Forwards Summary of Environ Protection Program Re Const of Grand Gulf 2 for Six-Months Ending 861231
ML20210A267
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/02/1987
From: Kinglsey O
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-87-2-0001, AECM-87-2-1, NUDOCS 8702060444
Download: ML20210A267 (3)


Text

.

EYETEM ENERGY REEMJRCE5,INC.

Ot u p D Kir A EY,JR fpfggy, February 2, 1987 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report of Six Months Ending December 31, 1986 AECM-87/2-0001 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station for Six Months Ending December 31, 1986." This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicants Construction Permit No. CPPR-119.

Please contact Dr. L. R. McKay, (601) 962-2432 if you have any questions concerning this report.

Your truly,

/

4 ODK:bms Attachment i cc: Mr. T. H. Cloninger (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. C. Butcher (w/a)

! Dr. J. Nelson Grace, Regional Administrator (w/a)

! U. S. Nuclear Regulatory Commission l Region II l 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 f&nN?hlc a a :x r; l xe, vm ma rr l wm xc fgAf J16AECM87012702 - 1 /

Attachment to AECM-87/2-0001

SUMMARY

OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING DECEMBER 31, 1986 Construction Highlights o Construction on Unit 2 is 33.8% complete. There was no construction on GGNS Unit 2 during the reporting period. All activity on Unit 2 continued to be for the purpose of protecting the Company's investment.

Vehicular Movement o No "off limit" violations were observed during the reporting period.

Dust Control o No dust control violations were observed during the reporting period.

Smoke Control o No smoke violations occurred during the six-month reporting period.

Erosion Control o Rainfall was recorded on 49 occasions during the reporting period, with an accumulated rainfall of 29.17 inches.

Chemical & Solid Waste Control o Onsite burial and incineration of construction materials continued during the reporting period. Waste oil was shipped to the Rex Brown Steam Electric Station for incineration as a fuel.. No violations or improprieties of Mississippi waste disposal regulations were observed.

o On July 31, approximately ten gallons of muriatic acid was spilled at the National Mobile Concrete area during a drum moving operation. The spill was neutralized and cleanup was completed August 1. This incident did not cause any impact on the environment.

Noise Control o No excessive noise levels were detected during the reporting period.

Sediment Basins A & B o There were no problems with either basin during the six-month reporting period.

J16AECM87012702 - 3

Attachment to AECM-87/2-0001 i

Regional Groundwater Dewatering Wells o The 12 regional groundwater wells were read 13 times during the reporting period. ' Fluctuations in water levels could be attributed to rising and falling Mississippi River water levels.

o The perched aquifer wells were read monthly during the reporting period, with only one notation. Well MW-6 had a dry reading in September. Subsequent readings were consistent with readings prior to-Septmember. Five additional monitoring wells and a dewatering well were constructed in September.

Vegetation Survey o- No vegetational abnormalities were observed during the reporting period.

Transmission Lines o No erosion problems associated with the GGNS transmission lines were identified during the reporting period. An aerial survey of the transmission lines was conducted on November 21, 1986.