -

l EVALUATION 1

i  ;

I

! NRC REGION I PRESENTATION I AUGUST 16,1991

l.;. '

l

NED i POL DESIGN IMPLICATIONS 1

l l i I l l

  • NO ACTIVE SAFETY SYSTEMS
  • PASSIVE SAFETY SYSTEMS LIMITED TO l FUEL HANDLING AND BUILDING STRUCTURES l l

!

  • ACCIDENT ANALYSIS REDUCED TO FUEL i j HANDLING AND RADWASTE ' FAILURE O + SAFETY EVALUATIONS AMENDED TO INCLUDE DECOMMISSIONING CONSIDERATIONS

, _ - - - - - ,.,,,-----,----.m - -- - --.+..

i l NED i

i DESIGN BASIS l PL ANT CONFIGURATION

  • FUEL IN SPENT FUEL POOL l
  • WET STORAGE IN POOL l (PASSIVE SAFETY PROTECTION) li RADIOACTIVE INVENTORY
  • FUEL l
    • 560 FUEL ASSEMBLIES

} -

91,000 CURIES l

l ** GASEOUS COMPONENT i

1370 CURIES Kr-85 0% IODINES / HALOGENS

    • DECAY HEAT 300 WATTS
    • BURNUP 2 EFFECTIVE FULL POWER DAYS
  • STRUCTURES EQUIPMENT
    • RPV & INTERNALS - 601 CURIES
    • PIPING SYSTEMS / STRUCTURES .004 CURIES

l NED l DESIGN BASIS L' Con't}

l

!

  • ACCIDENT ANALYSIS (DSAR) f i Q ** FUEL HANDLING l ** RADWASTE TANK FAILURE

! . DOSES DUE TO POSTULATED ACCIDENTS ARE SMALL FRACTIONS OF 10CFR100 l AND PAG LIMITS I

  • SAFETY CLASSIFICATION i

O SAFeTv SYSTsuS RECLASSIFIED iN DSAR BASED UPON DESIGN BASIS / .

ACCIDENT ANALYSIS

    • NO ACTIVE SAFETY SYSTEMS
    • PASSIVE STRUCTURAL SAFETY REQUIREMENTS FOR REACTOR BLDG ,

AND FUEL HANDLING EQUIPMENT

=7._.--__-_._.__ _ .

l .:'

i 4 t

! NED PROGRAM ACTIVITIES l l

l

! Functions Eliminated

  • Environmental Qualification (EO) l l
  • Seismic Qualification (Equipment)

!

  • IST/ASME Section XI l l

l

  • Cabie Separation & Analysis i

! Functions Reduced i

i

  • Configuration Control i

O

  • Station Modifications
  • Radiological Monitoring Program (REMP) j
  • Fire Protection Scope l
  • Dedication of Safety Related Parts / Materials i

i i

l

l :. -

l i

NED PROGRAM ACTIVITIES i

Functions Unchanged

!

!O

- "**'*' "" ' "' a'**

  • Procurement i

l

  • Fuel Transfer
Functions LIPA Supoort l
  • License Transfer O -

Program / Procedure Development Training Readiness Assessment i -

Contract Reviews

  • Decommissioning Characterization Program Technical Studies / Reviews Dose Pathways Analysis i

\.

i NED ORGANIZATION EFFECTS i STAFF NUCLEAR ENGINEERING (ON-SITE) 4

  • GRADUAL STAFF REDUCTION

!O OF 8 PERSONNEL OFFICE OF ENGINEERING (CORPORATE SUPPORT) 1

  • SUPPORT STAFF AND FUNCTIONS UNCHANGED

!

