ML20215M527

From kanterella
Revision as of 18:12, 18 April 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Problem W/Response Time of Moderate Energy Line Cracking Temp Sensing Devices.Initially Reported on 860708.W/o Encl
ML20215M527
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/08/1986
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0810), (NMP2L-810), NUDOCS 8611030002
Download: ML20215M527 (1)


Text

.

M V NIAGARA R u MOHAWK NIAGARA ASONAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 4741511 August 8, 1986 (NMP2L 0810)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Reactor Projects 631 Park Avenue King of Prtissia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is a final report, in accordance with 10CFR50.55(e), for the problem concerning response time of moderate-energy line crack temperature sensing devices. This problem was reported via tel-con to G. Meyer of your staff on July 8,1986.

Very truly yours, C. V. Mangan Senior Vice President CVM/GG/cla (1696H) xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 W. A. Cook, NRC Senior Resident Inspector NMPC Project File 8611030002 860008 POR ADOCK 05000410 S PDH h