MONTHYEARML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases 1999-10-01
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases SNRC-2145, Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination1994-03-0808 March 1994 Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination SNRC-2157, Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site1994-02-28028 February 1994 Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site SNRC-2158, Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl1994-02-28028 February 1994 Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl SNRC-2156, Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept1994-02-25025 February 1994 Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept ML20067C9271994-02-22022 February 1994 Forwards Fitness for Duty Program Performance Data for Period of Jul-Dec 1993 SNRC-2144, Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790)1994-02-0404 February 1994 Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790) 1996-05-24
[Table view] |
Text
-- -- , .
1 .'
r Long .Shoreham Nuclear Power Station Island P.O. Box 628 Power North Country Road Authority Wading River, N.Y.11792
'*"" ~2 7 MAY P,01994 U.S. Nuclear Regulatory Commission '
Attn: Document Control Desk Washington, D.C. 20555 ATTN: Mr. Robert Bernero,' Director Office of Nuclear Material Safety and Safeguards Request For Approval of Decommissioning Plan Change: Spent Fuel Storage Pool (SFSP) Decommissioning Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 Ref: 1) NRC letter dated June 11, 1992 to L. M. Hill (Long l Island Power Authority) from S. W. Brown; subject:
order Approving the Decommissioning of Shoreham Nuclear Power Station, Unit 1
- 2) Long Island Power Authority (R. M. Kessel) letter dated December 29, 1990 to NRC; subject:
Decommissioning Plan of the Long Island Power Authority for the Shoreham Nuclear Power Station i
Ladies and Gentlemen:
( -l In accordance witt. Condition 4 of the Shoreham Decommissioning -i Order (Reference 1), Long Island Power Authority (LIPA) hereby H requests NRC approval of a proposed change to 'the Shoreham ;
Decommissioning Plan (Reference 2). The requested change is for i approval of additional remedial decontamination and/or removal methods to be employed in the decommissioning of the Shoreham SFSP beyond that originally specified in the Decommissioning Plan ("b).
1
)
l
.1 230+1 = 4,
' D.
> 4 9405230276 940520 I PDR ADOCK 05000322 % l\ -
W PDR
~
~
l LSNRC-2170 Page 2 of 5 DP Section 2.2.1.1 presently indicates that the SFSP decommissioning would involve the decontamination of the SFSP walls and floors using ultra high pressure water techniques. Although LIPA still intends to perform high pressure water hydrolazing of the SFSP to decontaminate it to the maximum extent possible after all fuel has been removed, it cannot be stated with certainty at this time that the hydrolazing alone will be fully effective-in decontaminating the stainless steel SFSP liner surfaces below the radiological limits for facility release for unrestricted use.
This uncertainty is compounded by the present inability to definitively establish the characteristics of potential liner contamination (i.e., radiation levels, fixed vs. loose, depth of penetration, etc.), because of the need to maintain SFSP water levels for the safe storage and handling of the remaining irradiated fuel.
LIPA is therefore preparing to take further remedial actions to decontaminate and/or remove all or portions of the SFSP liner, should it be necessary to meet the site release criteria, as described in the following sections.
SFSP Decommissionina Activities The expected activities and sequence involved in the SFSP decommissioning process will be as described below; however variations may occur. For example, if hydrolazing proves to be sufficiently effective, no further decontamination or removal of the SFSP liner will be pursued. Conversely, if initial or subsequent survey results indicate that the depth of contamination would make further decontamination impractical, then LIPA would proceed directly with removal activities.
~
Following fuel removal, the SFSP water will be demineralized and filtered, recirculated, sampled, and drained (in accordance with Offsite Dose Calculation Manual (ODCM) requirements and approved station procedures), to the level just above where suction for the Temporary Spent Fuel Pool Cleanup System pump would be lost. This level would be several feet above the SFSP floor. At this point, residual water in the SFSP Cooling and Cleanup System (G41 system)
! piping will be drained into the SFSP, and the SFSP walls will be hydrolazed with demineralized water to remove surf ace contamination to the extent practical.
Radiological surveys will be performed during and after draindown by Health Physics personnel to monitor radiation levels in the area (none are expected), as well as contamination levels, prior to allowing personnel access within the pool cavity. ' Preparations for the removal of.the empty spent fuel storage racks and control rod blade rack will be m'ade, and hanging scaffolds will be installed to facilitate detailed surveying of the SFSP walls and additional i manual decontamination (if necessary). .!
1
d D LSNRC-2170 I Page 3 of 5 l 1
Should further dacontamination be required for the SFSP walls, manual grinding or hand wiping will be employed. Rigging and removal of racks may be performed in parallel with the wall decontamination; however, safe distances between the rigging and ,
decontamination operations will be maintained. SFSP wall decontamination and rack rigging will be performed by personnel in appropriate protective clothing, as prescribed in a Radiation Work Permit, under the direction of Radiological Controls Division personnel. Air sampling, contamination controls, ALARA measures, and other radiological controls will be employed during the decontamination as determined by Health Physics personnel. For example, measures under consideration for use during grinding include, but are not limited to, use of local HEPA-filtered ventilation and installation of screens near the top perimeter of the SFSP to prevent escape of grinding debris. As fuel racks and the control rod blade rack are removed from the pool, underwater vacuuming will be periodically used to remove materials that were beneath the racks on the SFSP floor.