  • WORK SCOPES WILL CHANGE DUE TO l POST-POL ACTIVITIES

. PROCEDURES PREVIOUS NUMBER OF PROCEDURES 10 3 l

! PROCEDURES REQUIRED POL 85

! PROCEDURE REVISIONS l

MAJOR 13 MINOR 20 l

% COMPLETE 100 %

% TRAINING COMPLETE 98%

i 4

j

4 i ,

b l

! I l

l l SHOREHAM NUCLEAR I i PClWER STATION i

i POSSESSION ONLY LICENSE '

TECHNICAL SPECIFICATIONS i

lO i

PRESENTED TO hRC REGION #1 AUGUST 16,1991 u

i ,

POSSESSION C'NLY LICENSE l J AMENDMENT #7 i

i i Issued: June 14,1991 j Effective: July 20,1991 Maior Conditions:

- Possess, use, but not operate the facility

- Receive, possess, use special nuclear material / byproducts

- Maximum Power Level: No core power level

- Revised Technical Specification

- Revised Environmental Plan O, - NRC prior approval to place any fuel assembly into the Reactor Vessel

- Fire Hazards Analysis Report & DSAR

- Changes without prior approval of the Commission - if changes would not adversely affect the ability to maintain fuel in the Pool safely in the event of a fire.

.=

l l PCfSSESSION C'NLY LICENSE l AMENDUENT #7 (CONTINUED)

- Maintain fully implemented and maintained Commission - approved: physical security O- plan, guard T&Q plan, and safeguards contingency plan

- Have and maintain financial protection as required.

- Expires at midnight April 13, 2013 i

I

{ ,

i l

i P.O.L. TECHNICAL j

SPECIFICATIONS  ;

i l 1.0 Definitions l

l 2.0 Safety Limits and Limiting Safety System l Settings - NOT USED i

!O 3.0 Appiicabiiity 3.1 Instrumentation l

l Monitoring instrumentation 4

! Radiation l Seismic Meteorological i  :

3.2 Containment Systems - NOT USED i 3.3 Plant Systems ,

!; Seal Source Contamination i Settlement of Reactor Building i

Area Temperature Monitoring

l :- l

L l l

! P.O.L. TECHNICAL 1

SPECIFICATIONS (CONTINUED?

l 3.4 Electrical Power Systems l

A.C. Sources Onsite Power Distribution

O

! 3.5 Fuel Handling Operations l Communications l Fuel Handling Platform  ;

! Crane Travel j Water Level - Spent Fuel Storage Pool

! Water Chemistry - Spent Fuel Storage Pool i

lO '

3.6 Radioactive Effluents Liquid Holdup Tanks l

i en

i P.O.L. TECHNICAL SPECIFICATIONS (CONTINUED) 5.0 Design Features 5.1 Site Exclusion Area O tow eopuietion zone Site Boundary 5.2 Fuel and Control Rod Data Fuel Assemblies Control Rod Assemblies 5.3 Meteorological Tower Locations Fuel Storage

] 5.4 Criticality Drainage Capacity 6.0 Administrative Controls 6.1 Responsibility

j.

! P.C'.L. TECHNICAL l SPECIFICATIONS L'CONTlhUED) i 6.2 Organization i Nuclear Organization i Unit Staff

'O i

6.3 Unit Staff Qualifications

! 6.4 Training i

6.5 Review and Audit ROC NRB 6.6 Reportable Event Action O<

6.7 Procedures and Programs 6.8 Reporting Requirements Routine Annual Annual Radiological Environmental Oper.

Annual Radioactive Effluent Release Special

l l

i l P.C'.L. TECHNICAL SPECIFICATIONS (CONTINUED) l i 6.9 Record Retention

! 6.10 Radiation Protection Program c 6.11 High Radiation Area j 6.12 Process Control Program (PCP) t

! 6.13 Offsite Dose Calcuiation Manual (ODCM)

1 l

l i

i l

i 1

i i

! P.C'.L. EFFECTS ON PLANT l REDUCED SCOPE l - Reduction in Surveillance Program l

i - Reduction in the maintenance and l preservation of equipment not required for (1) fuel storage and handling and (2) lO l reeioiosicai controis

- Reduction in the System Classification and Configuration Control Programs for equipment not required for (1) fuel storage and handling and (2) radiological controls: #, *, -

- Reduction / elimination of active MWR/PM backlog 0, - Reduction in fire watch patrols

t I

i P.O.L. FUNCTIONS '

UNCHANGED 4

j - NRC Interface 4

l - License / Tech Spec Support

- Radwaste Control Program l

1 - Chemical Control Program i

?

