|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20247R2021989-09-26026 September 1989 Partial Response to FOIA Request for Records.App C & D Records Available in Pdr.App D & Portions of App E Records Encl.App E Record Partially Withheld (Ref FOIA Exemption 6). App F Records Completely Withheld (Ref FOIA Exemption 5) ML20247L9121989-09-20020 September 1989 Responds to FOIA Request for Records Re Sept 1989 Onsite Exercise at Plant.App a & B Records Available in Pdr.App C Records Withheld in Entirety (Ref FOIA Exemption 4).App C Records Will Be Made Publicly Available Following Exercise ML20247N3491989-09-19019 September 1989 Partial Response to FOIA Request for Records.App a & B Records Available in Pdr.App B Records Encl ML20247K7711989-05-30030 May 1989 Advises That Cho of Aslab Has Informed Author That NRC 890524 Motion for 20-page Enlargement & 890605 Request for Addl 5 Days to File Brief in Response to Intervenors Briefs on Appeal from LBP-88-32,granted.Related Correspondence ML20247M4771989-03-27027 March 1989 Responds to Recipeint 890324 Request for Further Voluntary Discovery from NRC Re 1988 Exercise & Other Matters.Perrotti Comments Have Been Considered by NRC & Properly Addressed. Related Correspondence ML20236D5551989-03-20020 March 1989 Discusses 890315 Conversation Re Appearance of NRC Witnesses During Exercise Phase of Upcoming Evidentiary Hearings. Memorandum Under Preparation Requesting Waiver of Stated NRC Policy to Retain Perrotti Appearance.Related Correspondence ML20236D6781989-03-17017 March 1989 Advises of Appeal Board Intention to Hear Oral Argument on Intervenors Pending Appeal from LBP-89-04 on 890421 in Bethesda,Md.W/Certificate of Svc.Served on 890317 ML20236D6881989-03-17017 March 1989 Advises That NRC Has Understanding That Commonwealth of Ma Atty General Has Authority to Represent Commonwealth in Proceeding W/O Request by Governor or Executive Dept of Commonwealth,Per 890317 Telcon.Related Correspondence IR 05000443/19860181989-03-10010 March 1989 Forwards Insp Repts 50-443/86-18 & 50-444/86-18,per Telcon. Repts Not Responsive to Any of Commonwealth of Ma Atty General Informal Interrogatories But Contains Previous NRC Evaluation of Metpac Procedures.Related Correspondence ML20204G3761988-10-0505 October 1988 Discusses Recipient Re Transmittal of Urbanik Studies to All Parties.Apparent Fear That Board Will Improperly Rely on Matls in Rendering Decision Not Shared by Nrc.Related Correspondence ML20154Q3381988-09-29029 September 1988 Informs That Board Received Town of Merrimac 880923 Motion for Protective Order & Objection to NRC Interrogatories. Served on 880929 ML20151P1531988-04-18018 April 1988 Requests Table of Contents for Contentions Submitted by Commonwealth of Ma Atty General in Response to Seabrook Plan for Ma Communities & Short Description of Each Contention. Served on 880421 ML20148H7541988-01-22022 January 1988 Informs That Telcon Previously Provided for Has Been Set for 880127.Effort Will Be Made to Include Recipient in Call.Served on 880126 ML20238D1531987-12-24024 December 1987 Forwards Documents Belonging to Categories 2 & 3 & Draft Testimony Prepared for Presentation Before Congressman Markey Subcommittee.Documents in Category 1 Will Still Be Withheld.W/O Encls.Related Correspondence ML20237B6881987-12-14014 December 1987 Informs That List of Names of Persons Invited to Make Limited Appearance Statements on 871216 in Concord,Nh Has Been Placed on Public Record of Proceeding.List Will Be Available in Lpdr.Served on 871215 ML20236V7321987-11-30030 November 1987 Responds to Re NRC Development of Position as to Protection Afforded by State of Nh Radiological Emergency Response Plan for Beach Populations within Seabrook Epz. Related Correspondence ML20236U5231987-11-27027 November 1987 Advises That Re Pentucket Regional School Committee Position Per Emergency Planning Has Been Forwarded to FEMA for Evaluation of Offsite