ML20247N349
| ML20247N349 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/19/1989 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Brock M MASSACHUSETTS, COMMONWEALTH OF |
| Shared Package | |
| ML20247N354 | List: |
| References | |
| FOIA-89-309 NUDOCS 8909260200 | |
| Download: ML20247N349 (4) | |
Text
_
U.S. NUCL AR RE!ULATORY COMMIS$10N wuc oia atouuit muustnisi FOlA 309 4,,s a.es i [*%
g s
atspoNSE TYPf RESPONSE TO FREEDOM OF
_I"a^'
I X l e^at'^t
~
i
'NFORMATION ACT (FOIA) REQUEST SEP 191989
^"
%*ese e
DOCKET NUMBERIS) fff apphcstWet Rt DUE51t H
~~
Matthew Brock PART l.- AGENCY RECORDS RELEASED OR NOT LOCATED (See checked boxes)
No agency records subsect to the request have been located.
No additional agency records subject to the request have been located.
l Requested records are available through another public distributed program. See Comments Secton.
Agency records sub ect to the request that are identifed on Appendentes)
A
.,e ai,eady avaiiebie io,,ubic inspeciion and copy g,, the l
X NRC Pubiec Document noom 2t20 t Sireet. N w.. weshogion. DC 20sss y
Aspency records sublect to the request that are adentsfied on Appendsates) b are being made available for pubic enspection and copymg in the NRC Pubic Document Room, 2120 L Street, N W., Washmgton, DC, m a folder under this FOIA number and requester name l
The nonpropnetary version of the proposalls) that you agresd to accept in a telephone conversation with a member of my staff is now bemg made available for pubic incpecten and copying at the NRC Public Document Room 2120 L Street, N.W., Washington, DC, in a folder under this FOIA number and requester name.
l Agency records subject to the request that are adentifedon Appendeales) may be inspected and coped at the NRC Local Public Document Room identified i
in tte Comments Secten.
wesn ed is information on how you may obtain eccess to and the charges for copyng records placed en the NRC Pubic Document Room.
Enclos X
gton, DC.
(Appendix B records)
X
^8'"**'**'d'""*'**
'"' " . encioned.
Records subject to the request have been referred to another Federet agencytee*) for review and direct response to you.
You will be billed by the NRC for fees totaling 6 in view of NRC's response to this request, no further action as bemg taken on appealletter dated No.
PART 11. A-INFORMATION WITHHELD FROM PUBUC DISCLOSURE Certam information an the requested records is bems withheld from pubhc disclosure pursuant to the enemptons described m and for the reasons stated m Part it, sectens B. C, and D. Any released portons of the documents for which only part of the record es bemg withheld ere bemg made avadabe for puble mspection and Copyng m the NRC Public Document Room. 2120 L Street, N W., Washington, DC. m a folder under this FOIA number and requester name COMMENTS l
l l
l 8909260200 890919 PDR FOIA BROCK 89-309 PDR M
SIG E, DIRECTOR, plylSION O EEDOM y INFORMATION AND PUBLICATIONS SERVICES 6%n H.
AL> cfm I
.. ~.. ~ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _,
Re: F01A-89-309 APPENDIX A DOCUMENTS ALREADY IN THE PDR 1.
6/22/89 Preliminary Notification of Unusual Event or Occurrence (PNO)
PNO-I-89-48. Accession No. 8906270474 2.
6/23/89 Ph0-I-89-48A. Accession No. 8906300054
'3.
6/26/89 PNO-I-89-488. Accession No. 8906290417 4.
6/30/89 PN0-I-89-48C. Accession No. 8907100194 5.
6/23/89 Letter from W. Russell to E. Brown. Accession No. 8906300234 6.
6/26/89 Letter from E. Reis to I. Smith. Accession No. 8907030072 7.
8/11/89 Letter from 8. Boger to E. Brown. Accession No. 8908230185 I
Re: FOIA-89-309 APPENDIX 8 DOCUMENTS BITNIMTKCED IN THE PDR
-1.
S'/13/87-Seabrook Station Startup Test Program Description Revision 2, (24 pages)
-2.
12/87...
Seabrook Station Facility Description.
(39pages) 3.
4/14/89 Seabrook Station Startup Test Procedure, Rev. 2.
(11 pages)
L l
4.
5/10/89 PSCOs, NH Seabrook Startup Personnel Chart.
(1 page) 5.
6/14/89 RECALC-89-0004, IR Detector Conversion Constants for Core Exposure Tracking During the Low Power Test Program.
(12 pages) 6.
6/15/89 NRC Entrance Interview Attendance List.
(1page) 7.-
6/21/89 "55' Update," with attached handwritten notes.
(2'pages) 8.
6/23/89 Regional Duty Officer Log.
(1 page) (Some portions are cutside the scope of the request.)
9.
6/23/89 New Hampshire Yankee News Release.
(1 page) 10, 6/23/89 NRC Exit Interview Attendance List.
(2 pages)
- 11. Various News articles on Seabrook.
(9 pages)
- 12. 6/26/89 NRC Press Release I-89-123 - NRC Augmented Inspection Team Sent to Seabrook Station to Examine Problem During Low Power Testing.
(1 page)
- 13. 6/26/89 New Hampshire Yankee News Release - New Hampshire Yar.kee Announces Cool Down of Seabrook Station.
(1 page)
- 14. 6/26/89 Memo from T. Martin to W. Russell, subject: NRC Observations Regarding Seabrook Natural Circulation Test.
(4 pages)
- 15. 6/27/89, Memo from W. Russell to W. Kane, subject: Augmented Inspection Team (AIT) - Manual Reactor Trip During Natural Circulation Test at Seabrook Station Unit 1.
(3 pages)
'16.
6/30/89 News article.
(1 page)
E Re: F01A-89-309 APPENDIX B DOCUMENTS BEING PLACED IN THE PDR (Continued)
- 17. 7/13/89 PR Newswire arti.cles.
(3pages)
- 18. Undated Time Line 6/15 - 6/22/89 - Seabrook 5% Testing Support, NRC.
(1 page)
- 19. Undated Control Building Unit 1 Diagram 75'0" EL.
(1 page)
- 20. Undated Handwritten Natural Circulation Test.
(1 page)
- 21. Undatef Preliminary Results and Time Lint (6/13/89-6/21/89).
(4 pages) 22, 5/22/89 Memo from L. Chandler to T. Piurley, regarding CLI-89-08.
(2pages)
_