I - ALARA l - euel Handling Procedures

- Static Layup of Equipment l

> - Licensed Operators on shift O ,

- eire Brigede meinteined et s membere i

l i

i i

i

b j

.l l

i

! P.O.L. -

NEAR TERM i

ACTIVITIES

! Example of some activities to commence in 1991 l

i - Support LIPA License Transfer Readiness

! - Support LIPA Decommissioning Activities iO l - Remove and Preserve Control Rod Drives i

! - Remove and Bury Control Rod Blades 1

l - Ship the Fuel Support Pieces and LPRMS

- Normal Radwaste Shipment

- Continue Structural Decontamination i

i O, - svaiuate system oecontamination

- Equipment Marketability (Non-Regulatory)

G.E. Settlement Safety Related Pedigree

j, l

1

!, NUCLEAR QUALITY ,

l ASSURANCE DEPARTMENT  !

4 i n

v l

l 4

i POST -

POL i

i 1

i O

4 WMM

NOAD -

POST POL

  • PROGRAM CHANGES O

+ ORGANIZATION / STAFF CHANGES

  • AUDITS /SURVElLLANCES I

l

  • QC INSPECTIONS l O + oEricieNcv TReno WMM1

1 l- )

j NCAD PROGRAM CHANGES i

l

  • AUDIT PROGRAM NO CHANGE
  • PROCUREMENT AUDITS REDUCED (NUPIC MEMBER)
  • NRB ACTIVITIES NO CHANGE

= NRB MEETING FREQUENCY AND AUDITS PER TECHNICAL SPECIFICATIONS -

  • NRB EXTERNAL MEMBERSHIP PER TECHNICAL SPECIFICATIONS O
  • iSEG ORGANIZATION DELETED
  • QS INDEPENDENT VERIFICATION OF SAFETY EVALUATIONS
  • INSPECTION REDUCED e SURVEILLANCES NON SCHEDULED WMM2

. 1 i

l I.

l NCAD ORGANIZATIC'N/

l i

STAFF CHANGES a

l l

  • STAFF LEVEL REDUCTION POL l t

!

  • EXPERTISE LEVEL REMAINS CONSISTENT I

I i

!

  • QA MANUAL / PROCEDURES REISSUED i NO PROGRAM CHANGES i

lO i

l l

WMM3

i ..

l -

l i

NCAD 4

AUDITS /SURVEILLANCES f

i i

i

!

  • AUDIT SCHEDULE REDUCED BY 1 0 -

CORRECTIVE ACTION (ANNUAL) l l

  • NRB AUDITS PER TECHNICAL SPECIFICATIONS i -

9 AUDITS SCHEDULED ANNUALLY

{

  • SURVEILLANCES AS REQUIRED l

WMM4

p i.

i s

NCAD l CC INSPECTIONS j

I e INSPECTION ACTIVITIES ANTICIPATED i

\ -

CHARACTERIZATION l i

SALVAGE l

RADWASTE PROCESSING AND SHIPMENT i

ROUTINE PLANT MAINTENANCE /

COMPONENT REMOVAL 1

FUEL HANDLING i

i WMMS i

..___a s ag e 4 y g ;7a ._. u = a a6 m-_

e e %

4 I

NONCONFORMANCE REPORTS NUMBER OF REPORTS k

v 150-100- l 50-1ST QT D QTR 3RD Q H QTR IST QTR 2ND QTR 1990 - 1991

NUCLEAR OPERATIONS l SUPPC'RT DEPARTMENT l il li O

PCGT POL gl li O

NOSD -

POST POL OVERVIEW e FUNCTIONS / RESPONSIBILITIES O

  • LICENSING STATUS
  • LITIGATION STATUS O

( -

I NOSD PROGRAM ACTIVITIES

! POST POL i

j Functions Eliminated i

i i

  • INPO Membership For SNPS iO

- Nuclear Network

- SER & SOER's

! - Miscellaneous Correspondence

i e Successful issue program l - Tracking i - Customer Notification

O l
  • Bar code implementation 2

- Hardware Purchase i i - Software Development

! 1 i

i  :

