Forwards Rev 0 to Preliminary Sys Description for Accident Generated Water Disposal. Final Design & Fabrication of Evaporator Sys for Specific TMI-2 Application Authorized
ML20149J549
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/16/1988
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20149J552 List:
References
4410-88-L-0012, 4410-88-L-12, NUDOCS 8802230110
Download: ML20149J549 (2)


Text

.

GPU Nuclear Cor:wat!on Nuclear enesmeo a

Midcetov.n. ent.s yb a nts 17057 0191

? ti 944460t T21.E 9 2386 Wnter s Darect Dial Number; (717) 948-8461 February 16, 1.968 4410-88-L-0012/0335P US Nuclear Regulatory Commission Attn: Docuent Control Oesk Wasnington, DC 20555

Dear Sirs:

Three Mile Island N(clear Station, Unit 2 (THI-2)

Operating License No. DPR-73 Docket No. 50-320 Acci&nt Geterated Water Disposal System Description The Accident Generate <1 Eater Disposal System Oescription is forwarded for your information. The systm escription is a compilation of the most accurate design informatJcn wrrently available, and may change as the final system design evolves. The Accident Generated Water Disposal System Description is an evol<ing documnt and is subject to change until the detailed system design is finalized.

GPU Nucledt has recently authorized the system verdor to proceed with the final design and fabrication of its evaporator system for the specific TMI-2 application. GPU MJclear has decided to begin final design and fabrication prior to caproval of Technical Specification Change Request (TSCR) No. 56 in enticipation that the nngoing Atomic Safety and Licensing Board review of TSCR No, M ;ind the associated proposal to dispose of the Accident Generated Water oy eveMration will result in Nuclear Regulatory Commission (NRC) approval to pZTced as proposed and because design fabrication, installation, and test of the system would otherwise PMd some nine (9) months delay in cocinencing tiisposal of the water upon receipt of NRC approval. Delay in commencing water disposal would recult in ccr.rtensurate delays in the overall completion of ficcident Generated Water disposal and cocpletion of the clean up effort at TMI-2.

w

\

0802230110 830216

(

xe POR ADOLK 05000320 x'

Den \}

GPU Nuciear Corporatfon is a subs: diary et the General Pubhc Utihttes Corporat>on

i 9 't j' ll r Document Control Desk -$- ' Feb:r.uar / ]4 1986 ,  ;

4410 40-L-0012 i

i ,

! This system description is not interijed 46 a substitute for t*w M,tallad .

Technical Evaluation Report (TER) and spe;ific operating orce:ecures ItW3 rt<J  !

i in accordance with Tecnoical Specification 3.9.13 as reviseo by TLCR Nos 74. -

l The final system design and oparational controls will be so docment% The

) TER and detailed operating prceedures will be submitted to tfx E elen- l j Regulatory Comiss'nn for Iwvita and approval P.s required by tN TE 2  :

Recovery Technical Specificatio7s.  ;

1 Sitr.erely, .

s 4 p l

. R. Starderfer.-  ;

Of wctor, THI4 DHW/ emf I I Attachnent i

cc: Regional Administrator, Region 1 - W.1. F.uSN11 I

Director, TMI-2 Cleai@ oroject Directorate - Dr. E 0.1: avers  ;

1 .

1 8 t I

i e h

l  !

i ,

i  !

l l i

! t

i 1  !

< t i l r r i

1  :

4  :

1 I l

i e

-. . . -