EYETEM ENERGY REEMJRCE5,INC.
Ot u p D Kir A EY,JR
- fpfggy, February 2, 1987 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report of Six Months Ending December 31, 1986 AECM-87/2-0001 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station for Six Months Ending December 31, 1986." This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicants Construction Permit No. CPPR-119.
Please contact Dr. L. R. McKay, (601) 962-2432 if you have any questions concerning this report.
Your truly,
/
4 ODK:bms Attachment i
cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission l
Region II l
101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 f&nN?hl fgAf c a a :x r; l xe, vm ma rr l wm xc J16AECM87012702 - 1
/
Attachment to AECM-87/2-0001
SUMMARY
OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING DECEMBER 31, 1986 Construction Highlights o
Construction on Unit 2 is 33.8% complete. There was no construction on GGNS Unit 2 during the reporting period. All activity on Unit 2 continued to be for the purpose of protecting the Company's investment.
Vehicular Movement o
No "off limit" violations were observed during the reporting period.
Dust Control o
No dust control violations were observed during the reporting period.
Smoke Control o
No smoke violations occurred during the six-month reporting period.
Erosion Control o
Rainfall was recorded on 49 occasions during the reporting period, with an accumulated rainfall of 29.17 inches.
Chemical & Solid Waste Control o
Onsite burial and incineration of construction materials continued during the reporting period. Waste oil was shipped to the Rex Brown Steam Electric Station for incineration as a fuel.. No violations or improprieties of Mississippi waste disposal regulations were observed.
o On July 31, approximately ten gallons of muriatic acid was spilled at the National Mobile Concrete area during a drum moving operation. The spill was neutralized and cleanup was completed August 1.
This incident did not cause any impact on the environment.
Noise Control o
No excessive noise levels were detected during the reporting period.
Sediment Basins A & B o
There were no problems with either basin during the six-month reporting period.
J16AECM87012702 - 3
Attachment to AECM-87/2-0001 i
Regional Groundwater Dewatering Wells o
The 12 regional groundwater wells were read 13 times during the reporting period. ' Fluctuations in water levels could be attributed to rising and falling Mississippi River water levels.
o The perched aquifer wells were read monthly during the reporting period, with only one notation. Well MW-6 had a dry reading in September. Subsequent readings were consistent with readings prior to-Septmember.
Five additional monitoring wells and a dewatering well were constructed in September.
Vegetation Survey o-No vegetational abnormalities were observed during the reporting period.
Transmission Lines o
No erosion problems associated with the GGNS transmission lines were identified during the reporting period. An aerial survey of the transmission lines was conducted on November 21, 1986.
I i'
s i
.J16AECM87012702 - 4