)

1

j

! NOSD PROGRAM ACTIVITIES l POST POL l i

Functions Reduced s

j

  • NRC Documents j Tight Screening / Limited Distribution

- 'aror==tioa "otice=

!O i - Generic Letters

- Inspection Reports

  • NUMARC Tight Screening / Limited Distribution
  • Warehouse Activities O + Volume of Activities for Records Management & Document Control 1

, =- _

- _ _ - .~ . _-

1 l

l

! NOSD PROGRAM ACTIVITIES

! POST POL i

l Functions Unchanaed i

W j

  • Security

!

  • Fuel Transfer Project 4 s.

!O eoL 'icenee< Tech. spec. sonocri -

!

  • NRC Interface
  • Litigation Support o Permits 8. fipecial Licenses

!

  • Records Management & Document Control l
  • Budget Management l P
  • Plant Support ,
- Repair Part Procurement

- Counter issue  ;

1

, - Material Receipt-Storage l l

i i

  • Inventory i

i - Stock Level Management i l 1

h ,

1 4

i l NOSD PROCEDURE STATUS i

POL IMPLEMENTATION l

l t

I j NO. OF PROCEDURES REVIEWED i

- NOC / NOSD 59 i

! NO. OF PROCEDURES REQUIRING

! CHANGES DUE TO POL

- NOC / NOSD 1 NO. OF PROCEDURES REVISED FOR MINOR CLARIFICATION

,e O - NOC / NOSD NO. OF PROCEDURES DELETED

- NOC / NOSD 4

, _ _ _ _ - - - , - - - - - - - - .- - - ., .u,a _ a,.. , .-.a._aj a _4 m. u.. a .4, u4, a _4._a_..a 4._,_..n.mi..a__.m -4 u___. p __m

. -* _. 4 _._- _..

4 5 *

)

e 3 l 4

f I j i

4 4,

l 6

g -

O l

\

>4 R

-i Z C O '

G)

O

J t

l t

l LICENSlhG STATUS i

~

j l MPROVED i

  • INSURANCE EXEMPTION 4/30/90
  • APPENDIX "J" TESTING 6/25/90
  • SECURITY PL/.N REVISION 6/14/90
  • REVISED LERO PLAN 7/31/90
  • REMOVAL OF OPERATING AUTHORITY 7/19/91 (POL)

O Toi e ve^a ovea"^u' 7e'a'

  • DELETION OF ISEG -

7/19/91

  • 125v D.C. BATTERIES (SEISMIC) 7/19/91 1

1

l i

LICENSING STATUS 5

i  !

i

11 PENDING APPROVAL l l
  • SECURITY PLAN AMENDMENT i
  • OPERATOR REQUAL. PRG. AMENDMENT I l

u l

  • SIMULATOR EXEMPTION 4

l

  • DECOMMISSIONING FUNDING EXEMPTION
  • LICENSE TRANSFER REQUEST
  • DEC OMMISSIONING PLAN I

i l l LITIGATION N.Y. STATE i

COURT OF APPEALS i

  • Feb. 19, 1991 Court Grants Appeal l

Motions Challenging i the 1989 Settlement Agreement lO i

i i

I

  • March 26,1991 Court Schedules Oral Argument for Appeals on Sept. 11,1991 4

i

)

l0

)..

i I ANTICIPATED SCHEDULE FOR i DECOMMISSIONING l

l MILESTONE / ACTIVITY DATE

  • LIPA Decommissioning Plan DEC.1990 Submission to The NRC lO i

l

  • NRC Approval of Joint LIPA/LlLCO JULY-SEPT.