Emergency Preparedness. Public Hearing Will Be Held Before Full Power Operation ML20236L7591987-11-0606 November 1987 Ack Receipt of Recipient Re Action Taken Concerning Plant Emergency Planning.Ltr Being Forwarded to Aslb.Served on 871109 ML20236L8951987-11-0404 November 1987 Responds to Urging Commission to Deny License for low-power Testing at Facility in State of Nh.Decision Will Be Based on Formal Adjudicatory Record.Served on 871105 ML20235H6961987-09-25025 September 1987 Forwards 870924 Memo in Response to Petition Signed by 37 Members of State of Nh House of Representatives.W/O Memo. Served on 870929 ML20235H6121987-09-25025 September 1987 Responds to to Hf Hoyt.Special Invitation Extended to All Towns within 10-mile EPZ to Send Official Representatives to Hearing.Memo Encl.W/O Memo. Served on 870929 ML20237G9531987-08-18018 August 1987 Forwards Seabrook Siren Activation Test Procedure for East Kingston for Conduct of Test for Emergency Alert.Response Re Conduct Using Procedure & Proposed Date of Test Requested by 870825.W/o Encl.Related Correspondence ML20207A3891987-05-11011 May 1987 Ack Receipt of Re 870416 Emergency Response Planning Forum.Commission Regrets Inability to Attend Forum. Written Questions Resulting from Forum May Be Addressed to WT Russell,Region I,For Response ML20205R6341987-03-31031 March 1987 Advises That Formal Hearings Re State of Nh Radiological Emergency Response Plan Will Be Held in Us District Court in Concord,Nh.Courtroom Offers Reasonable Space & Comfort to Parties & Public ML20205A3841987-03-19019 March 1987 Responds to to Chairman Zech Re Seismic Safety of Plant.Approach for Addressing Effects of Earthquakes on Nuclear Plants Is to Define Sse.Sse Based on Evaluation of Max Earthquake Potential ML20206B3501987-03-19019 March 1987 Responds to to Chairman Zech Re Possibility of Entombment of Facility Following Accident or Core Meltdown. Protection Similar to That Provided at Chernobyl Possible. Entombment Plan Should Be Developed Soon After Accident ML20212P9861987-03-0505 March 1987 Advises That Plan for Improving Inadequate Noticing of Meetings W/Applicant Addressed in Encl Lw Zech to Ej Markey ML20211F2151987-02-18018 February 1987 Responds to Re Crack or Fissure Mended in Bedrock Located Below Plant in Course of Const.No Ref to Matter Found in Mar 1983 Ser.Pages from SER & FSAR Reviewed & Encl for Info ML20204H2111987-02-0303 February 1987 Responds to Re NRC Conducting Study of Feasibility of Entombing Facility.Nrc Has Not Conducted Studies & Should Entombment Be Needed,Sees No Impediment to Providing Protection Following Severe Core Damage Event ML20212K8451987-01-0909 January 1987 Forwards Insp Rept 50-443/86-51,in Response to to T Murley.Rept Describes Results of Insp of Allegations Made by Computerized Interference Elimination,Inc Mgt Re as-built Drawings.No Violation Noted.Meeting Scheduled for 870128 ML20207J9101987-01-0606 January 1987 Forwards BNL Draft, Technical Evaluation of Emergency Planning Zone Sensitivity Study for Seabrook. Opportunity to Discuss Draft W/Governor Staff Anticipated ML20206J4851986-10-27027 October 1986 Informs That R Strome Will Be Contact for No Significant Hazards Purposes & Will Receive Copies of Plant Lers.Final No Significant Hazards Rule Encl.W/O Stated Encl.Related Documentation Encl ML20214Q9341986-09-24024 September 1986 Responds to 860922 Request to Make Limited Appearance Statement at Reopened Hearing Beginning on 860929.ASLB Not Receiving Oral Limited Appearance Statements.Served on 860925 ML20207E8021986-06-30030 June 1986 Ack Receipt of Recommending That Radiological Emergency Response Plan Not Be Accepted & That Exercise Not Be Conducted.Ltr Forwarded to FEMA ML20155J9241986-05-21021 May 1986 Advises That 860515 Notice of Appeal & Supporting Brief Incorrectly Captioned Before ASLB Instead of Aslab.Subj Pleadings Will Be Referred to Aslab.Served on 860521 ML20155F6221986-04-16016 