Following the completion of rack removal from the SFSP, the Temporary Fuel Pool Cleanup System will be employed to demineralize and filter the remaining water inventory. A temporary pump will be placed in the SFSP sump and the remaining water will be recirculated, sampled and drained in accordance with ODCM requirements and approved station procedures. Any residual water left after draindown will be collected via a wet vacuum or other appropriate means, routed through the Temporary Fuel Pool Cleanup System demineralizer unit, and directed to the Reactor Building i
! Salt Water Drain Tank (RBSWDT). This final batch in the RBSWDT l will be recirculated, sampled, and discharged in accordance with ODCM requirements and approved station procedures.
Once all water has been removed, the SFSP cavity will again be surveyed before personnel are permitted to enter. Attachments to the SFSP floor will be mechanically removed, and the floor itself will be decontaminated by grinding and/or manual wiping, if ,
required.
Following decontamination and clean-up, detailed surveys will be '
performed to verify the effectiveness of the decontamination. If it is determined that all or part of the liner cannot meet the facility release criteria, then the liner or portions thereof will be removed for offsite volume reduction and/or disposal. A number of mechanical techniques may be employed to separate the liner from the grouting and anchorages to which it is attached, depending on the extent of removal required and the details of the configuration. These methods and the associated equipment are the same as or- similar to techniques and equipment which were l- previously approved for use during Shoreham's decommissioning.
They include: diamond wire sawing, track sawing, linear milling machines, hydraulic tearing, and hydraulic nibblers. Other comparable mechanical methods which would not pose a risk for spread of contamination may also be employed as necessary.
Ancillary activities such as core boring to provide pilot holes may also be required.
l l
i
LSNRC-2170 Page 4 of 5 Accident Analysis Considerations With the completion of fuel removal prior to conduct of the above activities and the avoidance of the use of thermal cutting techniques, there remain few significant concerns regarding potential radiological accidents as previously described in the DP.
The only remaining applicable scenarios would be the waste container drop accident, the combustible waste fire accident, and the vacuum filter-bag rupture accident. The source terms developed for these accidents in the DP, however, would be conservative with respect to the SFSP decommissioning. Thus, the consequences as previously evaluated in the DP would be bounding.
The mechanical decontamination and removal techniques do not involve any potentially catastrophic or unique processes.
Therefore, there would be no increase in the probabilities of the applicable accidents, nor would there be any new or different accidents or malfunctions of any concern that would be created.
In terms of industrial safety, standard safe rigging practices will be employed during the handling and removal of components from the SFSP, and workers performing decontamination on SFSP surfaces will use the appropriate safety equipment where necessary, e.g.,
lanyards on scaf folds, goggles and/or f ace shields during grinding, etc. ,
Environmental Impact Considerations The levels of radioactive contamination on SFSP liner surfaces are expected to be extremely low, and the mechanical decontamination and cutting techniques that will be used are unlikely to generate any measurable airborne contamination. Appropriate contamination controls and other precautionary radiological controls will nevertheless be practiced as noted earlier. Further, the radiation levels in the SFSP after fuel removal are also expected to be low enough such that no measurable radiation. exposure is anticipated.
Based on the above, no radiological impacts to workers and the general public are expected, and the estimates of such impacts provided in the DP and in the Supplement to the Shoreham Environmental Report (Decommissioning) are unaffected.
The spent fuel storage racks and appurtenances were included in the original estimate of radioactive waste identified in DP Table 3.3-
- 1. The SFSP liner was not included in this estimate; however, any stainless steel liner that may be removed will be sent to a vendor for volume reduction by smelting. The volume and curie content of any slag resulting from smelting that may ultimately require burial, will thus be minimal. With the effectiveness to date of other low level radwaste volume reduction achieved to date during decommissioning (but not assumed in the DP), the original estimate of radioactive waste provided in the DP will not be exceeded by the addition of such slag material.
4 4
P v
o, .
LSNRC-2170 Page 5 of 5 The costs of performing the additional remedial decontamination and removal of the SFSP liner, if necessary, will not cause the original $186 million project cost estimate to be exceeded.
Finally, non-radiological environmental impacts such as air quality, land and water use, noise, and dust will not be increased beyond that described in the Supplement to the Environmental Report (Decommissioning) because of the confinement of the work within the Reactor Building.
Conclusion Based on the above, LIPA has concluded that there are no unreviewed safety questions associated with the proposed DP change, and that there would be no environmental impacts dif ferent from or exceeding those set forth in the Environmental Report Supplement. This proposed DP change has been reviewed and approved by LIPA's Site Review Committee (SRC), and the SRC supports this conclusion. LIPA therefore respectfully requests that the NRC review and approve the proposed change as expeditiously as possible.
Should you have any questions or require any additional information, please do not hesitate to contact my office.
Very truly yours,
,3, A. J. Bortz Resident Manager cc: L. Bell (NRC/NMSS)
C. L. Pittiglio (NRC/NMSS)
J. Austin (NRC/NMSS) i R. Nimitz (NRC Region I) 1 J. Joyner (NRC Region I) 1
,