License Transfer Application 1991 l

'

  • NRC Approval of Decommissioning OCT.1991 Plan O

e Shoreham Plant Decommissioning DEC.1993 Complete, NRC License Terminated

\

1

}

LITIGATION STATUS i

!~ ACTION BEING ACTION BEFORE ACTION BEFORE CHALLENGED THE NRC D.C. COURT

1. LILCO'S overall (a) 2.206 petitions new petition filed 3/25/91 Y

I approach to scaling filed 7/14/89,7/26/89; (to encompass DD-90-08, li down activities at petitions denied 12/20/90 CLI-90-08, CLI-91-01, and Shoreham (ongoing) CLI-91-02); petition consol-l: idated with a petition filed h

6/26/91 (same as 5 below);

petition pending l 2. LILCO's proposed Request for hearing on the Petition for review filed amendment suspending proposed amendment filed 5/7/90 (same as 1(a) above)

I-4/30/90; request denied petition dismissed 8/30/90; l the effect of certain conditions in NPF-82 by ASLB 1/8/91; amended request for stay made l

related to offsite request filed 2/4/91; 5/7/90; request for stay l

emergency prepared- amended request granted denied 5/1/90 l

ness (filed 12/15/89) in part 5/23/91; conten-l ions filed 6/21/91; con-tentions pending i e

  • l i

! LITIGATION STATUS .

ACTION BEING ACTION BEFORE ACTION BEFORE CHALLENGED THE NRC D.C. COURT l

3. LILCO'S proposed Request for hearing denied 5/11/90 l amendment to the on the proposed amend-I Shoreham Physical meny filed 4/20/90;

! Security Plan (filed request denied by ASLB I 1/5/90 1/8/91; amended request

! filed 1/8/91; amended ,

j request granted in part i 5/23/91; contentions

filed 6/21/91; conten-i tions pending
4. NRC's Confirmatory Request for hearing on denied 4/30/91 l

Order prohibiting LILCO the confirmatory order j from placing fuel back filed 4/18/90; request j into the Shoreham denied by ASLB 1/8/91; E reactor (issued amended request filed 3/29/90) 2/4/91; amended request b granted in part S/23/91; ,

i contentions filed 6/21/91; I contentions pending i

i 6

^

& h

i i

LITIGATION STATUS i

1' ACTION BEING ACTION BEFORE ACTION BEFORE

! CHALLENGED THE NRC D.C. COURT i

5. LILCO'S proposed Request for hearing denied 8/2/91

) amendment to NPF-82 on the proposed amend-l to remove its author- meny filed 9/20/90; ity to operate Shore- request denied by ASLB i ham (issued 6/14/91) 3/6/91; amended request i filed 4/8/91; amended request granted in part i 6/13/91; contentions filed 7/1/91; conten-tions pending t

! 6. LILCO's and LIPA's Request for hearing on -------

application to transfer proposed transfer filed NPF-82 (filed 4/19/91; request pending 6/28/90) 4 l

1 G #

l I

4 s

i l

} i l LONG ISLAND POWER AUTHORITY i

O POST - POL 0

1 i

i STATUS OF DECOMMISSIOhIhG ACTIVITIES

-PROJECT STATUS-

  • DETAILED ENGINEERING COMPLETE; DELIVERABLES UNDER FINAL REVIEW APPROVAL.
  • REACTOR INTERNALS DISMANTLEMENT BID PACKAGE COMPLETE; EXPECT CONTRACT AWARD BY LATE SEPTEMBER AND SITE MOBILIZATION DURING J AN U ARY, 1992.
  • ' GENERAL SERVICES" PACKAGE FOR PLANT SYSTEMS DISMANTLEMENTS AND GENERAL CRAFT LABOR SUPPORT UNDER FINAL STAGES OF DEVELOPMENT (EXPECT BID SOLICITATION BY LATE AUGUST).

I e INITIATED EFFORTS TO ' PACKAGE" DECOMMISSIONING WORK IN ACCORDANCE WITH O LIPA'S WORK CONTROL REQUIREMENTS.

1 LMH1

i

! STATUS OF

LICENSE TRANSFER PREPARATIONS I

-PROGRAMS / PROCEDURES-l l

  • LIPA ADMINISTRATIVE MANUAL COMPLETE.