April 1986 Responds to Received by Author on 860415.ASLB 860117 Order Established Schedule for Hearings on New Hampshire Offsite Emergency Planning Contentions.Served on 860421 ML20137U7951986-02-12012 February 1986 Forwards State of Nh Emergency Plan,Per 860212 Conversation. Transmittal Does Not Include App E Re Evacuation Time Estimate to Town Plans.W/O Encl.Related Correspondence ML20137U8561986-02-12012 February 1986 Confirms 860212 Telcon Re Recipient to R Perlis. Emergency Plans Referred to in R Perlis May Be Obtained from State of Nh Civil Defense Agency or Facility Lpdr.Related Correspondence ML20133G0461985-07-30030 July 1985 Responds to to EM Kennedy Expressing Concerns Re Evacuation Time Estimates for Plant,Per Kennedy 850628 Request.Response Documents Encl Tl Murley to Ns Costello ML20133C9791985-07-25025 July 1985 Responds to 850611 Request for Investigation Into Quality of Const at Facilities.Nrc Investigation of Indictment of Former Employee Complete.Findings Sent to DOJ ML20128B2571985-05-0808 May 1985 Clarifies Committed Meeting Notification Actions,Per .All Parties Will Be Advised When Meeting Schedule Less than Calendar Wk Away from Date on Meeting Notice ML20238D6401984-09-10010 September 1984 Forwards Case File Documents on Investigation 1-83-008,per Request During 840905 Meeting ML20147D2781978-10-0303 October 1978 Forwards NRC Staff'S Analysis of Potential Effects of Constr Dewatering at Lamprey Pond on Well Field at Hampton Water Works Re Util Conclusion That Constr of Nuc Pwr Plant Will Have No Effect on Water Levels ML20147H9541978-08-29029 August 1978 Requests Assistance Re Indication of Unearthed & Potential Archaelogical Resources & Discussion or Mapping of Areas in the State Having High Probability of Yielding Archaelogical Resources 1989-09-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30
[Table view] |
Text
- - _ _ _ _ - _ - _ - _ - _ _ _ _ _ _ _
y.S. R UCL R REGULATORY COMMISSION wac FoaA HEQUE61 NuptUe.L FOIA E9-309
,k
. [see,h
/ useo se rm i e S- RESPONSE TO FREEDOM OF l ~u I X l eaa=
l INFORMATION ACT (FOIA) REQUEST eenee .SEP 2 61989 DoCLET NUMB (.Ri$) fff appigendel REQUE $"a ER I
l Matt hew Rrnt-k PART 1.-- AGENCY RECORDS RELEASED OR NOT LOCATED (See checked bomes)
Nu agency records subject to the request have been located.
No additional egency records subsect to the request have been located.
Requested records are available through another pubhc distributed program See Comments Section.
'y Agency records subsect to the request that are identifed on Appendialesh b are already avaHable for pubk inspecten and copying in the NXC Pubhc Document Room 2120 L Street. N.W., Washington. DC 20555 _
X Agency records subsect to the request that ase edentifed on Appendratesi are being made available for pubisc inspecten and copying en the NRC Pubhc Document Roorn, 2120 L Street, N W., Washmgton. DC. in a folder under this FOIA number and requester name.
The nonproprietary vers +on of the proposal (s) that you agreed to accept en a telephone conversation with a membef of my staff as now bemg made available for pubhc irupection and copying at the NRC Pubhc Documant Roorr. 2120 L Street N W.. Washington, DC m a folder under tnes FOIA number and requester name.
Agency records subject to the request thet are identsfed on Appendiates) may be snspected and copied at the NRC Local Public Document Room edentifed in the Comments Section.
Enclosed is information on how yb may obtarn access to and the charges for copymg reco ds placed in the NRC Pubhc Document Room. 2120 L Street. N W., l Wrshington. DC. !
Agency records subject to the request ore enclosed.
HX n Pacords subse.:t to the request have been referred to anotNr . n OCumgQ{Sareen{l05gd.NoneXemptportionsOf
- t. .ht vie a er t por t y6u.
1 You will be bmed by the NRC for fees totalmg 8 In view of NRC's response to this request. no further schon is bemg taken on appealletter dated No.
J PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE I Certain enfoemat on m the requested records is bemg withheld from pubhc disclosure pursuant to the enemptons descr$ed m and fCw the reasons stated e Pyt fl. I X secteons B. C. and D. Any released portens of the documents for whech only par' of the record is being withheld are bemg rr.ade available for pubhc inspecten and .
copymg en the NRC Pubhc Document Room. 2120 L Street, N W., Washmgton, DC.m a folder under this FOIA number and reauester name COMMENTS {
1 l
I 8909290206 890926 PDR FDIA BROCKO9-309 PDR
. /)
SIGN U E, DIRECTOR, I ISION F 1EEDOM OF INFORMATION AND PUBLICATIONS SERVICES s
. . ~ . .
. FREEDO OF INF RMATION ACT RESPONSE FOIA NUMBER <si FOIA no_yo DATE: SEP' 2 6198q PART g.B- APPLICABLE EXEMPTIONS Aecords subject to th> rsquert thst are dezeribed on th3 snelossd Appendiales) tre being withheld in thsir gntirsty or in pirt undIr the
- Estrnptions and for the reasons set forth below pursuant to 5 U.S.C. 552(b) and 10 CFR 9.17(a) of NRC Regulations.-
1, The withhMd information is properly class 6fied pursuant to Executive Order (EXEMPTION 11
- 2. The withheld information relates solely to the intemet personnel rules and procedures of NRC. (EXEMPTION 2)
- 3. The withheld information is specifically exempted from pubic disclosure by statute mdcated. (EEblON 31 9 '
Sections 141145 of the Atome Energy Act which prohibits the disclosure of Restncted Date or Formerly Resticted Data (42 U S C. 21612165L Section 147 of the Atoms Energy Act which prohibits the disclosure of Unclassified Safeguards in!armation (42 U S C i.1.
- 4. The withheld informate is a trade secret or commercial or fmancial information that is bemg withheld for the reason (sl edet* . IEXEMPTION 4) x The information is considered to be confidential business (propristory) info malion.
c.
The mformation is considered to be propretary information pursuant to 10 CFR 2.790ldHil.
c.
k:
g The information was submitted and received in confidence pursuant to 10 CFR 2.790tdM2)
- 5. The withheld informaten consists of interagenctf or antraaDency records that are not available through discovery during litegation (EXEMPTION 54 Applicchie Privilege; Cehberative Process: Disclosure of predecisionalinformation would tend to mhebat ti.a open and frank enchange of adcas essential to the deliberative process.
Where records are withheld m their entsrety. the forts are stentricably mtertwmed with the predeCisional mformation. There also are no reasonably segregable f actual K portions because the releasa of the facts would perrnst an mdirect inquiry mto the predecisenal process of the egency.
Attomey work product pnvilege (Documents prepared by an attomey m contemplation of htigation ) '
Attorney ~clent privilege (Confidential communicates between an attorney and his'hei client i y 6 J The withteld anformaten is exempted from pubic disclosure because its disclosure would resw m a cbarey unwarranted 6nvasion of personal pnvecy (EXEMPTION 6)
- 7. The withheld informaten consists of records compiled for law enforcement purposes and is being withheld for thf reason (s) andmated. (EXEMPTION 7)
Disclosure could reasonably be espected to mterfere with an enforcernent proceeding because it could reveal the scope. direction. and focus of en.
forcement efforts. and thus could possibiy allow them to take acten to shseld potential wrongdoing or a violaten of NPC requirements from evestigators.
E XEMPTION 7 tan Disclosure would constitu*e an unwarrantect envasen of personal pnvacy (EXEMPTION 7(CH The information consists of names of mdeveduals and other mformaten the disclosure tif which could reasonably be expected to reveal identities of confidentist sources (EXEMPTION 7 (DH OTHER PART 11. C-DENYING OFFICIALS Pursuant to 10 CFR 9 25(b) and/or 9 25 (c) of the U S Nuclear Regulatory Commission regulations. at has been determired that the mformation wrthheld is exempt from producteon or disclosure, and that sts production or disclosure es contrary to the pubhc mterest The persons responsible for the densat are those offcials identifeed below as cenymg oficiais and the Director. Division of F reedom of Information and Pubhcatens Servces. Off.ce of Admmistraten and Resources Management, for any densels that eney be appepied to the Esecutive Director for Operatens A DENYING OFFICIAL TITLE / OFFICE RECORDS DENIED APPELLATE Of FICIAL SE CRET ARY EDO g William T. Russell Regional Administrator. Rea. I App. F A F Y l
l 1
J l
f PART IL D- APPEAL RIGHTS The denial by each denying officialidentifed in Part II.C may be appealed to the Appellate Offcialidentified in that section. Any such appeat must be en wnting and must f
i be msde withm 30 days of receipt of this response. Appeals must be addressed as appropnais to the E xecutive Director for Operstenns or to the Secretary of the Commission.
