Clarifies Util Intent Re Submittal of TMI-1 Implementation Schedules for Safety & Performance Improvement Program
ML20151X394
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/15/1988
From: Wilson R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
C311-88-2092, NUDOCS 8808250339
Download: ML20151X394 (2)


Text

, s e

9 GPU Nuclear Corporation arsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writer's Direct Dial Number:

1 August 15, 1988 5000-88-1613 C311-88-2092 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Safety and Performance Improvement Program (SPIP)

Implementation Schedule Submittals The purpose of this letter is to clarify GPUN's intent regarding the submittal of THI-1 implementation schedules for the Safety and Performance Improvement Program (SPIP) recommendations. In order to avoid any confusion that may result from a BLW Owners Group (BWOG) letter (Reference 2), this letter documents our understanding that the official status and schedule on TMI-l SPIP recommendations will be tracked as agreed to by the NRC and documented in the NRC staff's Safety Evaluation Report (SER) (Reference 3).

In addition to GPUN submittals, the BWOG will also be transmitting plans and schedules for implementation of SPIP recommendations for THI-l as well as for all of the B&W plants. The BWOG Reconmendation Tracking System (RTS) Report is the vehicle to be used for this purpose. Since the plant specific information contained in the RTS is provided by each utility, the RTS will also provide an overall representation of THI-l's implementation schedule and status on the SPIP recommendations.

BWOG submittal of utility plans and schedules is discussed in Reference 2.

The letter also states that each utility will be providing a letter authorizing the BWOG to submit information on its behalf. We believe that the information the BWOG will be submitting will be an accurate representation of the information submitted to the BWOG by GPUN and generally useful to the NRC staff. However, for the official status, it is our intention that TMI-l plans and schedules for implementation of the SPIP recommendations be handled as provided for throuch GPUN's Long Range Planning Program (LRPP) as described in the NRC's SER (Reference 3). The LRPP became part of THI-l's Operating License in License Amendment No. 140, dated May 27, 1988.

8808250339 000815 at PDR ADOCK 05000289 TF P PNU l*

7206f/0190f PUG Nuclear Corporat,on is a subsdary of General PutAc Utit es Corporatu J

f.

,. .w U. S. Nuclear Regulatory Commission Page 2 The SER (Reference 3) states that in the case 'of Ti1I-1, GPUN's April 4,1988 submittal provides the requested plant specific implementation schedules in a general sense and that the NRC staff intends to meet with us to discuss the details, including how the individual recommendations will be shown on our-LRPP integrated schedule. The current status of GPUN SPIP recommendations is incorporated in the BWOG June update of the SPIP Recommendation Report (Ref.

4). We trust that this method of tracking the Tlil-1 SPIP implementation schedules will be acceptable to the NRC.

In summary, the LRPP provides the appropriate mechanism for detailed coordination with the NRC regarding the implementation of individual SPIP recommendatiuns.

neer ly, f -

. F. Wi son Vice President and Director, Technical Functions

References:

1. April 4, 1988 letter, Hukill (GPUN) to Document Control Desk (NRC),

GPUN Submittal of the Integrated Schedule "ABC" List.

2. liay 10, 1988 letter, Rutherford (BWOG) to Crutchfield (NRC),

Transmittal of liarch Update of SPIP Recommendation Report.

3. June 3,1988 letter, Stolz (NRC) to Hukill (GPUN), NRC Staff's Safety Evaluation Report (NUREG-1231) on the B&W Owners Group Plant Reassessment Program.
4. July 18, 1988 letter, Stolz (NRC) to HLkill (GPUN), NRC Staff's Safety Evaluation Report (NUREG-1231) on the B&W Owners Group Plant Recssessment program.

RFW/l1RK/her cc: J. Stolz R. Hernan R. Conte W. Russell D. Crutchfield 7206f/0190f