,

  • LIPA NUCLEAR OPERATIONS CORPORATE POLICIES 1

DRAFTED, IN FINAL RESOLUTION OF LILCO SENIOR AND EXECUTIVE MANAGEMENT COMMENTS.

i e LIPA OA MANUAL COMPLETE.

!

  • BULK ADAPTATION OF EXISTING IMPLEMENTING

! PROCEDURES COMPLETE, WORKING PUNCH LIST l ITEMS.

i

!

  • ONE (1) OF TWO (2) OVERSIGHT FUNCTIONS ,

(SRC) UP AND WORKING, IRP REMAINS UNDER FINAL STAGES OF DEVELOPMENT.

  • LIPA PROGRAM / PROCEDURE DEVELOPMENT HAS BEEN A COOPERATIVE AND JOINT EFFORT; REPRESENTATIVES OF LIPA, NYPA AND LILCO INTEGRATED THROUGHOUT ENTIRE PROCESS.

LMH2

STATUS OF LICEhSE TRANSFER PREPARATIONS

- STAFFING-

  • DEVELOPMENT OF LIPA SHOREHAM ORGANIZATION COMPLETE.
  • LIPA/NYPA COEMPLOYMENT AGREEMENT COMPLETE; SIX (6) OF SEVEN (7) COEMPLOYEES DESIGNATED.
  • LIPA SITE STAFFING PLAN (1.E., UTILIZATION OF EXISTING LILCO EMPLOYEES, NYPA EMPLOYEES AND CONTRACTORS) COMPLETE AND CONVEYED TO NRC (SNRC- 1813, DATED JUNE 13) .
  • NYPA " CONTINGENCY" CONTRACTS IN PLACE.
  • TRAINING
  1. - SCOPE OF TRAINING FOR LIPA/NYPA EMPLOYEES IDENTIFIED, TRAINING WELL UNDERWAY.

- GENERAL ORIENTATION OF SHOREHAM EMPLOYEES COMPLETE.

LMH3

k 1

1

4 l

A i

STATUS OF i LICENSE TRANSFER PREPARATIONS l l

-READINESS SELF ASSESSMENT-i f a CONTRACT AWARDED, PROJECT TEAM MOBILIZED.

? l 1

  • LIPA READINESS SELF ASSESSMENT PLAN l

)' ESTABLISHED DURING JULY.

i i

  • READINESS SELF ASSESSMENT SITE ACTIVITIES

- READINESS ASSESSMENT UNDERWAY.

- ASSESSMENT TEAM EXIT MEETING ON i AUGUST 14.

l

- EXPECT FINAL REPORT DURING MID-SEPTEMBER.

O LMH4

J

! DECOMMISSIONING PREPARATORY ACTIVITIES UNDER " POSSESSION ONLY" LICENSE l

-OVERVIEW-l

'

  • TWO BROAD CATEGORIES OF ACTIVITIES:

!' - DATA ACQUISITION / PROCESS QUALIFICATION

- DECOMMISSIONING PREPARATORY WORK l

WITH ADDITIONAL CRITERIA TO ENSURE THAT:

l 1) ACTIVITIES DO NOT FORECLOSE THE l

SELECTION OF ANY DECOMMISSIONING ALTERNATIVE; AND 2) PREPARATORY WORK DOES l NOT MATERIALLY AFFECT THE COST OF

DECOMMISSIONING.

!

  • ACTIVITIES TO BE PERFORMED IN ACCORDANCE WITH l THE PROGRAMMATIC REQUIREMENTS OF THE I

SHOREHAM LICENSEE (l.E., LILCO PRIOR TO AND LIPA SUBSEQUENT TO LICENSE TRANSFER).

l

  • ACTIVITIES TO BE PERFORMED BY COMPOSITE, QUALIFIED LIPA/NYPA/LILCO WORKFORCE.