U.S. Nuclear Regulatory Commissen. Washington, DC 20555. and should clearly state on the envelope and m the letter that it is an " Appeal frorn an initial FOI A Decisen."
i NRC FORM 464 (Part 2) U.S. NUCLEAR REGULATORY COMMISSION (11 86)
FOIA RESPONSE CONTINUATION
f
. Re: FOIA.89-309 F ,
['
? . 3' APPENDIX C- !
RECORDS MAINTAINED AMONG PDR FILES
-NUMBER DATE' DESCRIPTION-
- L ,10/9/86- Memo from T. Nurley to H. Denton, subject: Seabrook Stetion, Unit 1 Low Power License Recommendation, (3 pgs), Acc. d.
t 8706080162, with enclosure: Initial Operating License Review Report for Seabrook. '(83 pgs) Acc. No. 8706080166
- 2. 11/22/88 Memo from W. Russell to T. Murley,' subject: Seabrook Station.
Unit 1 Low Power License Recommendation, Supplement 1, (2 pgs).
Acc. No. 8908250194, with enclosure: Initial Operating License Review Report, Supplement 1 for Seabrook Unit 1. (35 pgs)
Acc..No.'8908250197 3.- 6/26/89 Letter from E. Reis to the Board re: CAL-89-ll. (3 (This document was sent to the Service List Parties) pas)'
- 4. 7/14/89 Letter from W. Kane to E. Brown, enclosing: NRC Region I Readiness Assessment Team Inspection Report 50-443/89-80.
Acc. No. 8707240017. (This documents was also sent to the Service List Parties) i l
l L_ - - - - - - - - - - - - -- - - - - - - - - - - . - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - -
)
.1. .
i pi APPENDIX D L DOCUMENTS BEING PLACED IN THE PDR p FOIA REQUEST NUM8ER 89-309 DATE sRIGINATOR . RECIPIENT DESCRIPTION
.f. 12/20/88 G. Kann D. Moody Intra-Company Business PSNH- PSNH Memo
Subject:
'Startup Test. Department Personnel Qualification and Training Matrix (5 Pages)
- 2. Undated Seabrook AIT Report Handwritten Notes (1 Page)
- 3. Undated Trip Notes (1 Page)-
- 4. Approved Seabrook Station Startup Test Procedure Field Change - Test No.
6/21/89 1-ST-22 (28 Pages)
- 5. 6/29/89 R. Gwinn P. V. Gurney Memo
Subject:
Basis for NHY NHY the Minimum Pressurizer Level Trip Criteria for the Natural Circulation Test 1-ST-22 (1 Page)
- 6. Approved Quality Assurance Surveillance Checklist / Report - QSAR No. 89-00577 5/8/89 (3 Pages) 7._ Reviewed Quality Assurance Follow-uo Report - QASR 89-00577(2Pages) 8/3/89
- 8. 6/16/89 J. Warnock D. E. Moody Memo
Subject:
Quality NHY NHY Assurance Audit Report No. 89-A05-01,
" Technical Specification" (IS Pages) g, Approved Quality Assurance Surveillance Checklist / Report - QASR No. 89-00549 6/16/89 (6 Pages)
- 10. Approved Quality Assurance Surveillance Checklist / Report - QASR No. 89-00417 6/5/89 (4 Pages) jj* Approved Quality. Assurance Surveillance Checklist / Report - QASR No. 89-00383 5/18/89 (6 Pages)
i
^
, ,2 APPENDIXD DOCUMENTS BEING PLACED IN TiiE PDR FOIA REQUEST NUMBER 89-309 DATE ORIGINATOR RECIPIENT .
