SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994

From kanterella
Jump to navigation Jump to search
Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994
ML20078A517
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/20/1995
From: Petschauer F
LONG ISLAND POWER AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078A520 List:
References
LSNRC-2189, NUDOCS 9501250028
Download: ML20078A517 (2)


Text

a' - ~

! Long Shor;him Nucl ir Pow:r Stition j island P.O. Box 628 North Country Road Power Authority Wading River, N.Y.11792

!JAN2 01995 LSNRC-2189 l U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk Washington, D.C. 20555 Annual Radiological Environmental Operating Report Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 l

l Ladies and Gentlemen:

l Enclosed is a copy of the Shoreham Radiological Environmental Operating Report for the first half of 1994. It provides the results of Shoreham Station's 1 Radiological Environmental Monitoring Program (REMP). j During the first half of 1994, Shoreham was in the defueled, non-operating condition, and decommissioning was well underway, in addition, termination survey was in progress, and the Shoreham fuel shipments were completed in early June 1994.

1 On November 4,1993, LIPA requested the NRC to amend the Shoreham Possession-Only-License (POL) to eliminate all Technical Specification requirements upon permanent removal of the irradiated fuel from the Shoreham site (LSNRC-2115). This request war granted by the NRC on April 25,1994, and the NRC l issued Amendment 11 to the Shoreham POL. The NRC letter approving I Amendment 11 stated that the amendment would become effective when LIPA provided certification that the irradiated fuel had been permanently removed from the site, and that the decommissioning / decontamination work on the biological shield wall had been completed.

LIPA provided such a certification on June 7,1994, and Amendment 11 to the POL became effective. It eliminated all Technical Specification requirements, including the requirement for a REMP. Therefore, this report covering the first half of 1994 (January 1,1994 through June 30,1994) will be the final and last REMP report.

9501250028 950120 PDR ADOCK 05000322 ./

R PDR

l LSNRC-2189 l Page 2 of 2 l l

if you require any additional information, please do not hesitate to contact me.

l l

Very truly yours, J c+ >c c&

Frederick Petschauer Resident Manager Enclosure cc: L. Bell w/ attachments i C. L. Pittiglio T. T. Martin R. Nimitz 1