I i

)

LMH5 '

I

i' -

i DECOMMISSIONING PREPARATORY ACTIVITIES UNDER " POSSESSION ONLY' LICENSE l

) -DATA ACQUISITION / PROCESS QUALIFICATION-

  • RPV SAMPLE REMOVAL AND ANALYSIS I -

CONFIRM ACTIVATION ANALYSIS THROUGH FIELD MEASUREMENT.

l l

FACILITATE DEFINITIVE SOLID WASTE STREAM ESTIMATE AND EFFECTIVE WASTE MANAGEMENT PLANNING.

  • BIOLOGICAL SHIELD WALL SAMPLE REMOVAL ,

AND ANALYSIS

- CONFIRM ACTIVATION ANALYSIS THROUGH FIELD MEASUREMENT.

- FACILITATE DEFINITIVE SOLID WASTE STREAM ESTIMATE AND EFFECTIVE WASTE MANAGEMENT PLANNING.

  • PIPING DISMANTLEMENT TECHNIQUE CONFIRMATION

- REMOVE LIMITED NUMBER OF PIPE SPOOLS FROM REPRESENTATIVE SYSTEMS TO QUALIFY PLANNED TECHNIQUES / PROCESSES FOR FULL SCALE PRODUCTION ACTIVITIES. ,

- PERFORMED IN ACCORDANCE WITH APPLICABLE RADIOLOGICAL CONTROLS AND PROCEDURES.

- RESULTS TO BE USED IN DEVELOPING DEFINITIVE CONTAMINATION CONTROL PLAN USING F: ELD DATA FROM ACTUAL SHOREHAM PLANT CONDITIONS.

LMH6

1 , t' -

5

)

i

! DECOMMISSIONING PREPARATORY ACTIVITIES

UNDER " POSSESSION ONLY" LICENSE c

! -DECOMMISSIONING PREPARATORY WORK-i l

  • PROCESS, PACKAGE AND DISPOSE OF THE FOLLOWING:

l l - CONTROL BLADES

- LPRM STRINGS 1

I - FUEL SUPPORT CASTINGS

  • THERMAL INSULATION REMOVAL

- RPV

- CONTAMINATED PIPING SYSTEMS

  • INTERFERENCE REMOVAL

- ESTABLISH PATHWAYS FOR FLOW OF MATERIALS, O COMPONENTS AND PERSONNEL LMH7

l,6 -

1 4

DECOMMISSIONING PREPARATORY ACTIVITIES i

UNDER " POSSESSION ONLY" LICENSE t

j -

SUMMARY

LIMITED IMPACTS ASSOCIATED WITH POST  :

" POSSESSION ONLY" LICENSE WORK LIST:

l - MINOR LOW LEVEL WASTE STREAM i

] - MINOR PERSONNEL RADIATION EXPOSURE lQ

V

- MANY ACTIVITIES WOULD BE PERFORMED UNDER OPTIONS OTHER THAN THE DECON ALTERNATIVE i

j SELECTED BY LIPA.

4 i

l

- ACTIONS SINGULARLY AND COLLECTIVELY WOULD NOT PRECLUDE SELECTION OF ALTERNATE i DECOMMISSIONING ALTERNATIVE.

4 l

BENEFITS TO BE DERIVED:

i

- HANDS-ON EXPERIENCE FOR LIPA/NYPA PERSONNEL l

j FUNCTION IN SHOREHAM WORK ENVIRONMENT UNDER t

LILCO'S (AND LATER, LIPA'S) WORK CONTROLS.

j

- INSTRUMENTAL TO ADDITIONAL AND MORE DETAILED l DECOMMISSIONING PLANNING.

i l

- LIPA/NYPA/LILCO FUNCTIONING COLLECTIVELY WITH COMMON SCOPE OF FIELD / PHYSICAL ACTIVITIES PRIOR TO EXPANDED DECOMMISSIONING l ' PRODUCTION" WORK.

i

- REDUCTION OF SCOPE DURING ' DECOMMISSIONING" l PHASE (i.E., WORK SCOPE LEVELING).

LIPA AND LILCO WILL COLLECTIVELY KEEP THE NRC FULLY APPRISED OF ADDITIONAL PLANS AND FURTHER DEVELOPMENTS.