DESCRIPTION
- 12. Approved Quality Assurance Surveillance Checklist / Report - QASR No. 89-00399 5/26/89 (9 Pages)
- 13. Approved Quality Assurance. Surveillance Checklist / Report - QASR No. 89-00480 5/10/89 (4 Pages).
- 14. Undated Nuclear Quality Group (NQG) - Summary (1/1/89 - Present) and Procedural Noncompliance (3 Pages)
- 15. Undated Handwritten Notes (1 Page)
- 16. Undated Miscellaneous Pages from Procedures (5 Pages)
- 17. 1/16/89 G. Kann J. M. Peschel Memo
Subject:
PSNH PSNH Startup Test Program Administration (1_Page) 18, 5/25/89 Seabrook Open Items by Contributing Department (1 Page) 19.. 1/9/89 A. Merrill P. Gurney Memo
Subject:
PSNH PSNH Non-Procedural MTC &
ITC Translation to Parametric Conditions (2 Pages)
.20. Undated Handwritten Notes (1 Page)
- 21. Undated Handwritten Notes (1 Page) 22* Undated Front Panel / Rear Panel Diagram with the C-E Reactivity Computer Users Guide (23 Pages)
- 23. 1/1/80 Wishlist (1 Page)
- 24. Undated 1-ST-16, Rev. 4, 1-ST-19, Rev. 2 with miscellaneous pages dealing with Test Procedure Review (5 Pages)
- 25. 6/12/89 Test critique (3 Pages)
- 26. 6/22/89 NRC Event Notification Worksheet (2 Pages)
F i
~~
APPENDIX D o
DOCUMENTS BEING PLACED IN THE PDR . . .;. p r % -
F0IA REQUEST NUMBER 89-309 ,
DATE ORIGINATOR RECIPIENT . DESCRIPTION
- 27. 7/10/89 E. Brown 'All Site Employees Memo
Subject:
Procedural NHY -Compliance (1Page)
- 28. 7/19/89 E. Brown All New Hampshire Memo
Subject:
Core NHY Yankee Employees Values and Work Ethic (5 Pages)
- 29. 6/22/89 NHY - Seabrook Station Main Plant Computer System Post Mortem Report (72 Pages)
- 30. 6/29/89 M. Miller J. Huntington Phone Conversation Region I, NRC Atty General's (1 Page)
Office, State of NH
- 31. Undated Portion of Drawing from FSAR (1 Page)
'32. 6/30/89 R.'Strome W. Russell Request for access to State of NH- Region I, NRC the ongoing investigation Executive Dept., of. circumstances Office of surrounding the shutdown Emergency Mgmt. of low power testing at Seabrook (2 Pages)
- 33. 7/12/89 G. Huntington W. Russell Confirmation of phone Atty General's Region I, NRC conversation 7/11/89 Office, State (I Page) of NH
- 34. 7/6/89 Fax sheet (undated) with attachments NHY Memo SSP #890965 and Seabrook LCO on RCS - Pressure / temperature Limits for Pressurizer (3 Pages).
- 35. 7/13/89 NHY Press Release (3 Pages)
- 36. Multi Newspaper Articles on Seabrook (23 Pages)
Dates
- 37. 8/8/86 NRC Manual Chapter 0513 - NRC Incident Investigation Program (16 Pages)
Letter from J. J. Warnock, PSNH, regarding SAT recommendations. (39 pgs)
- 38. 10/31/88
- 39. 5/ 21/89 Letter from V. Nerses to E. Brown, subject: Seabrook Low Power Physics Tests. (16 pgs)
_ _ -- - - _ - - - - - _ - - _ - - _ - - - . - - - _ - _ _ . _ - - - _ . _ _ _ i
~4-
- h. RE: F01A-89-309 - .
APPENDIX'D l
- h. DOCUMENTS BEING PLACED IN THE'PDR !
j L :
40.: 6/26/89 . Memo from' V. Nerses to. addressees, re:. Seabrook - Compfetion of Low l Power Testing. (.1 page)
,~m ,a ,
. , , . , ., ,- .c ,, , ,
41.. .
Undated Handwritten memo from "Me" to " Russell" re: NRC Observation Regarding J
' Seabrook Natural Circulation Test.. C'1.page) :
.i42.- Undated..Section Assignment Inputs. .(6 pgs) l i
i
.i 0
1 i
4
.I i
l 4
l
.l i
i
- _ _ . - - - . . - . . _ - _ _ _ . _- ----____-_----._-_-___-_.--- _ ..-- --.-. _ _ _ A
n . . ,. ..
< . h: ,
',i_[.' ,
ire: LF01A
'Ro ano.
};p Q ,
.APPE'NDIX E-
- ' RECORDS PARTIALLY WITHHELD
.;c NUMBER ,
.-DATE - -
DESCRIPTION & EXEMPTION:
ic % .l.- -
. 7/19/86 Power Ascension Test Group i Transient ~ Analysis . Test. - (8 pgs) ~ .
[/ ?%. . - - Portions withheld pursuant' to. Exemption 6, -
S;_;l\.
0
.;.k-;.
E
,h-
' s .
r yk.
5 1
i s
.i T
.S' N, ( .,'1 J
_t. - . -- - - . _ _ _ . _ _ _ _ _ . - _ _ . - - . . _ . - - - _ . - - - - _ _ . _ -
p .y - - - - - - - - - -
7 T. -1 l ,
6 ..
L
' APPENDIX' F .v 1
l WITHHOLD IN ENTIRETY UNDER EXEMPTION 5 ,
L FOIA REQUEST NUMBER 89-309 DATE ORIGINATOR RECIPIENT DESCRIPTION
- 1. Undated Handwritten Notes (1 Page)
- 2. Undated Handwritten No'tes (1 Page) l 3. Undated Handwritten Notes (1 Page)
,4 Undated Input to AIT Inspection (6 Pages)
- 5. Undated Inspection Input (6/9-6/11) M. Markley (3 Pages)
- 6. Undated Test Group Section (6 Pages)
- 7. Undated Seabrook AIT Report Topical Outline (Draft) (7 Pages)
- 8. Written Draf t Input to AIT (37 Pages) 6/25/89
- 9. Undated Draft Input to AIT (15 Pages)
- 10. Undated Adequacy of Technical Support Staff Response to the Event (5 Pages)
- 11. Multi NRC Log Record 5% Power Testing (63 Pages)
Dates
- 12. Undated Stuck Rod Test (11 Pages) 13; 4/13/89 Draft Memo
Subject:
Augmented Inspection Team (AIT) (2 Pages)
- 14. Undated Handwritten Notes (2 Pages)
.15. Undated Draft Handwritten Notes and Typed Version (22 Pages)
- 16. Undated Section 4 Plant and Equipment Performance (7 Pages)
- 17. Undated Section 5 Operations (7 Pages)
Ic. Undated Draft Input (11 Pages)
l.l -2 g_ . -
l AFPENDIX F M '
n gp.. . mv. .eu -w m-w J
. -- , .y .
.,,a .
WITHHOLDINENTIRETYUNDEREXEMPTI5e
- +nM~WW F0IA REQUEST NUMBER 89-309-DATE ORIGINATOR RECIPIENT DESCRIPTION
~19. Undated- Draft Appendfx'A & 8 (5 Pa9es)
- 20. . Undated DraftChronologyofEvents(8Pages)
- 21. Undated AIT Input or References (21 Pages)
- 22. 7/2/89 ExitNotes(6/30/89)(Draft)(5.Pa'ges)
- 23. 7/2/89 Seabrook AIT Exit Notes (43 Pages)
- 24. Orafts of Augmented Inspection Tears Inspection Report No.
50-443/89-82 (744 Pages) 2b. Note's on Plant Trip (3 Pages)
- 26. 6/26/89 Notes (1 Page)
(cont'd)
- 27. 6/28/89 Inspection Summary Report No. 50-443/89-81, OI List, 766 and Report Draft (37 Pages)
- 28. Undated Exit Meeting 6/23/89 Notes for Team Inspection 89-81 (4 Pages) 29* 7/5/89 Questions from July 5,1989 Operating Reactors Events Briefing Concerning Seabrook Event on 6/22/89 (AIT) (1 Page)
- 30. 7/19/89 Draft Inspection No. 50-443/89-81 (54 Pages)
- 31. Undated Changes to Draft (4 Pages)
_ _ - - - - - _ - - - - - - - - - - - - - - - -